• Title/Summary/Keyword: Q-Cost

Search Result 326, Processing Time 0.025 seconds

Quality Cost Model for a Product in the User's Viewpoint (제품의 사용자 관점에서의 품질비용 모델)

  • Yi, Sang Yong
    • Journal of Korean Society for Quality Management
    • /
    • v.19 no.2
    • /
    • pp.158-165
    • /
    • 1991
  • The Q-cost has been used in the manufacturing company to decide the optimal level of company's product quality, and to evaluate the effect of company's quality control system since the advent of Q-cost theory. In spite of the following costs are generated in the user side, owing to an unsuitable level of product quality and inadequacy of company's quality control system, these costs are not usually included in the company's Q-cost : (1) the cost generated in relation to a claim proposal as traffic expeneses and transpotation of the product. (2) the cost of maintenance through the useful life of the product, especially accured after quality warranty period. (3) the cost related to the economical efficiency in using the product. (4) the cost ralated to a customer dissatisfaction for the product quality. In this point of view, the contents of user side Q-cost, and the relations between the user side Q-cost and the level of company's product quality are discussed. And then the importance of user side Q-cost in order to determine the optimal quality level is discussed.

  • PDF

(r, Q) Policy for Operation of a Multipurpose Facility (단일 범용설비 운영을 위한 (r, Q) 정책)

  • ;Oh, Geun-Tae
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.3
    • /
    • pp.27-46
    • /
    • 1992
  • This paper considers an (r, Q) policy for operation of a multipurpose facility. It is assumed that whenever the inventory level falls below r, the model starts to produce the fixed amount of Q. The facility can be utilized for extra production during idle periods, that is, when the inventory level is still greater than r right after a main production operation is terminated or an extra production operation is finished. But, whenever the facility is in operation for an extra production, the operation can not be terminated for the main production even though the inventory level falls below r. In the model, the demand for the product is assumed to arrive according to a compound Poisson process and the processing time required to produce a product is assumed to follow an arbitary distribution. Similarly, the orders for the extra production is assumed to accur in a Poisson process are the extra production processing time is assumed to follow an arbitrary distribution. It is further assumed that unsatisfied demands are backordered and the expected comulative amount of demands is less than that of production during each production period. Under a cost structure which includes a setup/ production cost, a linear holding cost, a linear backorder cost, a linear extra production lost sale cost, and a linear extra production profit, an expression for the expected cost per unit time for a given (r, Q) policy is obtained, and using a convex property of the cost function, a procedure to find the optimal (r, Q) policy is presented.

  • PDF

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

A Study on Implementation and Design of Web-based Q-Cost Management System : Part 2; Implementation (웹 기반의 품질코스트 관리시스템 구축 : 제2부; 시스템 구축)

  • Kim Yon-Soo;Chung Young-Bae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.4
    • /
    • pp.179-186
    • /
    • 2004
  • The purpose of this study is to implement web-based quality cost management system to measure the performance of quality improvement activities in the business firms. Developed WQCMS(Web-based Q-Cost Management System) have ability to collect and analyze quality data generated from various different departments in the inside or outside of the enterprise without any limitations, if end-users are able to access wide area network. It provides the capability to integrate quality information from database and to generate various easy analysis reports to management's needs using built-in analysis tool modules with real-time. The proposed system was developed using Microsoft's .Net technology, ASP.NET and MS-SQL Server 2000. By web-enabling Q-cost management system, the effectiveness of the system management and utilization was realized by easiness of information integration and economical efficiency.

Water Quality Management of the Youngsan River based on the 7Q10 and Q275 considering Wastewater Treatment Cost (하수처리비용을 감안하고 7Q10과 저수량에 기초한 영산강 수질관리방안 연구)

  • Cho, Jae-Heon;Yu, Tai-Jong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.16 no.6
    • /
    • pp.700-709
    • /
    • 2002
  • Present condition of the Youngsan River pollution is serious. Concentrations of organic materials and nutrients are high and algal bloom takes place frequently. The pollution is mainly caused by domestic wastewater input from urban areas like Kwangju and Naju City. In this study, 6 times of water quality surveys were done for mainstream and tributaries. Delivery ratios of each tributaries are calculated with the water quality and flow data. With Arc/View GIS, sub-basin are divided and pollution loads are estimated. These data are used for water quality modeling. River quality improvement effects are analysed with 5 scenarios including process upgrade of present WWTPs and construction of new WWTPs. These scenarios are applied for the Youngsan River based on the 7Q10 and Q275. And total wastewater treatment cost in the basin is analysed for each scenario.

Determining the Proper Level of Spare Parts using the CSP and (r,Q) Policies in a Two-Echelon Distribution System (2계층 분배시스템에서 혼합재고정책을 이용한 적정재고수준 결정에 관한 연구)

  • Jeong, Suk-Tae;Lee, Jung-Hack;Kim, Kyung-Sup
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.4
    • /
    • pp.121-127
    • /
    • 2007
  • CSP(Concurrent Spare Parts) is supplied with the procurement of new equipment or weapon system and is used to sustain the equipment without resupply during the initial coverage period. This study is concerned with a problem of determining the near optimal inventory level of the spare parts, especially Concurrent Spare Parts. For this, we utilize the mixed periodic and continuous review polices considering the CSP and (r,Q) Policies concurrently in a two-echelon distribution system. We propose the mathematical model to minimize the total cost which is composed with ordering cost, purchasing cost, holding cost, and stickout cost. If the mixed policy is compared to other policies(CSP, (r,Q)), the proposed methodology performs well and is best policy in the equipment maintenance expenses.

A Study on Cost Evaluation for Capacitive Reactive Power (무효전력 비용 산정에 관한 연구)

  • 정춘식;박정도;문영현
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.3
    • /
    • pp.182-186
    • /
    • 2004
  • In this paper, the cost for capacitive reactive flower is evaluated considering the deregulation environment. For the cost assessment of reactive power, the duration curve of reactive power demand is introduced and investigated. Also, a guideline is suggested to estimate the Q-cost by using the inverse of the Q-demand duration curve. In order to obtain optimal real reactive power allocation, a new algorithm is proposed by using the piecewise linearization of the inverse of the Q-demand duration curve and the Linear Programming technique. The proposed method is tested with sample systems using MATLAB. The test results show that the algorithm yields reasonable reactive power allocation and Provides fair cost evaluation for reactive power.

A Study on the (Q, r) Inventory Model under the Lead Time Uncertainty and its Application to the Multi-level Distribution System (주문 인도기간이 불확실한 상황에서의 (Q, r) 재고 부형과 다단계 분배 시스템의 응용에 관한 연구)

  • 강석호;박광태
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.11 no.1
    • /
    • pp.44-50
    • /
    • 1986
  • In this paper, we find optimal policy for the (Q, r) inventory model under the lead time uncertainty. The (Q, r) inventory model is such that the fixed order quantity Q is placed whenever the level of on hand stock reaches the reorder point r. We first develop the single level inventory model as the basis for the analysis multi-level distribution systems. The functional problem is to determine when and how much to order in order to minimize the expected total cost per unit time, which includes the set up, inventory holding and inventory shortage cost. The model, then, is extended to the multi-level distribution system consisting of the factory, warehouses and retailers. In this case, we also find an optimal policy which minimizes the total cost of the contralized multi-level distribution system.

  • PDF

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.