• Title/Summary/Keyword: Quality cost system

Search Result 1,979, Processing Time 0.04 seconds

Optimization of Quality Cost using Multiobjective Decision Making Method (다목적의사결정 기법을 이용한 품질비용의 최적화에 관한 연구)

  • 송종대
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.16 no.28
    • /
    • pp.21-29
    • /
    • 1993
  • We want to know the interrelationship among the four components of Total Quality Cost. So that we will be able to say what changes will occur in one when another is changed Even though the relationship among the component Cost is as varied as there are companies keeping such cost systems, existence of some general pattern is hypothesized at least among similar companies doing similar business or producing similar products. The purpose of this study is to drive Optimum Quality Cost on base of the result of the quality cost analyses in N business, after multiple regression model with failure cost as dependent variable is established. Vector Optimization (VOP) method were used for solving multiobjective decision ploblem.

  • PDF

A Study on the Development of Industrial Power Management System (수용가 전력관리시스템 개발 연구)

  • Moon, Young-Hwan;Seong, Ki-Chul;Yoon, Sang-Hyun;Kim, Eon-Chung
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.550-552
    • /
    • 1995
  • Real time informations from industrial power system in operation can be used for efficient energy conservation, optimal operation of electrical equipments, and expansion planning of apparatus. Requirements for energy conservation and supplied power quality in customers are increasing significantly because of their effects on the production cost and efficiency. Thus, the development of low cost power management system which can can operate in domestic power system properly is substantially requested. In this research, operation software for real time monitoring and control system in customer power system has been developed to achieve the above purposes. The development of the operating software and related technologies are expected to be applied successfully for reducing electricity cost, enhancing power quality, determining facility expansion planning, operating optimal power system, increasing production efficiency, and reducing maintenance cost.

  • PDF

A Study on the Decision For the Process Improvement Alternatives to Reduce the Fraction Defective (불량률(不良率) 감소(減少)를 위한 공정개선대안(工程改善對案) 결정(決定)에 관한 연구(硏究))

  • Lee, Do-Gyeong;Jo, Jin-Hyeong
    • Journal of Korean Society for Quality Management
    • /
    • v.17 no.2
    • /
    • pp.47-54
    • /
    • 1989
  • This study is concerned with the reduction of fraction defective for quality improvement model in manufacturing system. For the methodology, a heuristic method for the selection of alternatives of process improvement is introduced for quality improvement and cost problem subject to cost constraints. This study suggests a model for selecting fraction defective reduction alternatives in multi-stage manufacturing system and a numerical example is presented.

  • PDF

Customer Nodal Cost Calculation using Voltage Sag Coordination Charts (전압 강하 협조 그래프(VSCC)를 이용한 수용가 모선 가격 계산)

  • Jeong, Sung-Won;Lee, Hyun-Chul;Lee, Geun-Joon;Gim, Jae-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.298-299
    • /
    • 2008
  • In this paper, supposed that can measure power quality of bus and can calculate this cost in case electric charges about customer are imposed by each bus. When reflected this in system planning, expected cost proposed following method through sample system. We calculated the nodal cost by OPF(optimal power flow) in system and the drop numbers that happen during year of loads utilizing VSCC. Also calculated BPQC using the disruption numbers. As a result, calculated bus total cost including power quality cost through case study.

  • PDF

A Study of the Quality Costs in Manufacturing Systems (제조시스템에서의 품질비용에 관한 연구)

  • Chang, Seog-Ju;Lee, Sung-Woong;Park, Young-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.23 no.2
    • /
    • pp.10-27
    • /
    • 1995
  • This paper illustrates a method of developing a function of quality costs in manufacturing systems. It begins with a discussion of the problem statement of this research. A review of existing literatures related to quality costs and economic design of quality inspection methods are discussed. Next mathematical models that quantify the production cycle time and quality costs are formulated. This paper ends with an example that demonstrates the usefulness of the model and highlights the importance of using a system approach. The main contribution of this work is the more realistic considerations of the four types of quality costs (prevention cost, appraisal cost, internal failure cost, external failure cost) in manufacturing systems.

  • PDF

A Model for Power Quality Control Mechanism for Electric Power Market (전력시장체제하에서의 전력품질제어 매커니즘에 대한 모델링)

  • Lee, Geun-Joon;Yun, Suk-Ho;Heydt, G.T.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.15-19
    • /
    • 2002
  • To provide a specified power quality under electric market system is becoming an important issue for customers and utility company. However, there is no realistic infra-structure to design a power system for the specified power quality. Present electric market is operating under the economic point of view. The low price could be attractive. but the effect of low price and low power quality for the long time should be considered for the system safety. This paper presents a model which conceptualize the dynamic power quality control mechanism to minimize total cost of a society which is affected electric power quality. This model aims to produce a basic infra-structure to balance cost and quality under the electric market system.

  • PDF

Optimization of Redundancy Allocation in Multi Level System under Target Availability (목표가용도를 고려한 다계층 시스템의 최적 중복 설계)

  • Chung, Il-Han
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.3
    • /
    • pp.413-421
    • /
    • 2013
  • Purpose: System availability and life cycle cost are often used to evaluate the system performance and is influenced by the operation and maintenance characteristic. In this paper, we propose the method to improve life cycle cost and satisfy the target availability through redundancy allocation. Methods: We consider the redundancy is available at all items in multi level system. Thus, we assume that sub-assembly, module, components can be duplicated. Simulation and genetic algorithm are employed to optimize redundancy allocation. Results: Target availability is higher, the life cycle cost is increased. In addition, the items for redundancy are selected at higher level in multi level system if target availability is higher. Conclusion: We could know that target availability affects the duplication number of items and the selection of redundancy items. For further study, we will consider new optimization algorithms to compare with the proposed GA algorithm and improve optimization performance.

A STUDY ON THE INTRODUCTION OF THE PAY ADJUSTMENT SYSTEM FOR THE VOLUNTARY ASSURANCE OF QUALITY BY THE CONTRACTORS

  • Byung-Ok Noh;Sang-Beom Lee;Jai-Dong Koo
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.521-525
    • /
    • 2011
  • Although the Korean construction industry has risen rapidly, the quality of the buildings is not met with the industry standard compared to the potential of the technology development and the cost of maintenance has been increased. The user's request for quality have been increased, but in the current building construction, the contractors only follow the specifications of design, material and technology, and their main concern is whether they are in right track with the specification or not. Thus, the necessity of developing technology has been ignored and sufficient opportunities for the development have not been provided as well. In the developed countries, in contrast, the quality assurance and the payment regulation system has been utilized for the active response to the changes of users' request. As a result of this, the maintenance cost has been decreased and the development of construction technology has been improved. Therefore the pay adjustment system is needed to create the improvement of the quality of the buildings by the contractors' earnest building construction. In order to introduce the pay adjustment system suitable to the Korean construction industry, this study presented the logical method of adjusting the construction cost and making payment with the pay adjustment index that is created based on the result of the performance test, after making a set of the indicators of the building performance standard and applied them to the targeted building.

  • PDF

Development of the DRG Adjust Index for Nursing Care Quality Assurance (간호의 질 보장을 위한 DRG 보정지수 개발)

  • Kim, Sea-Wha;Kim, Yun-Mi
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.10 no.1
    • /
    • pp.1-9
    • /
    • 2004
  • Korean health insurance has adopted preliminary DRG payment system through 8 DRGs from 1997. But present DRG payment system gives economic incentives for hospitals to hire less nurse. This study was attempted to develope DRG adjust index to differentiate DRG price by nurse staffing level for nursing care quality. Method: We analyzed inpatient care cost by medical institute and developed DRG adjust index to differentiate DRG price by nurse staffing level. Results: Among same medical institute, inpatient care cost are very different according to hospital's nurse staffing level. In the case of casarean section, inpatient care cost of the 1st grade general hospital are more expensive 85,732won than the 6th grade hospital. The cost difference are 8.24% of total casarean section DRG price and 16.48% of DTG variable price. We developed DRG adjust index-a to apply DRG variable price and index-b to apply DRG total price for compensation cost difference of hospitals. Conclusions: DRG price adjust index will give economic incentive for hospitals to hire more nurse and improve nursing care quality.

  • PDF

Mechanized tunnels lining prefabricated segments production methods

  • Elaheh Banihashemigargari;Amir H. Rezaeifarei
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.503-512
    • /
    • 2023
  • In tunneling projects, a significant part of the costs is spent on segment production. By more economically producing, the cost of tunnel construction can be greatly reduced, especially in long and large-diameter tunnels. In the present study, the effect of using the Carousel method in the improvement of the production system performance compared to the conventional Static system has been studied. To carry out the research, a quantitative comparison of cost and production time was carried out for two production methods using the available documentation. The opinions of experts have been obtained using questionnaires and qualitative comparison of cost, time and production quality was done by implementation of statistical analysis. The SPSS software and the univariate t-test were used to analyze the questionnaires. According to the results of statistical analysis with SPSS, the use of the Carousel method will reduce production time and costs along with increasing manufacturing quality. According to the documentation analysis, the Carousel method reduces the cost of production by almost 30% and leads to a reduction of the production time to approximately 40% of the Static moulds system. The Carousel method has a higher production rate, efficiency, and better performance. Research into quantifying the benefits of Carousel method in the production system performance is very limited. This comparison is based on real information from the under construction Tabriz Metro project. This article can be very helpful in choosing the best production method.