• Title/Summary/Keyword: ROAD CONSTRUCTION

Search Result 2,080, Processing Time 0.031 seconds

GREENHOUSE GAS EMISSIONS FROM ONSITE EQUIPMENT USAGE IN ROAD CONSTRUCTION

  • Byungil Kim;Hyounkyu Lee;Hyoungbae Park;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.286-291
    • /
    • 2011
  • Onsite usage of construction equipment accounts for a 6.8% of air pollution in Korea. The high concentration of carbon dioxide in such emissions impact not only climate change, but also people's health. However, greenhouse gas emissions from onsite equipment usage have not yet been fully investigated. This study presents a comparative analysis on how much greenhouse gas is generated by various equipment types used in different construction activities. Two ongoing cases which involve a typical road construction project in Korea were selected for the comparison purpose. Greenhouse gas emissions from each onsite equipment usage of the different activities were estimated on the ground of design documents. The estimates were compared and analyzed to derive the main sources of greenhouse gas emissions. The result showed that earthwork constituted the largest part-more than 90%-among work types. Dump truck, bulldozer, and loader were major sources for such emissions. The study results are expected to be used as a basis for reduction of greenhouse gas emission from onsite equipment usage.

  • PDF

Calculation of Basic Unit of Carbon Emissions in Construction Stage of the Road Infrastructure (도로시설물의 전과정 탄소배출량 산정을 위한 시공단계 탄소배출원단위 구축)

  • Kwak, In-Ho;Kim, Kun-Ho;Cho, Woo-Hyoung;Park, Kwang-Ho;Hwang, Young-Woo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.2
    • /
    • pp.107-112
    • /
    • 2015
  • Carbon emissions in construction stage is very high because lots of construction machines and materials are required to be used at a road construction stage. Many researcher carried out application of carbon emissions estimation methodology during the life cycle of road infrastructure in order to reduce greenhouse gas emissions in the road sector. But the calculation of carbon emissions is difficult because data collection is difficult and calculation procedure is complex. In this study, a basic unit of carbon emissions in construction stage of the road infrastructure was developed in order to get the quantitative determination of carbon that occurs. Carbon emissions of the expressway and common state road was calculated by using the basic unit of carbon emissions and application plan of basic unit of carbon emissions are presented.

A formal representation of data exchange for slope stability analysis of smart road design and construction

  • Dai, Ke;Huang, Wuhao;Wen, Ya;Xie, Yuru;Kim, Jung In
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1130-1137
    • /
    • 2022
  • The Industry Foundation Classes (IFC) provides standardized product models for the building construction domain. However, the current IFC schema has limited representation for infrastructure. Several studies have examined the data schema for road and highway modeling, but not in a sufficiently comprehensive and robust manner to facilitate the overall integrated project delivery of road projects. Several discussions have focused on slope engineering for road projects, but no solution has been provided regarding the formalized parametric modeling up to now. Iterative design, analysis, and modification are observed during the process of slope design for road projects. The practitioners need to carry out the stability analysis to consider different road design alternatives, including horizontal, vertical, and cross-section designs. The procedure is neither formalized nor automated. Thus, there is a need to develop the formal representation of the product and process of slope analysis for road design. The objective of this research is to develop a formal representation (i.e., an IFC extension data schema) for slope analysis. It consists of comprehensive information required for slope analysis in a structured manner. The deliverable of this study contributes to both the formal representation of infrastructure development and, further, the automated process of slope design for road projects.

  • PDF

A Study on Risk Evaluation Method of Ground Subsidence around Sewer (하수관로 주변 도로함몰 위험도 평가 방법에 관한 연구)

  • Kim, Jinyoung;Choi, Changho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.7
    • /
    • pp.13-18
    • /
    • 2018
  • Recently, road subsidence has been increasing in urban areas, threatening the safety of citizens. In the lower part of the road, various road facilities such as water supply and drainage pipelines and telecommunication facilities are buried, and the deterioration of the facilities causes the road subsidence. In particular, in the case of old sewer pipes which are attracting attention as a main cause of road subsidence, the management of sewer pipe replacement, repair and reinforcement is being performed depending on the burial year. Therefore, in this study, we tried to suggest a reliable road subsidence risk assessment method considering various sewer specifications and surrounding environment information and CCTV exploration result and GPR exploration result.

A Comparative Study of Flora and Vegetation Change before and after Forest Road Construction in the Research Site of Minjujisan (임도개설 전·후 식물상 및 식생변화 비교 연구 - 민주지산을 중심으로 -)

  • Han, Seung Woo;Kweon, Hyeong Keun;Lee, Sang Myong;Kim, Hyoun Sook;Lee, Joon Woo
    • Korean Journal of Environment and Ecology
    • /
    • v.32 no.4
    • /
    • pp.392-412
    • /
    • 2018
  • This study was conducted from 2012, which was a year before forest road construction in Minjujisan, to 2015 to verify effects on flora and vegetation change annually before and after the construction, and to provide strategies to examine and manage flora changes. The plant communities in the investigated area around the forest road is separated by the slopes into Quercus mongolica community is on the northwestern slope and Quercus variabilis and Larix kaempferi communities is on the southwestern slope. The annual investigation of flora change before and after the construction showed that there were 209 taxa that had 71 families, 153 genera, 178 species, 27 varieties, and 4 forma in 2015 while there were 66 taxa that had 44 families, 59 genera, 51 species, 13 varieties, and 2 forma in 2012 before the construction, indicating an increase of 143 texa before and after the construction. The investigation of the slope area adjacent to the forest road constructed in 2013, in particular, showed increasing coverage and taxa each year after the construction. This was caused by significantly increased light transmittance after the construction. The investigation in 2015 showed increased coverage of herbaceous layer the year after development of the forest road and the remarkable increase of the coverage of shrub layer in 2015. Further, the coverage on the slope adjacent to the forest road increased more in 2015 than in 2013 and 2014. Therefore, we expect supplementary studies will help to generate a detail manual on flora and vegetation change before and after forest road construction.

Development of Computer Program for the Arrangement of the Forest-road Network to Maximize the Investment Effect on the Forest-road Construction (임도개설(林道開設)에 있어서 투자효과(投資效果)를 최대(最大)로 하는 임도배치(林道配置)프로그램 개발(開發))

  • Park, Sang-Jun;Son, Doo-Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.90 no.4
    • /
    • pp.420-430
    • /
    • 2001
  • The object of this study is to develop a computer program for the arrangement of the forest-road network maximizing the investment effect in forest-road construction with factors such as terrains, forest physiognomy, management plan, logging system, cost of forest-road construction, capacity of inputted labour, capacity of timber production and so on. The operating system developed by this study is Korean Windows 95/98 and Microsoft Visual Basic ver. 5.0. User interface was designed as systematic structure, it is presented as a kind of GUI(graphic user interface). The developed program has result of the most suitable forest-road arrangement, has suitable forest-road density calculated with cost of logging, cost of forest-road construction, diversion ratio of forest-road, cost of walking in forest. And the most suitable forest-road arrangement was designed for forest-road arrangement network which maximized investment effect through minimizing the sum of cost of logging and cost of forest-road construction. Input data were divided into map data and control data. Digital terrain model, division of forest-road layout plan, division of forest function and the existing road network are obtained from map data. on the other hand, cost of logging related terrain division, diversion ratio of forest-road and working road, cost of forest-road construction, cost of walking, cost of labor, walking speed, capacity of inputted labor, capacity of timber production and total distance of forest-road are inputted from control data. And map data was designed to be inputted by mesh method for common matrix. This program can be used to construct a new forest-road or vice forest-road which compensate already existing forest-road for the functional forestry.

  • PDF

Transformation of Urban Spatial Structure around the Old Castle in Cheong-ju City (구 청주읍성 일대 도시공간구조의 변용 양상)

  • Kim, Se Jin;Kim, Tai-Young
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.15 no.1
    • /
    • pp.89-96
    • /
    • 2013
  • This study aims to clarify the transformation of urban spatial structure around old castle in cheong-ju city. The urban spatial structure is composed with road system, block division, and lot system with original cadastral map in 1913 and 2011 GIS. Transformation of road system is classified into control of road line, construction and extension of road. Construction of arterial road was divided into Nam-juro and Mang-sunro with 2 blocks and lot system was destoyed. Transformation of block has not been developed except 4 blocks. The 4 blocks were divided into east-west or north-south direction and became 8 blocks. Transformation of lot system is classified into maintained, subdivided, and destroyed lots in shape and size of lots. Maintained lots were found in large lot in size for public office and park. Subdivided lots were mainly represented with the existing main road, an active alleys, and so on. Destroyed lots by road construction and extension were showed in Nam-juro. Although all these transformations are used to enhance urban spatial structure. The old systems have remained around old castle in cheong-ju city.

Condition assessment model for residential road networks

  • Salman, Alaa;Sodangi, Mahmoud;Omar, Ahmed;Alrifai, Moath
    • Structural Monitoring and Maintenance
    • /
    • v.8 no.4
    • /
    • pp.361-378
    • /
    • 2021
  • While the pavement rating system is being utilized for periodic road condition assessment in the Eastern Region municipality of Saudi Arabia, the condition assessment is costly, time-consuming, and not comprehensive as only few parts of the road are randomly selected for the assessment. Thus, this study is aimed at developing a condition assessment model for a specific sample of a residential road network in Dammam City based on an individual road and a road network. The model was developed using the Analytical Hierarchy Process (AHP) according to the defect types and their levels of severity. The defects were arranged according to four categories: structure, construction, environmental, and miscellaneous, which was adopted from sewer condition coding systems. The developed model was validated by municipality experts and was adjudged to be acceptable and more economical compared to results from the Eastern region municipality (Saudi Arabia) model. The outcome of this paper can assist with the allocation of the government's budget for maintenance and capital programs across all Saudi municipalities through maintaining road infrastructure assets at the required level of services.

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions

A Study on Ecological Evaluation of Habitat Suitability Index using GIS - With a case study of Prionailurus bengalensis in Samjang-Sanchung Road Construction - (GIS를 이용한 서식지적합성지수(HSI)의 생태영향평가 활용방안연구 - 삼장-산청 국도건설공사를 사례에서 삵을 중심으로 -)

  • Lee, Sang-Don;Kwon, Ji-Hye;Kim, Ah-Ram;Jung, Ji-Hyang
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.5
    • /
    • pp.801-811
    • /
    • 2012
  • For biodiversity conservation, Biological Impact Assessment is very important. The focus of the study is to enhance efficient Environment Impact Assessment(EIA) based on collecting existing information of endangered species covering the status survey, estimation of effects and reducing methods. Habitat Suitability Index(HSI) can be applicable to Ecological Impact Assessment and finding various reducing methods based on estimating effects. For this study, the EIA report of Samjang - Sanchung highway construction was chosen as an example and Prionailurus bengalensis euptilura as an endangered species was chosen to assess the ecosystem impact on road construction. Water, road, ground coverage, slope, altitude as variables of habitat were weighted and final HSI map was calculated using Arc map and Arc view. Through comparing of before and after HSI, quantitative estimating on effects was possible to minimize impact of road construction to wildlife habitat.