• Title/Summary/Keyword: Public procurement

Search Result 181, Processing Time 0.032 seconds

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing- (건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로-)

  • Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.

Derivation of Linkage Strategies for Domestic Order Documents and Standards for BIM Application Projects - Proposing BIM Design Procurement Use Guides for Domestic Railway Field by Analyzing Singapore Requirements Documents - (BIM 적용사업 대상의 국내 발주문서 및 기준 간 연계전략 도출 - 싱가폴 요구사항 지시서 분석을 통한 국내 철도분야 BIM 전면설계 발주문서 활용방법 제안 -)

  • Chong, HeeGun;Kim, Do-Young;Hong, Chang Hee;Lee, Jaewook;Moon, Hyeonsuk
    • Journal of KIBIM
    • /
    • v.13 no.4
    • /
    • pp.26-35
    • /
    • 2023
  • Recently, mandatory BIM design has been enforced in the civil engineering field, focusing on public projects, and inducement measures to actively participate in BIM by participating subjects are required. The BIM ordering documents must reflect the characteristics of the BIM project, current construction standards and laws, and environmental conditions of domestic participants. In this study, we analyze the ordering documents used in domestic and overseas civil engineering BIM projects to determine whether they meet the purpose of BIM. In the future, items that consider the existing heterogeneous data linkage and compatibility, the connectivity with the current construction guidelines and laws, the cost of the designer and the input personnel are prepared for the part that does not meet the BIM purpose. Furthermore, the written order documents are verified through interviews with experts who have experience in BIM projects. Through the results of this study, I would like to propose a consultation system strategy to prepare and present items according to the purpose and type of project by client.

Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings (공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.415-422
    • /
    • 2014
  • There is growing difference between a planned value and an actual cost for increasing as an risk of construction cost. A construction cost index is an alternative to redeem a problem, but it is still very difficult to reduce an actual differential as a price fluctuation. Furthermore an existing theory of a construction cost index is overly complex, and is unsuitable for using in working-level. This study suggests an optimum correction rate in respect of a total construction cost. It is analyzing the actual cost of 53 public buildings that the Public Procurement Service ordered. The objects are main processes that include architectural works, mechanical works, electrical works, telecommunication works, and service facilities. It is compared a total construction cost based on absolute error rate using the median from frequentist principle. For this, it is selected the suitable regression model and set a correction rate.

Public Enterprise Privatization and WTO Government procurement Agreements (WTO 정부조달협정과 공기업 민영화)

  • Kang, S.W.
    • Electronics and Telecommunications Trends
    • /
    • v.18 no.5 s.83
    • /
    • pp.103-114
    • /
    • 2003
  • 공기업이 민영화가 이루어졌다고 해서 자동적으로 WTO GPA 양허대상에서 철회될 수 있다는 것을 의미하지 않는다. WTO GPA 양허목록에서 철회되려면 여타 회원국의 동의를 받아야 한다. 그러나 문제는 회원국들로부터 동의를 받기도 어려울 뿐더러, 현재 WTO GPA에는 공기업 민영화에 대한 명확한 기준을 가지고 있지 못하다는 점이다. 따라서 공기업이 민영화가 되었다고 하더라도 민영화에 대한 판단 기준이 없으므로 민영화 이후에도 양허대상에서 제외될 수 없다. 이러한 문제점을 해결하기 위해서는 공기업 민영화에 대한 명확한 기준의 설정이 요구되나, 이러한 판단 기준은 우리나라 독자적인 힘으로는 만들 수 없다. 그러므로 일본, EU 등 민영화 판단 기준에 대한 제안을 WTO에 제출한 회원국들과 협조하여 명확한 공기업 민영화 기준을 설정하는 노력이 요구되며, 이를 통하여 민영화된 공기업이 양허대상에서 제외 될 수 있도록 하여야 할 것이다.

An Assessment of the Energy Consumption & CO2 Emission during the Construction Stage of Government Building using the Input-Output Analysis (산업연관분석법을 통한 공공청사 신축공사단계의 에너지 소비량 및 CO2 발생량 평가)

  • Choi, Young-Hun;Lee, Sang-Beom;Song, Ho-San
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.149-150
    • /
    • 2011
  • Recently, Goverment's Energy-saving policy in Korea as 'Green Growth' is very remarkable effort. By intensive poliicies, the private is encouraged to participate in policy. Especially, it is very important in the field of architecture and we have to work for construction of law system. However, these efforts of the government buildings for energy efficiency in use stage is as mandatory system that may occur in the construction phase and the enviromental impact of greenhouse gas reductions is not affected. For this reason, Assess the amount of the energy consumption and CO2 emissioont of Government Buildings in 2010 ordered by PPS(Public Procurement Service) in the construction phase and suggest to recognize the need for legal restrictions.

  • PDF

A Study on the Review Methods of Design Errors in Construction Phase of BIM Project (BIM 프로젝트 시공단계의 설계오류 검토 방안에 관한 연구)

  • Lee, Se-Ip;Sim, Un-Jun;Ahn, Young-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.25-27
    • /
    • 2012
  • The domestic construction industry recognize that review of design and construct-ability has the devastating effects. The way to take advantage of BIM for increase the possibility of discovered the design errors in advance are being discussed a lot recently. Since 2012, Public procurement published that the Turn-key project which is the more than 50 billion won in construction have to let the BIM-based design be mandatory. However, people expected the advent of BIM technology can resolve the existing design errors. But the situation is the connection of design stage and construction stage is very insufficient in domestic. Therefore, in this study understanding the types of design errors in construction phase. according the review of design errors before construction. Then can acceleration the application of BIM to improve the workability in a construction site.

  • PDF

An Analysis on the Influential Factors to Set the Path Planning Algorithm for Unmanned Ground Vehicle in Combat Environment (전장환경에서 무인전투차량의 경로계획 알고리즘설정 영향요인 분석)

  • Baek, Jong-Sung;Lee, Choon-Joo
    • The Journal of Korea Robotics Society
    • /
    • v.4 no.3
    • /
    • pp.233-242
    • /
    • 2009
  • This paper briefly reviews the path planning methods that are applicable to the autonomous mobile robots for the military. Two distinct path search algorithms, $A^*$ and $D^*$ that are most popular and flexible in public applications, among those reviewed are coded and analyzed in terms of combat environment assessment factors called METT+TC for the area of operations. The results imply that it is important to consider the characteristics of defense acquisition process and the specific requirements of defense operation so that the successful technology development of the Robot products is directly linked to the defense procurement of Robot products.

  • PDF

A Strategy for Marketing Information for SME considering Product and Technology Development (제품 및 기술 개발을 고려한 중소기업 마케팅 정보 제공 전략)

  • Lee, Chang-Soo;Son, Kwang-Hee;Chung, Chang-Hwan
    • Proceedings of the Korea Database Society Conference
    • /
    • 2008.05a
    • /
    • pp.253-261
    • /
    • 2008
  • Many SME have difficulties in marketing activities from early product and technology development because of lack of internal marketing abilities. This paper presents the strategy for the public information service providing so that the marketing oriented information system should provide appropriate information in every step of production from raw material procurement, processing, outsourcing, sales to collaboration. A prototype of marketing information system is implemented in terms of product information, market information, technology information and enterprise information.

  • PDF