• Title/Summary/Keyword: RISE program

Search Result 489, Processing Time 0.025 seconds

Comparison of Theoretical Resu Its and Measured Data Using Hemispherical Water Tank Model for Potential Rise of Structure Grounding (구조체 접지의 전위상승에 대한 반구형 수조에 의한 측정값과 계산값의 비교)

  • Gil, Hyoung-Jun;Choi, Chung-Seog;Kim, Hyang-Kon;Han, Woon-Ki;Lee, Bok-Hee
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.111-114
    • /
    • 2005
  • This paper presents a comparison of experimental value by hemispherical grounding simulation system and calculated value by CDEGS program for ground potential rise of structure. When a test current flowed through structure grounding electrodes, ground potential rise was measured and analyzed for types of structure using the hemispherical grounding simulation system in real time, and was computed by means of CDEGS program. The model structures were designed and fabricated with two types on a scale of one-one hundred sixty. When the experimental data were compared with the theoretical values, the similar profile was shown. Therefore, the confidence of measurement was obtained. The distributions of ground surface potential are dependent on the resistivity and absorption percentage in concrete attached to structure.

  • PDF

Analysis of the Impacts of Stack Effect in High-rise Residential Buildings (초고층 주거용 건물에서의 연돌효과 영향 분석)

  • 양인호;조재훈;김광우;여명석
    • Journal of the Korean housing association
    • /
    • v.13 no.4
    • /
    • pp.61-66
    • /
    • 2002
  • The objectives of this study are to clarify the impacts of stack effect in high-rise residential buildings and to present technical methods to reduce stack effect. For the evaluation of stack effect, architectural design guidelines were used and computer program simulations based on network model were performed. The evaluation shows that problems due to stack effect may be reduced by appropriate architectural designs, such as increase in air-tightness of building envelop, and provision of vestibules around entrance and elevator hall doors.

The Program of progress control and quality control for the high-rise compound building (초고층 주상복합건물의 수장공사 공정관리 및 품질관리 방안)

  • Jung, Eul-Kyu;Lim, Chil-Soon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.111-117
    • /
    • 2003
  • Recently SAMWOO EMC received order and built interior walls which was used the day process in several high-rise compound buildings. On the way to build, this process was brought about several matter according to the progress and qualify control. So, this study is the improving way of the dry process from experiences on those constructions

Pass Schedule Design for Improvement of Drawing Speed in the Dry Wire Drawing Process (신선 속도 향상을 위한 건식 신선 공정의 패스스케줄 설계)

  • 김영식;김동환;김병민;김민안;박용민
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.600-603
    • /
    • 2000
  • In the high carbon steel wire drawing process, the wire temperature increases as the drawing speed is faster in order to increase the production rate in the shop floor. The rapid temperature rise causes the wire fracture in the dry wire drawing process. So, in this paper, the isothermal pass schedule program, which includes the calculation method of wire temperature at each pass, is proposed to prevent the wire fracture due to the temperature rise. Using the isothermal pass schedule program, it is newly proposed the pass schedule design system that prevents the cup-cone defects, improves the elongation of the final products and assures further deformation. As a result, the temperature rise of the wire was decreased and the production rate of the final product is remarkably grown up according to the increase of the final drawing speed than that of the conventional process. Also, the proposed pass schedule design system could give a useful information to the process designer who would design the high carbon steel wire drawing process.

  • PDF

Web-Based Cost Planning Program for High-Rise Office Building (고층 사무소건축의 공사비계획을 위한 웹 기반 개산견적 프로그램)

  • Kim Ki-Hong;Park Chan-Sik;Chang Sun-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.69-79
    • /
    • 2005
  • The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.

Physical Properties of the Factors Affecting the Evaporation Process of Fruit Juices (과일쥬스의 농축공정에 영향을 미치는 인자의 물리적 특성)

  • Eun, Duc-Woo;Choi, Yong-Hee
    • Korean Journal of Food Science and Technology
    • /
    • v.23 no.5
    • /
    • pp.605-609
    • /
    • 1991
  • The physical properties which must be considered as engineering factors affecting on the evaporation process of fruit juices are boiling point rise, density, viscosity, thermal conductivity and specific heat. These factors are varied with food ingredients, soluble solids, pressure and temperature. In the reserch, it has been worked to obtain the data and to develop prediction model for the boiling point rise as a faction of soluble solid and pressure by the regression of SPSS package program. For the prediction model of density, it was developed as a fuction of soluble solid content on apple and pear juices. For the viscosity model, it was establised by the factors of temperature and content of soluble solid through the optimization program.

  • PDF

Low-energy Tall Buildings? Room for Improvement as Demonstrated by New York City Energy Benchmarking Data

  • Leung, Luke;Ray, Stephen D.
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.4
    • /
    • pp.285-291
    • /
    • 2013
  • This paper proposes a framework for understanding the energy consumption differences between tall and low-rise buildings. Energy usage data from 706 office buildings in New York illustrates expected correlations from the framework. Notable correlations include: taller buildings tend to use more energy until a plateau at 30~39 floors; tall buildings in Manhattan use 20% more energy than low-rise buildings in Manhattan, while tall buildings outside Manhattan use 4% more energy than low-rise buildings outside Manhattan. Additional correlations are discussed, among which is the trend that the Energy Star program in New York City assigns higher ratings to tall buildings with higher EUIs than low-rise buildings with the same EUI. Since Energy Star is based on regressions of existing buildings, the Energy Star ratings suggest taller buildings have higher EUIs than shorter buildings, which is confirmed by the New York City energy benchmarking data.

Comparison of Measured Data and Theoretical Results for Potential Rise of Structure Using Electrolytic Tank Model (수조모델을 이용한 구조체의 전위상승에 대한 측정값과 계산값의 비교)

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Choi, Chung-Seog;Lee, Bok-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.5
    • /
    • pp.72-77
    • /
    • 2006
  • This paper presents a comparison of experimental value by electrolytic tank experimental apparatus and calculated value by CDEGS program for potential rise of structure. When a test current flowed through structure models, potential rise was measured and analyzed for types of structure using the electrolytic tank experimental apparatus in real time, and was computed by means of CDEGS program. The structure models were designed and fabricated with four types on a scale of one-one hundred sixty. When the experimental data were compared with the theoretical values, the similar profile was shown. Therefore, the confidence of measurement was obtained. Potential rise was the lowest value at electric cage type(structure model B). The distributions of potential rise are dependent on the resistivity and absorption percentage in concrete attached to structure.

A comparative study on the numerical analysis program by SSI analysis of a high-rise building and an adjacent underground structure (초고층 건물과 인접지하구조물의 SSI 해석을 통한 수치해석 프로그램 비교 연구)

  • You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.2
    • /
    • pp.211-225
    • /
    • 2019
  • Recently, earthquakes have occurred throughout the entire region of Korea and seismic analysis studies have been actively conducted in various fields. SSI analyses studies considering ground have been carried out consistently. However, few comparative analyses have been performed on the dynamic behavior of buildings according to numerical analysis method in the case of the previous dynamic analyses considering grounds. Therefore, in this study, the dynamic analyses were performed on a high-rise building by using both a finite element program MIDAS GTS NX and a finite difference program FLAC 2D. The results were compared and analyzed each other. As a result, both the maximum compressive and tensile bending stresses of above ground and below ground part were estimated to be a little larger by MIDAS GTS NX than by FLAC 2D. However, the maximum horizontal displacement value, the horizontal displacement distribution, and the position of weak part were turned out to be similar in both analysis programs. Therefore, it can be concluded that there is no difference in using either a finite element program or a finite difference program for the convenience of a user for a dynamic analysis.

In-office dental bleaching with violet light emitting diode: bleaching efficacy and pulpal temperature rise

  • Brunna Katyuscia de Almeida Guanaes;Talyta Neves Duarte;Gisele Maria Correr;Marina da Rosa Kaizer;Carla Castiglia Gonzaga
    • Restorative Dentistry and Endodontics
    • /
    • v.47 no.1
    • /
    • pp.7.1-7.14
    • /
    • 2022
  • Objectives: This study evaluated the bleaching efficacy of different in-office protocols associated with violet light emitting diode (V-LED), and measured the pulpal temperature rise caused by V-LED with or without gel application. Materials and Methods: Bovine incisors were distributed in 4 groups (n = 10): VL - V-LED; HP - 35% hydrogen peroxide (control); HYB - hybrid protocol, V-LED applied without gel for 10 irradiation cycles followed by V-LED applied with gel for another 10 irradiation cycles; and HPVL - gel and V-LED applied for 20 irradiation cycles. Three bleaching sessions were performed with 7-day intervals. Bleaching efficacy was evaluated with ΔEab*, ΔE00 and ΔWID. Data were recorded at baseline, 7, 14, 21 and 70 days. For pulpal temperature rise, thermocouples were placed inside the pulp chamber of human incisors. To determine intrapulpal temperature, the teeth were irradiated with V-LED with or without application of bleaching gel. Color difference data were analyzed by 2-way repeated measures ANOVA and Tukey's test. Pulpal temperature was analyzed by t-test (α = 5%). Results: VL exhibited lower color (ΔEab* and ΔE00) and whiteness changes (ΔWID) than the other groups. HPVL presented higher color change values than HYB. HYB and HPVL showed not different ΔWID values; and HP showed the highest whiteness changes at all times. There were significant differences comparing ΔT with gel (8.9℃) and without gel application (7.2℃). Conclusions: HPLV was more efficient than HYB. The 2 protocols with VL showed similar results to control. Gel application combined with VL promoted higher pulpal temperature than to the no gel group.