• 제목/요약/키워드: Pumped-storage

검색결과 126건 처리시간 0.027초

CBP시장의 정산 규칙개정에 따른 양수발전의 재무적 영향 분석 (Study on financial effects resulted from modified settlement rules)

  • 이재걸;윤용범;안남성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.177-179
    • /
    • 2005
  • In Korean Power Market, Cost-based Bidding Pool is maintaining the present condition because restructuring of electricity industry is holding. When this market is designed, Settlement rules for Pumped-storage power plant made unfairly by other power plants. These rules were considered contribution of Pumped-storage power plant to network operation. by the way, there are some discussion about Settlement rules modification. so in this paper, we calculated financial effect of power plant by modified rules. And when we modify market rules, we can offer numerical information.

  • PDF

Fly Ash를 이용한 댐 콘크리트의 기본 물성에 관한 연구 (Basic Properties of Dam Concrete using Fly Ash)

  • 송영철;우상균;방기성;정원섭
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1999년도 봄 학술발표회 논문집(I)
    • /
    • pp.619-624
    • /
    • 1999
  • The purpose of this study is to provide the optimum mix design of fly ash concrete to be placed at the concrete face rockfill dam for pumped storage power plats. The basic performance tests including compressive strength, modulus of elasticity, unit weight, coefficient of thermal expansion, shrinkage, adiabatic temperature rise and analysis of thermal stress were conducted for fly ash concrete. From this study, the fly ash concrete represented the better results in the aspects of basic performance and economy than ordinary portland cement concrete. Especially the concrete mix design containing 15% of fly ash is recommended to be applied in the construction of the concrete face rockfill dam for pumped storage power plants.

  • PDF

고속 Hartley 변환을 이용한 확률론적 발전 시뮬레이션에 관한 연구 -수력 및 양수발전기의 운전을 고려한 경우- (A Study on the Probabilistic Production Costing Simulation using Fast Hartley Transform - with considering Hydro and Pumped-Storage Plants -)

  • 송길영;최재석;김용하
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1989년도 추계학술대회 논문집 학회본부
    • /
    • pp.194-196
    • /
    • 1989
  • The production costing plays a key role in power system expansion and operations planning especially for the calculation of expected energy, loss of load probability and unserved energy. Therefore, it is crucial to develope a probabilistic production costing algorithm which gives sufficiently precise results within a reasonable computational time. In this respect, a number of methods of solving production simulation have been proposed. In previous paper we proposed the method used Fast Hartley Transform in convolution process with considering only the thermal units. In this paper, the method considering the scheduling of pumped-storage plants and hydro plants with energy constraints is proposed.

  • PDF

해석적 비용함수와 최대원리리에 의한 양수운전을 포함하는 최적전원계획 (Optimal Generation Planning Including Pumped-Storage Plant Based on Analytic Cost Function and Maximum Principle)

  • 박영문;이봉용
    • 대한전기학회논문지
    • /
    • 제34권8호
    • /
    • pp.308-316
    • /
    • 1985
  • This paper proposes an analytic tool for long-term generation expansion planning based on the maximum principle. Many research works have been performed in the field of generation expansion planning. But few works can be found with the maxinmum principle. A recently published one worked by professor Young Moon Park et al. shows remarkable improvements in modeling and computation. But this modeling allows only thermal units. This paper has extended Professor Park's model so that the optimal pumped-storage operation is taken into account. So the ability for practical application is enhanced. In addition, the analytic supply-shortage cost function is included. The maximum principle is solved by gradient search due to its simplicity. Every iteration is treated as if mathematical programming such that all controls from the initial to the terminal time are manipulated within the same plane. Proposed methodology is tested in a real scale power system and the simulation results are compared with other available package. Capability of proposed method is fully demonstrated. It is expected that the proposed method can be served as a powerful analytic tool for long-term generation expansion planning.

  • PDF

고압 대전류용 전력변환 점호장치 및 감시시스템 개발 (Development of firing equipment and monitoring system for electric power conversion system for high voltage and large current)

  • 이주현;임익헌;류호선
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2006년도 전력전자학술대회 논문집
    • /
    • pp.481-484
    • /
    • 2006
  • A electric power conversion system in a pumped storage power plant is important equipment for converting electric motor kinetic energy into electric power. A electric power conversion monitoring system consists of high voltage thyristor firing equipment, fault detection module, data gathering module, real time data processing equipment and man machine interface system. This paper describes electric power conversion system overview, the developed SFC monitoring system configuration including system characteristics, and successful application result to San-Cheong pumped storage power plant.

  • PDF

전선차용계면에서의 아수발전성 최적화를 위한 해석적 앨고리즘에 관한 연구 (Optimization of Pumped-Storage Energy in Operation Aspect Using the Analytic Cost Function)

  • 박영문;서보혁
    • 대한전기학회논문지
    • /
    • 제32권5호
    • /
    • pp.176-182
    • /
    • 1983
  • This paper derives a newly neveloped analytic optimal condition to minimize the operating cost of a generation system in the aspect of Power System Planning, When the system includes pumped-storage units. The analytic optimal condition is derived by defferentiating the analytic cost function, Which were obtained by assuming the load and generating as Gaussian random variables, with respect to the variations of pumping energy. The condition is resulted in very simple form and various optimization techniques can be used. The simulation results of a case study were compared with the results of the conventional methods to prove the usefulness of the algorithm.

양수 발전 전동기 고정자 권선 절연진단 및 수명평가에 관한 연구 (A Study on The Insulation Diagnostic and Life Evaluation for the Pumped Storage Generator/Motor)

  • 박종정;김희동;이영준;주영호;한상옥
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 E
    • /
    • pp.1717-1720
    • /
    • 1998
  • In pumped storage Generator-motor stator windings gradually deteriorates due to mechanist, thermal, electrical stresses. These stresses combine to result in loose windings, delamination of the stator insulation and/or electrical tracking of the endwinding, all of which can lead to stator insulation failures. Since the degration of generator-motor is gradually occurred, regular inspection system is necessary to monitor degrading. The result of this diagnosis is a basic for the maintxnance of generator-motor.

  • PDF

한전 전력계통의 저주파 진동현상 요인분석;양수발전기 기동시 (Analysis of the Factors Affecting Low-Frequency Oscillations in KEPCO Power System` With Pumped-Storage Plant)

  • Kil Yeong Song;Sae Hyuk Kwon;Kyu Min Ro;Seok Ha Song
    • 대한전기학회논문지
    • /
    • 제41권8호
    • /
    • pp.841-849
    • /
    • 1992
  • In power system operation, the stability of synchronous machine has been recognized one of the most important things. AESOPS program developed by EPRI in U.S.A. is a frequency domain analysis program in power system stability and it computes the electro-mechanical oscillation mode. This paper presents how to analyze the power system small signal stability problem efficiently by uusing the AESOPS program and analyze the various factors affecting the damping characteristics of these oscillations in KEPCO power system of 1986 with pumped-storage plant. To reduce the computing time and efforts, selecting the poorly-damped oscillation mode and clustering technique have been used. The characteristics of load, the amount of power flow on the transmission line and the gain of exciter have a significant effects on the damping of the system while the governing system has only a minor one. With the Power System Stabilizers, the stability of the power system has been improved.

  • PDF

에너지제약을 갖는 발전기의 운전을 고려한 기동정지계획에 관한 연구 (Unit Commitment Considering Operation of Energy Constrained Units)

  • 송길영;이범;김용하
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.117-119
    • /
    • 1993
  • This paper presents a new method for solving unit commitment problem including hydro and pumped storage hydro units in a large scale power system. The proposed method makes it possible to get variable power of hydro and pumped storage hydro units and results in the better unit commitment with good convergency. Moreover this paper proposes an unit commitment algorithm to consider variable power of these units effectively by Lagrangian Relaxation method. By applying the proposed method to the test system, it is verified the usefulness of this method.

  • PDF

양양양수 온라인 무효전력 운전범위 시험과 과여자제한기(OEL) 동특성 시험 (On-line Tests of on the Yang-Yang Pumped Storage Plant for the Reactive Power Limits and the OEL Dynamics)

  • 김동준;문영환
    • 전기학회논문지
    • /
    • 제56권8호
    • /
    • pp.1343-1350
    • /
    • 2007
  • This paper describes the tests on the reactive power output limit and the Over-Excitation Limiter (OEL) dynamics of a generation unit. The suggested test methods on reactive limit can identify the allowable maximum/minimum reactive power at 100% rated MW in the steady-state unit operation condition. The on-line OEL test method can identify the time characteristics of OEL with the generation output at 50% of the rated MW. These methods are validated by applying to four Yang-Yang pumped storage units with 282 rated MVA each.