Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.
The purpose of this paper is to purpose methods and procedures by which we can set up technology planning scheme essential for R'||'&'||'D(or technology) planning in public sector (governmental and government-sponsored institutions), and can develop and select "main R'||'&'||'D projects" which are crucial to R'||'&'||'D planning, were quite specifically discussed in case of I'||'&'||'T(Information '||'&'||' Telecommunications) sector, so that they may not remain theoretical but may be practically applicable to real R'||'&'||'D programs. In this paper, the concept of technology planning was defined as a procedure for establishing nominal planning to acquire technologies efficiently for a specific sector. More detailed definition optimal technology-acquisition strategy, i.e., analyzing technological development '||'&'||' environ-ment, establishing R'||'&'||'D objectives as promising technology opportunities, selecting main R'||'&'||'D projects, allocating resources and so on."The"main R'||'&'||'D projects by technology sectors and by planning phases and then deciding on priority. Scoring method was rsed in assessment phase. Summing up, this paper suggested technology planning scheme of methods and procedures for sorting out required technologies, developing and assessing public R'||'&'||'D projects, and finally selecting main R'||'&'||'D projects.
This study is focused on the public developer's role of urban regeneration projects in Japan to derive implications for economy-based-urban regeneration programs by the Special Act on Activation and Support for Urban Regeneration (Urban Regeneration Special Act). 4 case studies; Otemachi 1-1, Shinonome, Shibuya Station and Osiage-Narihirabashi were delivered to review public sectors' roles. Central government, local government and public developer play key roles each step. Urban Regeneration Special Act doesn't set up public sector's role to deliver urban regeneration projects after establishment of master plan. These cases build the governance organization to deliver urban regeneration projects among diverse interest groups including private sectors and landowners. Especially, public developers play a key role as a coordinator and a developer throughout whole urban regeneration projects.
In the era of the 4th Industrial Revolution, the importance of information protection is increasing day by day with the advent of the 'hyper-connection society', and related government financial investment is also increasing. The source of the government's fiscal investment projects is taxpayers' money. Therefore, the government needs to evaluate the effectiveness and feasibility of the project by comparing the public benefits created by the financial investment projects with the costs required for it. At present, preliminary feasibility study system which evaluates the feasibility of government financial investment projects in Korea has been implemented since 1994, but most of them have been actively carried out only in some fields such as large SOC projects. In this study, we discuss the feasibility evaluation of public projects for the purpose of information security. we introduce the case study of the personal information protection program of Korean public institutions and propose a cost-effectiveness analysis method that can be applied to the feasibility study of the information protection field. Finally, we presented the feasibility study and criteria applicable in the field of information security.
International conference on construction engineering and project management
/
2013.01a
/
pp.444-450
/
2013
Public private partnership (PPP) procurement was introduced into Singapore in 2003, and 10 PPP projects was successfully completed and have been in operation. The objective of this study is to identify the critical risk factors and risk allocation preferences for PPP projects in Singapore. To achieve this objective, a comprehensive literature review was carried out and 42 risks were identified and grouped into three meta levels, i.e. macro, meso and micro levels. The questionnaire survey produced 48 completed questionnaires from 48 different contractors. The survey results indicated that 23 risk factors had significantly high criticalities and that four macro-level risks, four meso-level risks and two micro-level risks were among the top 10 risk ranking. "Lack of support from government", "availability of finance" and "construction time delay" were perceived as the top three critical risks. Also, the result implied that micro-level risks had a higher criticality mean score than macro-level and meso-level risks. The findings of this study help both public and private sectors to better understand the risks and their allocation in PPP projects, providing valuable information for organizations that intend to participate in PPP projects in Singapore.
These days, design has been used a very useful means to achieve differentiated urban images and establish the identity of a city, and as an effort to specialize local industries through design, public design projects are competing one another. However, the projects have considerable negative effects because of diverse reasons such as unorganized procedures. For continuous and organized projects which meet demands of the interested persons of public design, reasonable design management should be introduced with a use of design as a strategic means of management Therefore, this study examined the concepts of design management and its meaning in space and analysed cases of implementing components for management of public design projects. It searched for the factors of design management indicating design-oriented management and presented a strategy model which complements design-oriented management. The results of the study are presented as follows: First, strategic implementing components needed for a space design management process were obtained. A design recognition process aimed at what space aims at and needed to identify active components such as physical and indigenous environment. A design inquiry process included problem solution considering characteristics of multi-dimensional space active components, design development considering behavioral functions of humans, checklists needed to complete design and necessary components to institutionalize design. For definition of project space, guideline projects of public design should be progressed in the same context as urban design, and developmental directions of public design needed design inquiry in terms of space to create various experiences in space.
The Journal of the Korea institute of electronic communication sciences
/
v.6
no.5
/
pp.749-756
/
2011
Recently, ever-growing land price has caused public projects to come to considerable deadlocks. Up to date, project principals have relied upon mandatory expropriation policy or other relevant policies in order to procure land sites required for public projects in a short period, but these policies have brought about collective resistances and civil appeals from land owners and cause land compensation price to rise, resulting in delayed progress of public projects. Therefore, land banking system is enforced to resolve these issues. Successful implementation of land banking system requires purchase of sufficient land sites at affordable price so as to execute public projects and control real estate market. However, current version of Land Banking Act reveals several questions as contrary to public expectations in the days of its introduction. This study sought to make further analysis on the whole content of current legal system concerning land banking system. And based on the analysis, this study explored possible solutions for problems that hinder land banking system from its stable operations, so that this land banking system could contribute to resolving land problems by active promotion of public projects as originally intended and by the stabilization of land market based on balance control between supply and demand of land.
The object of this study is to elicit major success factors along with the phases of implementing the BPR in case of public corporations. To obtain the goal of this research, (1) this study reviews and integrates the major previous BPR studies and shows critical success factors of implementing BPR projects coincided with the characteristics of the public organizations. (2) This study has analyzed and arranged the details of BPR projects of public corporations in South Korea through the literature survey, the questionnaire and the interview. (3) This study classifies 40 critical success factors which were identified in existing studies into ones belonging to 3 phases of BPR projects implementation: Introduction Phase, Execution Phase and Stabilization Phase. (4) This study has tested the relation between critical success factors on each stage of BPR projects implementation and the performance variables. It has proven that there is the statistically significant correlation between the success factors and the performance. The findings of this study are thought not only to be useful as a practical guideline in carrying out BPR project Implementation but also to provide significant basis for constructing the theoretical framework of effective BPR project implementation strategy.
This research is an effort to clarify the causes associated with the 'failure' of public housing projects built in the 20th century. Two of the most brutal symbol of failure were selected: the Pruitt-Igoe built in St. Louis, U.S.A. and the Bijlmermeer in the south of Amsterdam, Netherlands. Many critics have attributed the problems of the selected housing projects to architectural failure, and proposed a series of new approaches to architectural design. The claim that many housing projects 'failed' because they were based on an agenda for social reform, derived from the ideas of the CIAM, presupposes that architects were in the position of authority over providing housing for the poor. This research tries to overturn the belief of architectural community which has placed the responsibility for the failure of public housing on designers. The sense of isolation and powerlessness felt by the residents, and the social problems attendant on those feelings, may be reinforced by design but is not caused by Modern Architecture. It should be stressed that the political-economic and social context is more significant than the architectural design for the failure of public housing projects such as the Pruitt-Igoe and the Bijlmermeer.
International conference on construction engineering and project management
/
2011.02a
/
pp.364-367
/
2011
The levels of unemployment and poverty are extremely high and two of South Africa's most pressing problems. There is also a widely acknowledged need for housing and municipal infrastructure (water supply, sewerage, streets, storm water drainage, and electricity, refuse collection). From a theoretical perspective supported by experience elsewhere in Africa, there are reasons for considering that properly formulated employment creation programmes based on the use of labour-intensive methods could be established to construct and maintain the required physical infrastructure, thus creating employment, skills and institutional capacities. Over the past 30 years several projects have been initiated in South Africa to counter unemployment and poverty. Given the socio-economic conditions and political objectives (regarding development, employment creation and alleviation of poverty), it is anticipated that future large-scale construction projects will be proposed by the public sector (National, Provincial and Local Government). The paper will first examine the main tenets of the implementation of development projects through the use of labour-intensive construction and a description of progress elsewhere in Africa and their potential contribution which public works programmes could make to alleviate the poverty and unemployment problems. The research will then analyse the successes and challenges that have been experienced in South Africa in relation to the implementation of development projects over the past 30 years. The paper closes with recommendations and lessons for the future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.