• Title/Summary/Keyword: R&D Project Management

Search Result 419, Processing Time 0.035 seconds

A Study on the Development of Evaluation Index for the Improvement and Operation of R&D Project Management Process (R&D 프로젝트 관리 프로세스 개선 및 운영을 위한 평가지표 개발 연구)

  • Lee, Seol-Bin
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.308-319
    • /
    • 2018
  • This study is intended to develop evaluation indicators for the improvement and operation of R&D project management process. To achieve this, an empirical survey was carried out to small companies specializing in technology-centered R&D. First, 12 evaluation indicators showed that there was a deviation of more than 2 times from the highest score of 60.77 to the lowest score of 30 in integrated management, which the R&D project management process needs to be selectively used for the improvement and operation. Second, the difference in industry showed that the biotech industry was the highest, while the chemical, electrical and electronic industries were the lowest. Third, the difference in the number of employees showed that companies with 50~100 employees were relatively high, while small companies with more than 100 employees were somewhat low. Fourth, the difference in career showed that 5~7-year career was relatively high, while 7~10-year career was somewhat high. Overall, evaluation indicators for the improvement and operation of R&D project management processor showed that integrated management was the most important, followed by communication management, risk management, and time management. This implies that small companies specializing in technology-centered R&D need to concentrate on the importance of efficient integrated management and rapid decision-making and risk management among individual participation subjects.

Development of R&D Performance Management System in Disaster and Safety based on the PMS (프로젝트 관리체계 기반 재난안전 R&D 성과관리 체계 구축)

  • Jang, Kwang-Jin;Song, Young-Karb
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.153-163
    • /
    • 2018
  • There is insufficient effective management systems to achieve project goalsin disaster and safety R&D. Therefore, to develop an R&D performance management system, this paper develops a R&D performance management matrix based on PMBOK to systematize a process and to enhance efficiency of performance management. Also, this paper identified vulnerable procedures in disaster management by analyzing related laws, work process and performance. Analysis results found that the performance management matrix in disaster management R&D consists of 5 process groups, 7 knowledge areas and 47 processes. Also, the performance of the diffusion knowledge process was evaluated as weak in the present management system. This study defined ITO and developed a data flow diagram for applicationto related work. The suggestions of this study include the related work to enhance R&D performance, contribute to improving diffusion of R&D performance, and enhance the utilization of developed technologies.

Dongeui Visual-PERT/CPM for R&D Project Management (연구개발 프로젝트관리를 위한 시각화모델)

  • 황흥석
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.268-271
    • /
    • 2000
  • In these days, the technical advances and complexities have generated much of the difficulties in managing the project resources, both time and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgements concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a two-step approaches :in the step 1, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning, In the second step, we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. Computer implementation of this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of visual graphical. Also developed GUI-type program, Dongeui Visual-PERT/CPM. The results of this research will provide the project managers with an efficient management tool.

  • PDF

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

A Systems Engineering Case Study to Improve Defence R&D Program Effectiveness (국방 R&D사업 시스템엔지니어링 적용사례 및 발전방안 연구 - 저고도레이더 업체주관 연구개발사업 사례 중심으로 -)

  • Park, Kyeong-Il;Pyun, Wan-Joo;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.35-43
    • /
    • 2008
  • Application of system engineering should be realized on necessary condition being to propel National Defense R&D Program. But, these necessity is yet not realized easily to many project managers of Defense Acquisition Program Administration(DAPA). As one person of DAPA project manager, system engineering hard to approaches easily by the word itself. There are a lot of difficult sections where should apply how. This paper established DAPA Project Manager and Acquisition Point of Contact of demand Military by main customer (reader), and wished to make understood more easily and approach system engineering application to these. Also, this paper studied project management example that scientific project management techniques of Earned Value Management(EVM) and Cost As an Independent Variable(CAIV) etc. is taken abuzz in DAPA inside by Project management technique that become reform, arc Integrated in system engineering.

  • PDF

Developing a Real-time Cashflow Management System for National R&D Management (국가 연구 개발 프로젝트 실시간 자금 관리 시스템 개발에 관한 연구)

  • Han, Seung-Youp;Lee, Hyejung;Lee, Jungwoo
    • Journal of Information Technology Services
    • /
    • v.13 no.3
    • /
    • pp.343-357
    • /
    • 2014
  • As science and technology infiltrates every aspects of modern society in terms of economic and social growth and development, funding for research and development (R&D) is growing rapidly. Republic of Korea is not an exception in this trend and the R&D funding in Korea has been grown about 10% every year, recently. However, as the scope and size of funding grows exponentially, need for monitoring and managing these R&D projects becoming more and more imminent. Though different types of project management systems were developed by a variety of agencies and departments and used in monitoring and managing, these systems were developed as standalone silo type systems. These systems are not connected to each other while the same researchers may involved in different projects across agencies and department. Also, these management systems are not linked to the banking systems in which real transactions of funding occurs, such as cost reimbursement and financial audit of each R&D accounts. Historically, a few fraud and malappropriation cases were found and indicted. However, as the number of these incidents grows along with the growth of R&D funding, a large scale integration/linking of project management systems and banking systems. Realizing the importance of systems integration among agencies as well as with the banking systems, situational requirements analyses were conducted concerning the current state of R&D management system. As a results, a Real-time Case Management System (RCMS) was proposed as a solution to current problems. In this paper, the collected systems requirements were documents with analyses of the situation, the architecture of the integrated systems with more user-friendly technological alternatives. This large scale linkage requires interface standardization as well as modularization of interfaces. Proposed systems architecture is introduced here with technical details of Jex Framework used,, followed by resulting technical and economic performance of the Realtime Cashflow Management System (RCMS).

The Single Effect Evaluation System for Analyzing the Effectiveness of R&D Project (R&D프로젝트의 효과분석을 위한 단독효과평가체계)

  • Gwon Cheol Sin;Park Jun Ho;Gang Il Jung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.966-971
    • /
    • 2003
  • [ $\lceil\;Cost Effectiveness Analysis\;\rfloor$ ] has been widely used to evaluate effectiveness of R&D resources. But, almost of cost effectiveness evaluation systems have some problems, especially estimating method of effect on R&D project is very rough and imprecise. To solve this problem, we have designed new single effect evaluation system, which are able to apply the distribution of order statistics and to transform relative measure into absolute measure for getting single effect.

  • PDF

A Process of the Risk Management for a Space Launch Vehicle R&D Project (우주발사체 개발사업의 위험관리 프로세스)

  • Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.2
    • /
    • pp.19-27
    • /
    • 2016
  • Many countries concentrated on the space developments to enhance the national security and the people's quality of life. A space launch vehicle for accessing the space is a typical large complex system that is composed of the high-technology like high-performance, high-reliability, superhigh-pressure, etc. The project developing large complex system like space launcher is mostly conducted in the uncertain environment. To achieve a goal of the project, its success probability should be enhanced consistently by reducing its uncertainty during the life cycle: it's possible to reduce the project's uncertainty by performing the risk management (RM) that is a method for identifying and tracing potential risk factors in order to eliminate the risks of the project. In this paper, we introduce the risk management (RM) process applied for a Space Launch Vehicle R&D Project.

An Analysis of Region Industry Total Information System (지역산업종합정보망 구축현황 분석)

  • Oh, Han-Seok
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.22 no.1
    • /
    • pp.231-246
    • /
    • 2011
  • National R&D project management agencies have promoted continuous investment and development to provide efficient information such as collection and analysis of industry and technology information and research trend information, and development of user oriented information system. This research analyzes Region Industry Total Information System status to manage regional R&D and suggests methods for regional industry project management. This paper may contribute to the advancement of efficient information management system though research method.

Quality Management Model for Process Performance Level and Development Technology (프로세스 이행 수준과 개발 기술 품질 관리 모델)

  • Park, J.H.;Park, Y.S.;Jung, H.T.;Kim, S.H.
    • Electronics and Telecommunications Trends
    • /
    • v.32 no.6
    • /
    • pp.105-115
    • /
    • 2017
  • This paper describes a project - based quality management model that identifies development technologies and codes while at the same time verifying the ability to implement processes that are essential in R & D projects. In order to verify the process implemented in the R & D project implementation, there are review, checking points, and evaluating methods the process performance levels for five processes such as defining requirements which is the beginning stage of system development, testing process which is the completion stage of system development, and project management and peer review process for project management and support in the proposed project-based quality management model. For development technology and code validation, the model included the documented test cases for each requirement by the developer in the requirements definition stage, debugging and testing in the design and implementation stages, static analysis and open source licence verification procedure, and system environment. After applying the model in SW development R&D project for evaluating the process performance, and verifying the development technology and the code, the developers responded that the improvement in the development technique and the code, and upgrade of process performance level for project are more than 10%.