• Title/Summary/Keyword: Quantitative Assessment

Search Result 1,872, Processing Time 0.032 seconds

Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants (화력발전설비 위험도 평가를 통한 기기별 정비주기 예측)

  • Song, Gee Wook;Kim, Bum Shin;Choi, Woo Song;Park, Myung Soo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.10
    • /
    • pp.1291-1296
    • /
    • 2013
  • Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (POF) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RBI is to identify important failure modes and causes in the equipment. Once these are defined, the POF and COF can be assessed for each failure. During POF and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the POF is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided.

A Study on Transportation Route of Chemicals using Quantitative Risk Assessment (정량적 위험성평가를 이용한 화학물질 운송경로에 관한 연구)

  • Byun, Yoon Sup
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.3
    • /
    • pp.46-52
    • /
    • 2017
  • During the transportation of chemicals, quantitative risk assessment for chemical leakage accidents caused by traffic accidents was carried out and the appropriateness of chemical transportation route was evaluated. The quantitative risk assessment method applied to the chemical leakage accidents that may occur in the chemical handling equipments installed in the workplace was presented and applied to the chemical transportation. By analyzing the number of traffic accidents in transportation vehicles, the probability of chemical leakage accidents during chemical transportation was predicted and applied to the quantitative risk assessment of chlorine gas leakage accidents that may occur when transporting liquified chlorine bombe using vehicles. As a result, the most appropriate route of transporting the liquefied chlorine bombe was suggested on the basis of risk.

Application of Quantitative Assessment of Coronary Atherosclerosis by Coronary Computed Tomographic Angiography

  • Su Nam Lee;Andrew Lin;Damini Dey;Daniel S. Berman;Donghee Han
    • Korean Journal of Radiology
    • /
    • v.25 no.6
    • /
    • pp.518-539
    • /
    • 2024
  • Coronary computed tomography angiography (CCTA) has emerged as a pivotal tool for diagnosing and risk-stratifying patients with suspected coronary artery disease (CAD). Recent advancements in image analysis and artificial intelligence (AI) techniques have enabled the comprehensive quantitative analysis of coronary atherosclerosis. Fully quantitative assessments of coronary stenosis and lumen attenuation have improved the accuracy of assessing stenosis severity and predicting hemodynamically significant lesions. In addition to stenosis evaluation, quantitative plaque analysis plays a crucial role in predicting and monitoring CAD progression. Studies have demonstrated that the quantitative assessment of plaque subtypes based on CT attenuation provides a nuanced understanding of plaque characteristics and their association with cardiovascular events. Quantitative analysis of serial CCTA scans offers a unique perspective on the impact of medical therapies on plaque modification. However, challenges such as time-intensive analyses and variability in software platforms still need to be addressed for broader clinical implementation. The paradigm of CCTA has shifted towards comprehensive quantitative plaque analysis facilitated by technological advancements. As these methods continue to evolve, their integration into routine clinical practice has the potential to enhance risk assessment and guide individualized patient management. This article reviews the evolving landscape of quantitative plaque analysis in CCTA and explores its applications and limitations.

Risk Assessment for Performance Evaluation System of Hydrogen Refueling Station (수소충전소 성능평가 장비 안전성 평가 연구)

  • KANG, SEUNGKYU;LEE, DONGHOON
    • Journal of Hydrogen and New Energy
    • /
    • v.33 no.3
    • /
    • pp.232-239
    • /
    • 2022
  • This study performed qualitative and quantitative risk assessment of equipment for evaluating the protocol of hydrogen refueling stations and suggested measures to improve safety. Hazard and operability study was performed for qualitative risk assessment, and Hy-KoRAM was used for quantitative risk assessment. Through a qualitative risk assessment, additional ventilation devices were installed, simultaneous venting of the storage container was prohibited, and the number of repeated refilling of the evaluation equipment was identified to manage the number of fillings of the container. Through quantitative risk assessment, the area around the device was set as a restricted area when evaluating the station, and measures were suggested to reduce the frequency of accidents.

Health Risk Assessment on Environmental Pollutants (환경오염물질의 건강위해성 평가)

  • 신동천
    • Journal of environmental and Sanitary engineering
    • /
    • v.8 no.2
    • /
    • pp.11-24
    • /
    • 1993
  • Methodology for health risk assessment has been developed by governmental agencies and research institutions in the United States concerning environmental and industrial health such as Environmental Protection Agency, Pood and Drug Administration, and Occupational Safety and Health Administration. The basic concept, process, and scientific rational of the health risk assessment are discussed in order to introduce this field of research for future application to risk assessment and management in Korea. As environmental criteria for most of the environmental carcinogens and nonfarcinogens are set based on the quantitative risk assessment, this quantitative methodology should be emphasized and studied in Korean situation.

  • PDF

Quantitative Safety Assessment for Hydrogen Station (수소 충전소에 대한 정량적 안전성 평가)

  • Seong, D.H.;Rhie, K.W.;Kim, T.H.;Oh, D.S.;Oh, Y.D.;Seo, D.H.;Kim, Y.G.;Kim, E.J.
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.3
    • /
    • pp.111-116
    • /
    • 2012
  • This study is about the quantitative safety assessment of hydrogen station in Korea operating with on-site type. This was written by background information that before qualitative safety assessment to write. For the qualitative safety assessment method, the study used FMEA(failure mode & effect analysis) and HAZOP(hazard & operability), and adopted the FTA(fault tree analysis) as the quantitative safety assessment method. To write the FTA, we wrote FT by Top event that hydrogen leakage can be called most serious accident of hydrogen station. Each base event collect reliability data by reliability data handbook, THERP-HRA and estimation of the engineering. Assessment looked at the high frequency and the possible risk through Gate, Importance, m.cutsets analysis.

Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system - (도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 -)

  • Yoo, Ji-Oh;Shin, Hyun-Jun;Kim, Jong-Won
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.

  • PDF

Analysis of Marine Vessel Collision Risk based on Quantitative Risk Assessment

  • Koo, Bon Guk
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.3
    • /
    • pp.319-324
    • /
    • 2018
  • The collision problem is one of the design factors that must be carefully considered for the risk of collision occurring during the operation of ships and offshore structures. This paper presents the main results of the ship collision study, and its main goal is to analyze potential crash scenarios that may occur in the FLNG (Floating Liquefied Natural Gas) considering the likelihood and outcome. Consideration being given to vessels visiting the FLNG and surrounding vessels navigating around, such as functionally supported vessels and offloading carriers. The scope includes vessels visiting the FLNG facility such as in-field support vessels and off-loading carriers, as well as third party passing vessels. In this study, based on QRA (quantitative risk assessment), basic research methods and information on collision are provided. Based on the assumptions and methodologies documented in this study, it has been possible to clarify the frequency of collision and the damage category according to the type of visiting ship. Based on these results, the risk assessment results related to the collision have been derived.

The Quantitative Risk Assessment for Railroad-tunnel Fire Incidents by using CFD code (CFD code를 이용한 철도터널 화재 위험도 평가)

  • Kim, H.B.;Lee, D.H.;Jang, Y.J.;Jung, W.S.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.169-172
    • /
    • 2011
  • Recently, railroad long tunnels are increasing and growing longer due to topological feathers like a lot of mountain in Korea. But fire disaster of a long tunnel cause many people to injury and death. For that reason, at the early design stage of a long tunnel, risk assessment and mitigation measure of risk for satisfying tunnel safety are required. According to the railroad facility safety standard (Korean MLTM Announcement No. 2006-395), risk assessment for railroad-tunnel fire should be performed when design stage. Therefore, various methods of risk assessment for tunnel fire have been studied and applied. In the paper, QRA(Quantitative Risk Analysis) for fire risk assessment by using CFD code is presented and the usefulness of CFD is discussed.

  • PDF

A Study of Qualitative and Quantitative Risk Assessment for Highway Safety Facilities (고속도로 교통안전시설물의 정성적 및 정량적 위험도분석 연구)

  • Ji, Dong-Han;O, Yeong-Tae;Choi, Hyun-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.99-109
    • /
    • 2007
  • Risk elements of highway safety facilities are affected by complex environments. Thus, risk-based approach for traffic safety facilities is needed. For this, in this study, qualitative and quantitative risk assessment methodology and procedure for highway safety facilities is proposed, which can be used as risk-based approach incorporating VE process. Also, for the quantitative risk assessment, event tree using EPDO(Equivalent Property Damage Only) with respect to frequency and magnitude of risk events is introduced. As a result, risk index of alternative 1(140cm) and 2(127(cm) which can be used as performance factor in VE approach are estimated.