• 제목/요약/키워드: Quantity take-off

검색결과 90건 처리시간 0.031초

실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구 (A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase)

  • 박승화;김흥수;윤두영
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.

공법 기반 견적 시스템 개발 전략 (A Development Strategy for Construction method based Estimation System)

  • 김성아;강명구;윤수원;박영진;진상윤;최철호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.341-345
    • /
    • 2007
  • The objective of this paper is to introduce a project on developing construction method based estimation system. It means a 3D product model based estimation system to effectively and efficiently manage estimation process during the project life-cycle. This paper describes a outline and method for 3D based estimation system. Normally, it is not easy to take-off the quantity from 3D CAD model, because of all different depths of the quantity take off in each design development stage and nation. This study shows how to keep the balance of its depths in each design development stage such as schematic design, detail design, shop drawing, and so forth.

  • PDF

3D Laser Scanning을 활용한 화재 손상 부위의 보수·보강 물량 산출 방식 개선에 관한 연구 (A Study on the Improvement of Repair and Reinforcement Quantity Take-off in Fire-damaged Area Using 3D Laser Scanning)

  • 정희재;함남혁;이병도;박광민;김재준
    • 한국BIM학회 논문집
    • /
    • 제9권1호
    • /
    • pp.11-21
    • /
    • 2019
  • Recently, there is an increase in fire incidents in building structures. Due to this, the importance of fire-damaged buildings' safety diagnosis and evaluation after fire is growing. However, the existing fire-damaged safety diagnosis and evaluation methods are personnel-oriented, so the diagnostic results are intervened by investigators' subjectivity and unquantified. Thus, improper repair and reinforcement can result in secondary damage accidents and economic losses. In order to overcome these limitations, this study proposes using 3D laser scanning technology. The case analysis of fire-damaged building structures was conducted to verify the effectiveness of accuracy and manpowering by comparing the existing method and the proposed method. The proposed method using 3D laser scanning technology to obtain point cloud data of fire-damaged field. The point cloud data and BIM model is combined to inspect the fire-damaged area and depth. From inspection, quantified repair and reinforcement quantity take-off can be acquired. Also, the proposed method saves half of the manpowering within same time period compared to the existing method. Therefore, it seems that using 3D laser scanning technology in fire-damaged safety diagnosis and evaluation will improve in accuracy and saving time and manpowering.

객체 기반 물량 산출을 위한 흙막이 BIM 설계 시스템 구축 (Development of Quantity Take-off Building Information Modeling System for Retaining Wall)

  • 강승우;김은석;이시은;김치경
    • 한국전산구조공학회논문집
    • /
    • 제35권4호
    • /
    • pp.197-205
    • /
    • 2022
  • 본 논문에서는 BIM을 활용한 흙막이 시스템을 개발하고 소개한다. 선행 연구 분석을 통해서 흙막이 BIM 시스템을 이루는 기술들에 대한 조사를 바탕으로 요소 기술들을 개발하였다. 첫 번째 요소 기술로, 선행 연구 및 표준 등을 활용해 BIM라이브러리를 구축하여 범용성과 재사용성을 확보하였다. 두 번째로, 토공 2D 기반의 토공 물량 산출법들을 분석하고 흙막이 BIM 시스템으로 활용하되 추가로 IDW 보간법을 활용하여 지형 생성 및 토공량 산출 시스템을 구축하였다. 세 번째로, 물량 산출을 위한 4가지 수식을 제안하여 객체 마다 각각 다르게 물량 산출법을 적용하여 개발하였다. 이후, 시스템에서 산출되는 물량산출서와 2D 기반 물량산출서와의 비교와 검증을 통해서 시스템이 앞으로 나아가야할 방향과 한계에 대해 알아보았다.

파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링 (3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique)

  • 와카스 아샤드 타놀리;하스나인 라자;이승수;박상일;서종원
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

3D기반 비정형 토목구조물 물량산출 알고리즘 개발 (Development of Quantity Take-off Algorithm for Irregularly Shaped Structures using 3D Object)

  • 하철석;문소영;문현석;강인석
    • 대한토목학회논문집
    • /
    • 제34권2호
    • /
    • pp.655-666
    • /
    • 2014
  • 최근 건설공사에 디자인적 요소가 많이 강조 되면서 비정형 구조물이 증가하고 있다. 이에 따라 여러 소프트웨어들이 BIM환경에서 3D객체의 물량산출기능을 제공하고 있지만, 솔리드 모델기반 정형화된 객체의 제한된 물량산출기능을 제공하고 있다. 비정형 토목 구조물과 같이 수직적 단면형상의 변화정도가 심한 3D객체는 다수의 곡면 표현을 포함하므로 솔리드로 모델링하는데 많은 노력이 필요하며, 해당 모델이 포함한 기하정보의 수가 방대하기 때문에 특정한 단면에 대한 기하정보를 추출하기가 용이치 않다. 이러한 이유로 비정형 구조물을 솔리드 모델의 3D객체로 표현하는 데에는 한계가 따른다. 반면 서피스 모델은 비정형 객체의 형상을 비교적 자유로이 표현할 수 있고, 점, 선, 면으로만 이루어진 모델이기 때문에 정보의 용량이 적다. 따라서 대부분이 복잡한 형태로 방대한 양의 설계작업을 필요로 하는 토목공사의 설계정보 용량을 고려한다면, 서피스 모델링은 토목구조물 설계와 물량산출에 유리한 모델링 방법이 될 수 있다. 본 연구는 건설공사 비정형 구조물의 설계 작업에 유리한 서피스 모델기반의 3D객체를 이용한 비정형 객체의 물량산출 알고리즘을 제시하는 데 목적이 있다. 제시된 방법론은 사례적용을 통하여 수계산 및 기존 솔리드방식의 물량산출결과와 비교하여 정확성을 검증하고 있다.

사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발 (A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis)

  • 김성아;이재준;신태홍;진상윤;김예상;최철호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.297-300
    • /
    • 2008
  • 1990년대 3D CAD가 출현한 이후, 최근 BIM(Building Information Modeling)이 이슈화되고 있다. BIM이라 함은 건설 프로젝트 생애주기 전반에 걸쳐 생성되는 정보를 3D Model과 함께 관리하는 것으로, 건설 프로젝트 각 분야의 정보들을 3D 모델과 연동하는 프로세스를 가지고 있다. 이에 견적 분야에서도 3D 모델로부터 자재의 물량을 산출하는 연구들이 진행되어 오고 있으며, 국내l에서 상용화된 견적 프로그램을 국내 건설 프로젝트에 적용하려는 시도가 이루어지고 있다. 그러나 이는 2D 도면으로부터 물량을 산출하는 기존의 견적방식보다 작업시간 및 생산성 측면에서 효율성이 떨어질 뿐만 아니라, 국외 견적 업무는 국내 견적과 다른 방식으로 이루어지고 있기 때문에 국외 상용 프로그램을 국내 건설 프로젝트에 적용하는데 한계가 있다. 그러므로 국내 건설 프로젝트에서 3D 기반 견적 프로그램을 활용하지 못하고 있다. 본 연구에서는 국내 실정에 적합한 3D 기반 견적 프로그램 개발을 위해 우선적으로 고려되어야 할 3D CAD로부터 물량 정보를 견적 프로그램으로 전달하는 3D CAD와 물량산출 연동 프로그램을 제안하고자 한다.

  • PDF

슬래브 철근 물량 산출 자동화 알고리즘 개발 (Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar)

  • 김수환;김선국;서상욱;김상철
    • 한국건설관리학회논문집
    • /
    • 제24권5호
    • /
    • pp.52-62
    • /
    • 2023
  • 본 연구의 목적은 정착 길이, 표준 후크 및 이음 길이와 같은 관련 규정을 준수하면서 슬래브 철근의 정확한 절단 길이를 산출하는 자동화된 알고리즘을 제안하는 것이다. 제안된 알고리즘은 일반적으로 외주를 통해 수작업으로 진행하던 기존 철근 물량 산출 프로세스를 개선하는 것을 목표로 한다. 입찰 단계부터 정확한 철근 수량 데이터를 BBS(Bar Bending Schedule) 수준으로 제공함으로써 물량 산출의 불확실성을 제거하고 외부 의존도를 낮출 수 있다. 또한, 알고리즘을 통해 정확한 물량을 조기에 산출하는 경우 건설사는 경쟁력 있고 최적화된 입찰을 미리 준비할 수 있어 계약 협상 시 이익률을 높일 수 있다. 제안된 알고리즘은 견적, 예산, BBS 생성 등 다양한 프로세스에서 중복되는 업무를 간소화할 뿐만 아니라 계약 후 구조 도면 변경에도 유연하게 대처할 수 있다. 특히, 제안된 알고리즘을 BIM과 결합하는 경우 시공 초기 단계에서 BIM을 적용할 때 발생하는 기술적 문제를 해결할 수 있으며, REVIT 기반 패밀리 파일로 구축된 알고리즘의 수식과 형상 코드는 실무에서 상당한 시간과 인력 절감에 기여한다.

합성 PC 부재의 철골 물량산출 알고리즘 기초연구 (Basic study of algorithm for steel quantity analysis of composite precast concrete members)

  • 김경주;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.96-97
    • /
    • 2014
  • Green Frame is a column-beam structure built by steel frame joints embedded in the columns and beams. Here, the steel frame embedded in the columns and beams is not a standardized product, instead it needs to be order-produced. The quantity for each steel frame size should be calculated to estimate the quantity of steel frames to be manufactured. However, it is highly time-consuming and requires a lot of effort in calculating the quantity of steel frames, for there are a wide range of steel frame types that are embedded in the columns and beams. To solve this problem, the study proposes an algorithm for calculation of the amount of steel frames with ease and promptness. When a program is developed using the algorithm proposed in the study in connection to the information on precast concrete members prepared in the design phase, it is anticipated that the manpower required as well as the manufacturing time will be decreased.

  • PDF

3D Earthwork BIM Design Process for a Road Project

  • Raza, Hassnain;Park, Sang-Il;Lee, Seung Soo;Tanoli, Waqas Arshad;Seo, Jongwon
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.8-15
    • /
    • 2017
  • Building Information modeling is playing an important role in transforming the construction industry. It helped the industry with better visualization, minimum design errors, and excellent planning of the construction activities. Time and cost saving can be effectively achieved by using BIM for any construction project. It improves information exchange between all the project stakeholders. However, the development of earthwork 3D BIM is still underway and has not been fully implemented yet. This paper presents the study of a complete process for Earthwork BIM design using Autodesk Civil 3D. A real site road construction project is used as a case study to explain the process of earthwork modeling, starting from laser scanning to 3D model. Quantity take off calculation is very important part of any road construction project so during this study earthwork volume from two 3D earthwork model is calculated. The results obtained through this study will be the basis for future work which has been concluded in this paper.