• Title/Summary/Keyword: Rail broken

Search Result 18, Processing Time 0.023 seconds

Evaluation of Installation Length of CWR Considering Rail Tenser's Capacity And Track Maintenance (레일긴장기의 성능을 고려한 효율적인 장대레일 설정방법)

  • Park, Ok-Jeong;Kim, Eung-Rok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.72-79
    • /
    • 2010
  • The significant of continuous welded rail (CWR) management is growing because KORAIL has the plan to convert the whole of conventional railway lines into CWRs through continuous activities since constructed the CWR track with 1.8km in Gyeongbu line in 1966. The CWR recently is needed a efficient management method because it is difficult to manage the CWR by the poor of technic and equipment, limited maintain labor force and shorted the maintain work time of CWR caused by industrialization, greenhouse effect and global warming In this point, The 70ton Tenser's which is using in the rail site has been analysised with no extra tenser's capacity in case of the under low temperature and exceed the length of 1km as a result of reviewing the CWR-related rules and standards, a series of records of safety accidents, operation obstacles, and the situation of broken rails published by KORAIL, existing rail temperature measurements, and CWR researches. Therefore avoid the excessive plan of the first set-up section, choice the proper time in the normal temperature that is possible to weld the rail, turning the difference of rail temperature and Installation temperature down is desirable.

  • PDF

A Study on Analysis of Impulse Track Circuit using PSCAD/EMTDC (PSCAD/EMTDC를 이용한 임펄스 궤도회로의 계통분석 연구)

  • Park, Ki-Bum;Lee, Tae-Hoon;Ryu, Young-Tae;Jeon, Yong-Joo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.433-441
    • /
    • 2009
  • We have studied a weird phenomenon on the High Voltage Impulse Track Circuit (HVITC). The biggest problem is that can not recognize the fault states, despite the fact the rail is broken. This study has shown that current HVITC systems can be operated even an ill-contact state of impedance bond lead wire. This study was carried out using various methods, such as measurements using an oscilloscope with voltage and current probes, simulations using PSCAD/EMTDC software tool, and analysis of measured data. Especially, we have simulated the fault state through bypass circuits using PSCAD/EMTDC software tool. We made a model of track circuit and simulated various types of fault states.

  • PDF

A Study on Interference between High Voltage Impulse Track Circuit(HVITC) and AF Track Circuit (고전압임펄스궤도회로(HVITC)와 AF 궤도회로간의 간섭에 대한 연구)

  • Lee, Hee-Jin;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.232-240
    • /
    • 2015
  • Two types of track circuits are used in high speed railway car depots: one is High Voltage Impulse Track Circuit(HVITC); the other is AF track circuit. HVITC detects train occupation of blocks and broken rail; the AF track circuit is used for train onboard control system pretesting before departure. This testing is used to transmit train control information through the AF track circuit. The two systems are switched in turns for testing. We propose a system in which the AF track circuit is replaced by a loop cable that is installed on the inside rail; as such, engineers do not need to switch the systems. In cases in which the two systems run simultaneously, mutual interference may occur. In this paper, we identified this mutual interference by modeling of the two circuits.

Assessment on Mechanical Performance of Porcelain and Glass Insulators by Pendulum Weight (진자 추에 의한 자기 및 유리애자의 기계적 성능 평가)

  • Shong, Kil-Mok;Kim, Jong-Min;Kim, Young-Seok;Bang, Sun-Bae;Kim, Sun-Gu;Jeon, Yong-Joo
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.06a
    • /
    • pp.475-476
    • /
    • 2008
  • This paper is an experimental test for the close examination of breakdown causes of glass insulators using at the electric rail-road. The glass insulator is estimated the mechanical performance according to hitting test(ST-100, Sharp-Eng, KOR) that is based on KSC 3810. Insulators is damaged by pendulum weight at the steps of hitting angles. Glass and porcelain insulators are broken at the hitting angle of $72^{\circ}$. From the these results, glass insulator absorbed the impact from the pendulum weight but on the porcelain insulator, it is not transmitted vibration by impact. Hereafter, these results are expected that is used the data for the assessment on breakdown cause of a glass insulator.

  • PDF

A Study on Analysis Electrical Characteristics of Cable Lenght change about area Boundary of UM71C Audio Frequency Track Circuit (고속철도 AF궤도회로경계구간 케이블길이 변화에 따른 전기특성 분석연구)

  • Choi, Jae Sik;Kim, Hie Sik;Park, Ju Hun;Kim, Bum Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4849-4854
    • /
    • 2015
  • It has been often occurred for the outside components(BU, SVaC, DB) of UM71c AF track circuits to be broken down caused by some pieces of falling ice in the winter time or by infrastructure repairing equipments while facility maintenance works since 2004, opening of Kyeongbu High Speed Rail Express. In this paper, we proposed that we could move the outside components of UM71c track circuit out of wayside from present place. Then we can assure that the life time of those components would be extended. So we simulated the electrical characteristics by changing cable length using MATLAB Simulinks and we designed the compensation capacitor. Also, we obtained the same results as those of simulation by field demonstration test on site. The design specifications obtained from this field verification test could be applied in the absent section of track circuit, if only have a little more intensified research to compensate changed electrical characteristics and to redesign inner impedance of the track circuit.

Analysis of Train Delay in Daejeon Metro (대전도시철도의 열차 지연운행 분석연구)

  • Kwon, Young-Seok;Lee, Jin-Sun
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.1
    • /
    • pp.50-57
    • /
    • 2017
  • This study investigated the causes and problems of train operation impediments through the statistics analysis of 8 years'internal data of Daejeon Metropolitan Express Transit. By evaluating the risks regarding the system, equipment, and parts of high risk group, this study measured the Risk Index Severity, and applied the $5{\times}5$ Risk Assessment Matrix which is a method of risk management to calculate the scale of risk to analyze the safety level and allowance range. As a result, the car sector, the most serious risk, followed by machinery and equipment sector showed that the inherent risk. In particular, the door broken and the door rail signaling and control devices due to defects of the vehicle is high, but also the severity, and frequency are showing very frequent additional potential accidents. PSD also had defects in the machinery sector appeared to be the most dangerous of the PSD poor safety gates, it was found that the glass also involve the risk of mishandling and breakage of the PSD. This study intended to contribute to the transportation benefits through the safety and stable operation of Metropolitan Express Transit.

Analysis of Return Current Effect for Track Circuit on Ho-Nam high Speed Line (고속열차 운행에 따른 호남고속철도 궤도회로 귀선전류 영향 분석)

  • Baek, Jong-hyen
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.42 no.5
    • /
    • pp.1110-1116
    • /
    • 2017
  • Depending on the operating characteristics, track circuit is installed for the purpose of direct or indirect control of the signal device, point switch machine and other security device. These are mainly used for train detection, transmission of information, broken rail detection and transmission of return current. Especially, the return current is related to signal system, power system and catenary line, and track circuit systems. It is one of the most important component shall be dealt for the safety of track side staff and for the protection of railway-related electrical system according to electrification. Therefore, an accurate analysis of the return current is needed to prevent the return current unbalance and the system induced disorder and failure due to an over current condition. Also, if the malfunction occurred by the return current harmonics, it can cause problems including train operation interruption. In this paper, we presented measurement and analysis method at return current and it's harmonics by high speed train operation on the honam high speed line.

A Study on Estimating Optimal Tonnage of Coastal Cargo Vessels in Korea (우리나라 연안화물선의 적정선복량 추정에 관한 연구)

  • 이청환;이철영
    • Journal of the Korean Institute of Navigation
    • /
    • v.13 no.1
    • /
    • pp.21-53
    • /
    • 1989
  • In the past twenty years, there has been a rapid increase in the volume of traffic in Korea due to the Korean great growth of the Korean economy. Since transformation provides an infrastructure vital to economic growth, it becomes more and more an integral part of the Korea economy. The importance of coastal shipping stands out in particular, not only because of the expansion limit on the road network, but also because of saturation in the capacity of rail transportation. In spite of this increase and its importance, coastal shipping is falling behind partly because it is givenless emphasis than ocean-going shipping and other inland transportation systems and partly because of overcompetition due to excessive ship tonnage. Therefore, estimating and planning optimum ship tonnage is the first take to develop Korean coastal shipping. This paper aims to estimate the optimum coastal ship tonnage by computer simulation and finally to draw up plans for the ship tonnage balance according to supply and demand. The estimation of the optimum ship tonnage is peformed by the method of Origin -Destimation and time series analysis. The result are as follows : (1) The optimum ship tonnage in 1987 was 358, 680 DWT, which is 54% of the current ship tonnage (481 ships, 662, 664DWT) that is equal to the optimum ship tonnage in 1998. this overcapacity result is in excessive competition and financial difficulties in Korea coastal shipping. (2) The excessive ship tonnage can be broken down into ship types as follows : oil carrier 250, 926 DWT(350%), cement carrier 9, 977 DWT(119%), iron material/machinery carrier 25, 665 DWT(117%), general cargo carrier 17, 416DWT(112%). (3) the current total ship crew of 5, 079 is more than the verified optimally efficient figure of 3, 808 by 1271. (4) From the viewpoint of management strategy, it is necessary that excessive ship tonnage be reduced and uneconomic outdated vessels be broken up. And its found that the diversion into economically efficient fleets is urgently required in order to meet increasing annual rate in the amounts of cargo(23, 877DWT). (5) The plans for the ship tonnage balance according to supply and demand are as follows 1) The establishment of a legislative system for the arrangement of ship tonnage. This would involve; (a) The announcement of an optimum tonnage which guides the licensing of cargo vessels and ship tonnage supply. (b) The establishment of an organization that substantially arrangement tonnage in Korea coastal shipping. 2) The announcement of an optimum ship tonnage both per year and short-term that guides current tonnage supply plans. 3) The settlement of elastic tariffs resulting in the protect6ion of coastal shipping's share from other tonnage supply plans. 4) The settlement of elastic tariffs resulting in the protection of coastal shipping's share from other transportation systems. 4) Restriction of ocean-going vessels from participating in coastal shipping routes. 5) Business rationalization of coastal shipping company which reduces uneconomic outdated vessels and boosts the national economy. If we are to achieve these ends, the followings are prerequisites; I) Because many non-licensed vessels are actually operating and threatening the safe voyage of the others in Korea coastal routes, it is necessary that those ind of vessels be controlled and punished by the authorities. II) The supply of ship tonnage in Korean coastal routes should be predently monitored because most of the coastal vessels are to small to be diverted into ocean-going routes in case of excessive supply. III) Every ship type which is engaged in coastal shipping should be specialized according to the characteristics of its routes as soon possible.

  • PDF