• Title/Summary/Keyword: QRA

Search Result 75, Processing Time 0.024 seconds

An Availability Assessment of Protection Wall Installed in LPG Filling Station (LPG 충전소 내 설치된 방호벽의 효용성 평가)

  • Lee, Jin-Han;Jo, Young-Do;Moon, Jong-Sam;Kim, Lae Hyun
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.5
    • /
    • pp.38-45
    • /
    • 2018
  • Jet fire, pool fire, and vapor cloud explosion are major accident scenarios in LPG filling station. The protection wall would mitigate radiation effect in a jet fire. In case of a pool fire, the protection wall would restrict expanding the pool area. The protection wall might both obstruct the dispersion of released vapor and protect blast overpressure in a vapor cloud explosion scenario. In this paper, An availability assessment method of the protection wall how much reduce damage to receptors is proposed. Additionally application cases are presented for the effectiveness of protection wall in the LPG filling station. The study shows that the protection wall can effectively reduce the death probabilities of receptors located behind the wall in cases of the jet fires and the vapor cloud explosions.

A Study on Facility Criteria of Small Petrol Stations based on Quantitative Risk Assessment (정량적 위험성 평가에 기반한 간이 주유취급소 시설기준에 대한 연구)

  • Park, Wooin;Ku, Jae-Hyun;Song, Yong-Sun
    • Journal of the Korean Institute of Gas
    • /
    • v.18 no.3
    • /
    • pp.44-52
    • /
    • 2014
  • Small petrol stations have great potential for a wide distribution in metropolitan area in which the land value possesses primary installation cost of the facility. The objective of the present study is to propose appropriate facility regulations of small petrol stations in Korea that can be popularly installed in the future in terms of securing safety in addition to serviceability. The hazard analysis and damage prediction from the possible fire and explosion accidents were performed using a software, PHAST v.6.5. As essential components of the facility regulations proposed in this study, the regulations about the refueling lot, maximum capacity of underground tank, location of fixed refueling facilities, height of firewall for small petrol stations were subsequently compared with those for regular-sized petrol stations.

The Safety Design of Corrosive Chemical Handling Process based on Reliability Database (신뢰도 데이터베이스 기반 부식성 화학물질 취급공정의 안전설계)

  • Chu, Chang Yeop;Baek, Jong Bae
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.141-149
    • /
    • 2018
  • In a PCB factory, there is a corrosive chemical substance supply system that can causes major leakage accidents. These accidents can give rise to shut down the factory and do residents damage that cause enormous loss of properties. To mitigate these risks, it is necessary to provide a chemical disaster prevention system. Moreover, after considering the situation and environment of the production site, it is of great importance to build an optimal chemical accident prevention system by reflecting risk reduction measures from the point of process design and by assessing quantitative risk based on reliability data. However, because there was no established database of the reliability about facilities and equipment that can be used in the domestic, the business site and consulting organization had being used the reliability data such as USA CCPS(Center for Chemical Process Safety). In these days, Korean institutes are studying on reliability data utilization method of quantitative risk assessment for preventing chemical accidents and domestic utilization algorithms and storage bed of reliability data. This study presents samples of reliability database about the chemical substance supply system that constructed from the history data such as failure, maintenance for 10 years at a PCB factory. Also, this work proposes the safety design criteria for supply facilities of corrosive chemical substance by assessing quantitative risk on the basis of the reliability data.

Study on the Enhancement of the Functionality of Construction Graphical Simulation System (건설 그래픽 시뮬레이션 시스템의 기능개선에 관한 연구)

  • Kim Yeong-Hwan;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.543-547
    • /
    • 2004
  • Visualization of construction process simulation and physical modeling were considered to overcome the limitations of current graphical simulation. The output of discrete-event simulation programs which are the most common mathematical statistical simulation tool for construction processes were analyzed for the visualization of earthmoving process that dealing with objects without fixed. Object-oriented models for equipment, material and work environments were devised to effectively visualize the numerical simulation results of the working time, the queuing time as well as the amount resources etc. The oscillation of the crane's cable and the lifted material that should be considered to rationally modeled and simulated by construction graphical simulation. The derived equation of motion was solved by numerical analysis procedure. Then obtained results was used for physical modeling.

  • PDF

Application of Fuzzy Math Simulation to Quantitative Risk Assessment in Pork Production (돈육 생산공정에서의 정량적 위해 평가에 fuzzy 연산의 적용)

  • Im, Myung-Nam;Lee, Seung-Ju
    • Korean Journal of Food Science and Technology
    • /
    • v.38 no.4
    • /
    • pp.589-593
    • /
    • 2006
  • The objective of this study was to evaluate the use of fuzzy math strategy to calculate variability and uncertainty in quantitative risk assessment. We compared the propagation of uncertainty using fuzzy math simulation with Monte Carlo simulation. The risk far Listeria monocytogenes contamination was estimated for carcass and processed pork by fuzzy math and Monte Carlo simulations, respectively. The data used in these simulations were taken from a recent report on pork production. In carcass, the mean values for the risk from fuzzy math and Monte Carlo simulations were -4.393 log $CFU/cm^2$ and -4.589 log $CFU/cm^2$, respectively; in processed pork, they were -4.185 log $CFU/cm^2$ and -4.466 log $CFU/cm^2$ respectively. The distribution of values obtained using the fuzzy math simulation included all of the results obtained using the Monte Carlo simulation. Consequently, fuzzy math simulation was found to be a good alternative to Monte Carlo simulation in quantitative risk assessment of pork production.

The effect of a risk factor on quantitative risk assessment in railway tunnel (철도터널에서 위험인자가 정량적 위험도 평가에 미치는 영향)

  • Yoo, Ji-Oh;Kim, Jin-Su;Rie, Dong-Ho;Shin, Hyun-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.117-125
    • /
    • 2015
  • Quantitative risk assessment (QRA) of railway is to create a variety of scenario and to quantify the degree of risk by a result of the product of accident frequency and accident. Quantitative risk Assessment is affected by various factors such as tunnel specifications, characteristics of the fire, and relation of smoke control and evacuation direction. So in this study, it is conducted that how the way of smoke control and the relation of smoke control and evacuation direction affect quantitative risk assessment with variables (the tunnel length (2, 3, 4, 5, 6 km) and the slope (5, 15, 25‰)). As the result, in a train fire at the double track tunnel (Area = $97m^2$), it is most efficient to evacuate to the opposite direction of smoke control regardless of the location of train in train fire. In addition, under the same condition, index risk in mechanical ventilation up to 1/10.

A Study on the Methodology modelling of Risk Assessment in Road Tunnels (도로터널시설 위험평가 모델링을 위한 방법론 연구)

  • Cho, Inuh;Han, Dae-yong;Kim, Seung-jin;Yoon, Jong-ku
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.59-73
    • /
    • 2016
  • The demand for subsurface transport is increasing. The users and the operators of road tunnels are exposed to risks with different causes. One main cause, however, is the traffic situation in the event of accidents. The importance of a Quantified Risk Assessment is increasing to quantify the safety of road tunnels and to balance the requirements (capacity, reliability, availability, maintainability and safety) of various stakeholders. Although there are classical methods for risk assessments, such as ETA and FTA. These methods are used for relatively simple cases because it could not relevantly reflect the diversity and relationship of the parameters. Therefore, a quantitative risk assessment based on Bayesian Probabilistic Networks considering interdependence between the parameters of a complex underground system as a double deck tunnel is provided.

Management of Change in the Chemical Industries Based on Risk Assessment (위험성 평가에 기반한 화학산업의 변경관리)

  • Yoo, Jin Hwan;Lee, Heon Seok;Choi, Jeong Woo;Seo, Jae Min;Ko, Jae Wook
    • Korean Chemical Engineering Research
    • /
    • v.46 no.1
    • /
    • pp.156-163
    • /
    • 2008
  • Process change and modification, which are caused by process failure, equipment life cycle and economic environment, have been generated in the chemical plants. And the MOC (management of change) base on the reasonable process safety technology such as change judgment, hazard identification by accurate technical references and risk assessment. But it is difficult to carry out the MOC because of lack of experience, shortage of knowledge and none of process safety specialists. In this study, the MOC system which could make enhancement of safety by finding and complementing weakness of MOC in chemical facilities was developed. This developed MOC system based on QRA was recommended the obvious standard for decision-making process, MOC procedure based on risk assessment and risk estimation of the process modification. The study based on the above way sought the enhancement of safety by performing Risk Based MOC for chemical plants.

Development of Emergency Response System by Risk Assessment Methodology in Energy Facility (에너지 시설물의 위험성 평가에 따른 비상대응 시스템 구축)

  • Lee, Heon-Seok;Kang, Seung-Gyun;Jung, In-Hee;Kim, Bum-Su;Yoo, Jin-Hwan;Park, Chul-Hwan;Kim, Dae-Heum;Ko, Jae-Wook
    • Journal of the Korean Institute of Gas
    • /
    • v.12 no.2
    • /
    • pp.118-123
    • /
    • 2008
  • There are many facilities, such as facilities for high pressure gas storage and systems related to high pressure pipes, to handle hazardous materials in energy industries. Because the foundation of the proper risk analysis and management system has not been established, there is the possibility of an accident and Korea has met higher accident rate than developed countries. These accidents in energy facilities could cause great damage to facilities including the surrounding area, We have conducted the present research in order to systematize the emergency response system (ERS) using a lot of information on the degree of damage in an accident by consequence analysis.

  • PDF

Case Study on Advanced Fire and Explosion Index (화재폭발지수 개선에 대한 사례 연구)

  • Na, Gun Moon;Seoe, Jae Min;Lee, Mi Jeong;Baek, Jong-Bae
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.6
    • /
    • pp.78-84
    • /
    • 2020
  • The F&EI technique is one of the risk assessments with many advantages. It can save time and effort compared to quantitative risk assessment (QRA). By using the evaluation result of this technique, it is possible to check the effectiveness of the investment cost. In addition, a relative risk ranking can be created and used to establish the facility management cycle and to prioritize investment. However, evaluating the target process can be evaluated more than the actual risk since the LCCF, a loss prevention measure, is too limited. In addition, calculating premiums via this method can result in excessive premiums, making it difficult to evaluate the risk precisely. Therefore, new safety guard was added to the LCCF of the F&EI risk assessment with reference to HAZOP and LOPA techniques. Newly added LCCFs are Deflagration arrester, Check valve, SIS, and Vacuum beaker, etc. As a case study, F&EI risk assessment was performed on Acetone storage tank of a API (Active pharmaceutical ingredient) plant to compare actual MPPD. The estimated loss amount was 592,558$ for the existing technique and 563,571$ for the improved technique, which was reduced by about 5% compared to the previous one.This proved that a more precise evaluation is possible and that the efforts for safety at the workplace are reflected in the evaluation results.