• Title/Summary/Keyword: Rail Curve

Search Result 131, Processing Time 0.035 seconds

Experimental Analysis of Wheel Radiation Noise of HANVIT 200 Train in Curve Lines (곡선부에서의 한빛 200 열차 차륜방사 소음 특성)

  • Lee, Chan-Woo;Kim, Jae-Chul
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.907-910
    • /
    • 2008
  • The wheel radiation noise characteristic of Korean tilting train(Hanvit 200) on curved rail under the field test conditions is analyzed in this paper. The test railroad track was selected from Seodaejon to Songjeongri in Honam line. $5^{th}$ and $6^{th}$ car are decided to measure radiation noise level among a train of six cars. The test subject curve radius executed from R400, R500, R600, R700 and R800 segments. The speed of test trains when from R600 and R800 curves existing operation speed and speed up 20% of existing speed. On curved rail at the time of operation speed of Hanvit 200 trains from below 95km/h wheel radiation noise level at $94dBA{\sim}99dBA$, the operation speed from between $100km/h{\sim}144km/h$ wheel radiation noise level at $100dBA{\sim}106dBA$.

  • PDF

Simulation for High Speed Trains with Wheel - Rail Fuzzy Adhesion model (휠-레일 점착 퍼지 모델에 의한 고속전철의 주행 시뮬레이션에 관한 연구)

  • Kim, Moon-Sup;Kim, Dong-Woo;Shin, Doo-Jin;Huh, Uk-Youl
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.347-349
    • /
    • 1998
  • This paper describes a fuzzy identification model for slip - adhesion curve of High - speed trains. The model has fuzzy inputs corresponding to rail condition and crisp inputs for train. Nonlinear function is obtained by using fuzzy outputs. Finally slip - adhesion curve is given by the function. First, Results are presented of slip - adhesion curves under the influence of changing rail condition. Second, Dynamic moving simulation by proposed fuzzy slip - adhesion model is presented. Simulation results show fine characteristics.

  • PDF

The Fatigue Life Evaluation of CWR based on the Rail Grinding (레일연마를 고려한 장대레일의 피로수명 평가)

  • Kong, Sun-Young;Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1191-1198
    • /
    • 2015
  • In this study, vehicle/track interaction analysis by the Saemaul powered vehicle was carried out. The prediction equation for the bending stress of rail was estimated using the rail bending stress by the rail surface irregularities at welds. Also, the fatigue analysis using a S-N curve of welds in the conventional railway was carried out. We estimated the fatigue life of CWR by the fracture probability. By the rail grinding, the fatigue life of CWR was evaluated in consideration to reduce the rail bending stress through removing the rail surface irregularities. Therefore, it presented the fatigue life of CWR according to the rail grinding execution plan in the conventional railway.

An analytical solution to the mapping relationship between bridge structures vertical deformation and rail deformation of high-speed railway

  • Feng, Yulin;Jiang, Lizhong;Zhou, Wangbao;Lai, Zhipeng;Chai, Xilin
    • Steel and Composite Structures
    • /
    • v.33 no.2
    • /
    • pp.209-224
    • /
    • 2019
  • This paper describes a study of the mapping relationship between the vertical deformation of bridge structures and rail deformation of high-speed railway, taking the interlayer interactions of the bridge subgrade CRTS II ballastless slab track system (HSRBST) into account. The differential equations and natural boundary conditions of the mapping relationship between the vertical deformation of bridge structures and rail deformation were deduced according to the principle of stationary potential energy. Then an analytical model for such relationship was proposed. Both the analytical method proposed in this paper and the finite element numerical method were used to calculate the rail deformations under three typical deformations of bridge structures and the evolution of rail geometry under these circumstances was analyzed. It was shown that numerical and analytical calculation results are well agreed with each other, demonstrating the effectiveness of the analytical model proposed in this paper. The mapping coefficient between bridge structure deformation and rail deformation showed a nonlinear increase with increasing amplitude of the bridge structure deformation. The rail deformation showed an obvious "following feature"; with the increase of bridge span and fastener stiffness, the curve of rail deformation became gentler, the track irregularity wavelength became longer, and the performance of the rail at following the bridge structure deformation was stronger.

A Study on Dynamic Modeling and Analysis of a Wheelset (휠셋의 동역학 모델링 및 해석에 관한 연구)

  • Kang, Ju-Seok
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1851-1855
    • /
    • 2011
  • The accuracy of wheel-rail contact analysis is mainly determined by the methods to find wheel-rail contact points and to calculate contact forces. The 2-dimensional approach which calculates contact points based on the profile curves of the wheel and rail has advantage of reducing calculation time but shortage of approximating the solutions when comparing with 3-dimensional analysis In this analysis, wheelset dynamic behaviors calculated by the approach based on the 2-dimensional wheel-rail curves are compared with those by the 3-dimensional wheel-rail surfaces. Yaw angle and lateral displacement of wheelset center are compared when negotiating a curve.

  • PDF

The effect of Mobile Flash Butt Welding (이동식 플래시 버트 용접의 효과)

  • Lee Jun-Sik;Lee Jong-Su;Lee Hak-Kyu;Lee Jung-Kwon;Lee Jee-Ha
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.793-799
    • /
    • 2004
  • In track a third weakness point is joint part, turnout part, curve part. One of them joint part of rail have been known to the most weak point by loosen of joint bar and fish bolt due to impulse and vibration by wheel contact at times. In addition happen to deformation and failure at end of rail, failure and miniature of ballast gravel. Finally impact between wheel and rail become origin cause of a welded rail, noise and vibration. riding condition deterioration, besides track failure. In the present domestic, Thermite and Gas pressure weldings have been used to continuous welded rail(CWR), however stiffness and confidence in quality is lower than Flash butt welding method. FRW have the excellent capacity, however have a shortcoming large scale of machine and power equipment. Therefore we will introduce Mobile Flash Butt Welder can weld in track.

  • PDF

A Study on Estimation of Fatigue Life of Aged Continuous Welded Rail using the Field Test (현장측정을 통한 노후 레일의 피로수명 평가에 관한 연구)

  • Kong, Sun-Yong;Sung, Deok-Yong;Kim, Jun-Hyung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.352-364
    • /
    • 2007
  • It is essential to reduce track maintenance costs and to extend the periodic replacements of continuous welded rails based on accumulated passing tonnage. As recently train load decrease and rail joints wear down less, the periodic replacements of continuous welded rails can be extended. There are many kinds of rail damage like squat, head-check and corrugation. These can be taken nondestructive or naked eye test. So the periodic replacements of continuous welded rails based on accumulated passing tonnage were examine with focusing on a crack of rail bottom of continuous welded rail. Therefore, this study measure dynamic response of track by metro train load, it compute impact coefficient and track spring coefficient for estimating a condition of actual track system. Also, it is converted the measured stress waveform into stress frequency histogram by the rain-flow counting methods, and then the equivalence of stress is calculated. As apply s-n curve of a new welded rail, accumulated fatigue damage ratio of laid rail and remaining service lives is estimated. This study suggest a plan of the periodic replacements of continuous welded rails based on accumulated passing tonnage classified by the types of track system.

  • PDF

A Study on the Rail Pone of Transition Curve Track to Speed Up of Tilting train (틸팅차량 완화곡선 증속 주행시 궤도작용력 검토)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.529-538
    • /
    • 2009
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured wheel load data in transition curve track, and then evaluated probability the range of wheel load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of wheel load by occured a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation (${\Delta}8{\sim}13kN$). Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation (${\Delta}25{\sim}28kN$) by changed of cant.

  • PDF