• Title/Summary/Keyword: Public cost estimate

Search Result 194, Processing Time 0.031 seconds

Analysis and Realistic Estimation of Maintenance Cost of Construction Equipment Expenses (건설기계 경비의 관리비 구성 분석 및 현실화)

  • Kim, Kyung-A;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.503-508
    • /
    • 2007
  • The Equipment Expenses section of the Poom-Saem, that is used for Construction Cost Estimation on public sectors in Korea, has been rarely revised, and so does not reflect changes of construction equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of maintenance costs(Interest, Storage, Insurance, Tax), the equipment expenses section of the Poom-Saem and the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. Based on results from analysing figures related with the estimation of maintenance costs, the maintenance cost is redefined. Then, construction equipment was classified into 6 exclusive construction equipment and general one, and realistic figures of the maintenance cost, which consists of interest, storage, insurance, tax, are suggested respectively. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation that helps to estimate appropriate construction costs and the ground work of related studies.

  • PDF

Development of Systematic Process for Estimating Commercialization Duration and Cost of R&D Performance (기술가치 평가를 위한 기술사업화 기간 및 비용 추정체계 개발)

  • Jun, Seoung-Pyo;Choi, Daeheon;Park, Hyun-Woo;Seo, Bong-Goon;Park, Do-Hyung
    • Journal of Intelligence and Information Systems
    • /
    • v.23 no.2
    • /
    • pp.139-160
    • /
    • 2017
  • Technology commercialization creates effective economic value by linking the company's R & D processes and outputs to the market. This technology commercialization is important in that a company can retain and maintain a sustained competitive advantage. In order for a specific technology to be commercialized, it goes through the stage of technical planning, technology research and development, and commercialization. This process involves a lot of time and money. Therefore, the duration and cost of technology commercialization are important decision information for determining the market entry strategy. In addition, it is more important information for a technology investor to rationally evaluate the technology value. In this way, it is very important to scientifically estimate the duration and cost of the technology commercialization. However, research on technology commercialization is insufficient and related methodology are lacking. In this study, we propose an evaluation model that can estimate the duration and cost of R & D technology commercialization for small and medium-sized enterprises. To accomplish this, this study collected the public data of the National Science & Technology Information Service (NTIS) and the survey data provided by the Small and Medium Business Administration. Also this study will develop the estimation model of commercialization duration and cost of R&D performance on using these data based on the market approach, one of the technology valuation methods. Specifically, this study defined the process of commercialization as consisting of development planning, development progress, and commercialization. We collected the data from the NTIS database and the survey of SMEs technical statistics of the Small and Medium Business Administration. We derived the key variables such as stage-wise R&D costs and duration, the factors of the technology itself, the factors of the technology development, and the environmental factors. At first, given data, we estimates the costs and duration in each technology readiness level (basic research, applied research, development research, prototype production, commercialization), for each industry classification. Then, we developed and verified the research model of each industry classification. The results of this study can be summarized as follows. Firstly, it is reflected in the technology valuation model and can be used to estimate the objective economic value of technology. The duration and the cost from the technology development stage to the commercialization stage is a critical factor that has a great influence on the amount of money to discount the future sales from the technology. The results of this study can contribute to more reliable technology valuation because it estimates the commercialization duration and cost scientifically based on past data. Secondly, we have verified models of various fields such as statistical model and data mining model. The statistical model helps us to find the important factors to estimate the duration and cost of technology Commercialization, and the data mining model gives us the rules or algorithms to be applied to an advanced technology valuation system. Finally, this study reaffirms the importance of commercialization costs and durations, which has not been actively studied in previous studies. The results confirm the significant factors to affect the commercialization costs and duration, furthermore the factors are different depending on industry classification. Practically, the results of this study can be reflected in the technology valuation system, which can be provided by national research institutes and R & D staff to provide sophisticated technology valuation. The relevant logic or algorithm of the research result can be implemented independently so that it can be directly reflected in the system, so researchers can use it practically immediately. In conclusion, the results of this study can be a great contribution not only to the theoretical contributions but also to the practical ones.

Analysis of Socio-economic Effects of Land Consolidation and On-farm Development Project (경지정리사업(耕地整理事業)의 사회경제적효과분석(社會經濟的效果分析))

  • Lim, Jae Hwan;Kim, Jae Hong;Yeo, Soon Duck
    • Korean Journal of Agricultural Science
    • /
    • v.27 no.2
    • /
    • pp.158-175
    • /
    • 2000
  • Up to date, the economic feasibility analysis on land consolidation and on-farm development projects were mainly depended upon the direct benefits from market value of project outputs. Therefore the projects were neglected in allocation of the government's financial funds and loans on account of undervaluation of the project benefits including socio-economic and environmental values of the projects. Accordingly the Extended Benefit Cost Analysis Method should be adapted to cover not only the benefits such as non-market values of environmental functions of the projects and but also the economic market values of the project outputs. The main objectives of this study is (1) to provision of the guideline for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits such as Productivity increase effect, labor saving effect, off-farm income increase effect during off-farm season, saving of O&M cost of farm mechanization, enhance of farmer's public health, increase of environmental public function of paddy fields, effect of food security and establishment of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible the analysis of non-market goods such as the food security value and the environmental public value of paddy fields. To carry out the study, the publication on the guideline for economic analysis of agricultural projects were reviewed and consulted and for the post evaluation of the land consolidation and on-farm development project, field survey in Jeongja area were made for the feasibility study of the project by new method. According to the initial project plan, Jeongja land consolidation and on-farm development project has 96ha of benefit area and the project was started in 1989 and completed in the spring, 1990. The total project costs were amounted to 1,052 million won and the annual project benefits were estimated at 135.4 million in 1989 constant market prices. On the other hand, the newly estimated project benefits as a part of post evaluation of the project were amounted to 602.1 million won including all the benefits from the market and non-market commodities of the project as mentioned above column. The original IRP(Internal rate of return) of the project was estimated at 15.81%. On the other hand, the IRR of the post evaluation of the project was amounted to 16.83%. In case of including the benefit from the environment public function of paddy field, the SRR(Social Rate of Return) was reached to 38.81% and when we added the benefit from food security of the project, the SRR showed very high rate as 46.41%. In conclusion, the project were verified socio-economically feasible and environmentally sustainable considering the above decision making criteria.

  • PDF

Estimation of the Minimum Cost of Living in Seoul (서울시 지역최저생계비 계측에 관한 연구)

  • Kim, Kyung-Hye
    • Korean Journal of Social Welfare
    • /
    • v.38
    • /
    • pp.7-32
    • /
    • 1999
  • Providing the income support program for people under the poverty level has been regarded as the basic obligational role of modern government. The target population of this program should include all the poor who are unable to maintain the minimum health and decency level with their own income. The minimum living cost, however, varies within a country because there are regional differences in consumer price and the mode of living. The current program does not count for the regional differences, leaving a significant portion of Seoul's poor needy people being ineligible for this public care. Recognizing these regional differences, this paper attempts to estimate the minimum living cost in Seoul area, comparing it to the national one. It employs the data and method that the Korea Institute of Health and Social Affairs adopted in its 1994 study, since it has been served as a basis of the current public assistance program. The minimum cost of living in Seoul is estimated to be \887,611 per month for a 4-person household. It is 1.33 times greater than the national monthly minimum of \666,684. Based upon the '94 urban household expenditure survey data, some 5.9 percent of Seoul's population, 636,132 people, are found to be under the Seoul's minimum living level. This number is 5.2 times greater than those 123,304 people who are eligible for the current public assistance program in Seoul.

  • PDF

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

A National Chronic Disease Management Model and Evaluation of Validity of Primary Care Physician(PCP) Model in Korea (우리나라 만성질환 관리를 위한 질환주치의 모형의 타당성 분석)

  • Chun, Ki-Hong;Paek, Kyung-Won;Lee, Soo-Jin;Park, Chong-Yon
    • Health Policy and Management
    • /
    • v.19 no.3
    • /
    • pp.92-108
    • /
    • 2009
  • This study suggests a model for continuing and comprehensive management of hypertension or Type 2 diabetes mellitus (T2DM) in Korea. Moreover, this paper computed the contribution cost of hypertension or T2DM management using the healthcare medical cost, which could have occurred from stroke, myocardial infarction (MI), and end-stage renal disease (ESRD) that were successfully prevented from the effective hypertension or T2DM management. Additionally, these costs were compared with the cost of implementing the hypertension or T2DM management model suggested in this study. This study used the medical fee summary of the health insurance claims submitted to National Health Insurance Corporation by medical facilities for services provided during the period from January 1st 1999 to December 31st 2006. The prevalence rate with treatment referred to cases in which patients submitted their medical claims at least once during the period, along with an accordant diagnosis. The incidence rate with treatment referred to cases in which patients who never submitted claims for the accordant disease during the five years from 1999 to 2003 submitted claims for the accordant disease in 2004 and 2005. The relative risk of the occurrence of stroke, MI and ESRD was 11.0, 13.6, and 30.3, respectively. The attributable risk of hypertension or T2DM for stroke was 0.730, and that for MI and ESRD were 0.773 and 0.888, respectively. Based on these, the contribution cost of hypertension or T2DM is estimated to be 986.3 billion Korean Won(KRW) for stroke patients, 330.5 billion KRW for MI patients, and 561.7 billion KRW for ESRD patients as in 2005. Hence, the total contribution cost of hypertension or T2DM to stroke, MI, and ESRD is 1.878 trillion KRW. The estimate for operational costs included an annual expenditure of 50,000 KRW per each recipient and an annual subsidy of 0.22 million KRW per person for the 1.6 million low.income individuals with hypertension or T2DM to cover their out.of.pocket medical expenses. Under this assumption, it took approximately 0.6 trillion KRW to manage 5 million high.risk patients in the low. and mid.income range, coverings up to 50% of costs. In conclusion, considering the potential benefits of preventing stroke, MI, and ESRD, the costs seems to be reasonable.

Estimating the Economic Benefits of Conserving Urban Forests in the Capital Region: The Case of Mt. Kwanggyo (수도권 도시림 보존의 경제적 편익 추정 -광교산을 중심으로-)

  • Kwak, Seung-Jun;Yoo, Seung-Hoon;Han, Sang-Yong
    • Environmental and Resource Economics Review
    • /
    • v.12 no.1
    • /
    • pp.1-27
    • /
    • 2003
  • Urban forests have various environmental benefits, contributing to the quality of urban life. However, these values have been underestimated or never been reflected in the urban development planning in Korea. As a result, a number of forests in urban areas were either partly or wholly destroyed without their public's values being assessed explicitly. The objective of this paper is to estimate the economic benefits attached to Mt. Kwanggyo in the Capital Region using contingent valuation method, aiming to provide policy-makers with useful information to make an informed public decision in urban development planning. The survey was carefully designed and implemented to meet a number of recommendation rules suggested in the literature. The overall results show that the respondents well accepted the contingent market and would be willing to pay a significant amount for the proposed program of conserving the mountain. Total economic benefits for the population amounted to approximately 3.8 billion Korean won per year. This quantitative information can be used in cost-benefit analysis of urban development plans.

  • PDF

A Study on Measuring the Efficiency of the Army Supply-Transportation Battalions (육군 보급수송대대 효율성 측정에 관한 연구)

  • Seo, Me-Young;Song, Yong-Il
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.2
    • /
    • pp.85-106
    • /
    • 2010
  • Recently, government is endeavoring for Defense Ministry unit's efficiency improvement according as requires low cost, high effectiveness continuously about public sector. But, by real condition that measuring analysis about logistical corps'(LOG) efficient operation is not, this study was done to present method to estimate efficient management availability of logistical corps(LOG). Presents choosing variable that is suitable in Quartermaster Corps' efficiency estimation for this through existing virtue study investigation, and takes advantage of DEA (Data Envelopment Analysis) technique that divert in public sector efficiency measurement, I wish to present plan for inefficient organization's efficiency improvement after evaluate efficiency to Quartermaster Corps.

Comparative Study of Home Nursing Care Services under the Long-term Care Insurance System in Four Nations (방문간호의 국내외 현황분석 - 한국, 미국, 일본, 독일의 사례를 중심으로 -)

  • Sung, Myung-Sook;Jang, Hee-Jung;Kim, Chun-Gill;Kang, Kyeong-Hwa;Nam, Kyung-A;Park, Jong-Duk
    • Journal of Korean Public Health Nursing
    • /
    • v.24 no.2
    • /
    • pp.211-225
    • /
    • 2010
  • Purpose: This comparative study analyzed information systems including manpower, contents of service, clients, and costs among four nations. Methods: A literature review of relevant publications from Korea, United States, Japan, and Germany supported the use of several plans to activate home nursing care services under the long-term care insurance system in Korea. Results: Korean home nursing care services require quality improvements. The results indicated that a rule is necessary that rations simple visiting service and home nursing care services under the long-term care insurance system, that an integrated management system for elderly care is required, and that the revised delivery of services needs to establish and reflect on various factors to estimate the value in a home visiting nursing care cost system. Conclusion: The data should be valuable in establishment of home nursing care services under the long-term insurance system in Korea.

An Analysis on the Labor Change Factor for Site Selection in Enactment and/or Revision of Construction Standard Production Unit (표준품셈 제·개정에 있어 실사현장 선정을 위한 품 변화요인 분석)

  • Shin, Won-Sang;Kim, Yong-Woo;Lee, Dong-Eun;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.11-12
    • /
    • 2011
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is difficult to reflect the various site attributed variation in productivity using existing CSPU. The reason is that a criteria which site should be selection for enactment and/or revision of CSPU is not established. This study aims to provide essential data to be used for analyzing the labor factors in a way to secure efficiency and reliability of CSPU.

  • PDF