• Title/Summary/Keyword: Public Procurement Service

Search Result 81, Processing Time 0.021 seconds

A Study on the Effects of Government and Electronic Public Procurement on the Private Sector's Technical Inefficiency (정부 및 전자 구매의 기술적 비효율 효과(Technical Inefficiency Effects)분석)

  • Roh, Jae-Whak
    • The Journal of Society for e-Business Studies
    • /
    • v.16 no.2
    • /
    • pp.111-127
    • /
    • 2011
  • The aim of this study is to reveal the effects of government and public electronic procurement on the private sector's productivity and technical inefficiency. Three cases are analyzed. The first scenario is that the government just appears as a new consumer to enterprises. Simply participating as a new consumer to enterprises reveals that government does not contribute to the private sector's productivity or improve technical efficiency. The second case is one where the government publicly procures the private sector's service or goods using IT technologies. It is revealed that government contribute to improve the private sector's productivity and reduce inefficiency. The last case is where the government demands business to connect to governments using new IT technologies. The government demands to adopt the IT technology for connection results in improved productivity and efficiencies in the private sectors.

A study on the regulation of durability standard of underground structures monitoring sensors (지하구조물 계측센서의 내구연한 기준에 대한 규정 분석 연구)

  • Woo, Jong-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.73-81
    • /
    • 2018
  • The purpose of this study is to research the regulation of durability standard of underground structures monitoring sensors. The durability criteria for construction monitoring sensors of domestic construction companies, the standard years of contents such as buildings on the income tax implementation regulations, and the standards of the Public Procurement Service for construction monitoring and construction machinery were analyzed. The durability criterion on products such as the inclination meter and the strain gauge, which are purchased from the Public Procurement Service prior to installation on the underground structure, is 8 to 10 years. It is considered that the monitoring sensor installed in the paperboard and the concrete structure at the time of construction will have considerably shortened service life rather than the useful life of the product itself due to various adverse factors such as groundwater influence and compaction.

A Study on the Performance Evaluation of G2B Procurement Process Innovation by Using MAS: Korea G2B KONEPS Case (멀티에이전트시스템(MAS)을 이용한 G2B 조달 프로세스 혁신의 효과평가에 관한 연구 : 나라장터 G2B사례)

  • Seo, Won-Jun;Lee, Dae-Cheor;Lim, Gyoo-Gun
    • Journal of Intelligence and Information Systems
    • /
    • v.18 no.2
    • /
    • pp.157-175
    • /
    • 2012
  • It is difficult to evaluate the performance of process innovation of e-procurement which has large scale and complex processes. The existing evaluation methods for measuring the effects of process innovation have been mainly done with statistically quantitative methods by analyzing operational data or with qualitative methods by conducting surveys and interviews. However, these methods have some limitations to evaluate the effects because the performance evaluation of e-procurement process innovation should consider the interactions among participants who are active either directly or indirectly through the processes. This study considers the e-procurement process as a complex system and develops a simulation model based on MAS(Multi-Agent System) to evaluate the effects of e-procurement process innovation. Multi-agent based simulation allows observing interaction patterns of objects in virtual world through relationship among objects and their behavioral mechanism. Agent-based simulation is suitable especially for complex business problems. In this study, we used Netlogo Version 4.1.3 as a MAS simulation tool which was developed in Northwestern University. To do this, we developed a interaction model of agents in MAS environment. We defined process agents and task agents, and assigned their behavioral characteristics. The developed simulation model was applied to G2B system (KONEPS: Korea ON-line E-Procurement System) of Public Procurement Service (PPS) in Korea and used to evaluate the innovation effects of the G2B system. KONEPS is a successfully established e-procurement system started in the year 2002. KONEPS is a representative e-Procurement system which integrates characteristics of e-commerce into government for business procurement activities. KONEPS deserves the international recognition considering the annual transaction volume of 56 billion dollars, daily exchanges of electronic documents, users consisted of 121,000 suppliers and 37,000 public organizations, and the 4.5 billion dollars of cost saving. For the simulation, we analyzed the e-procurement of process of KONEPS into eight sub processes such as 'process 1: search products and acquisition of proposal', 'process 2 : review the methods of contracts and item features', 'process 3 : a notice of bid', 'process 4 : registration and confirmation of qualification', 'process 5 : bidding', 'process 6 : a screening test', 'process 7 : contracts', and 'process 8 : invoice and payment'. For the parameter settings of the agents behavior, we collected some data from the transactional database of PPS and some information by conducting a survey. The used data for the simulation are 'participants (government organizations, local government organizations and public institutions)', 'the number of bidding per year', 'the number of total contracts', 'the number of shopping mall transactions', 'the rate of contracts between bidding and shopping mall', 'the successful bidding ratio', and the estimated time for each process. The comparison was done for the difference of time consumption between 'before the innovation (As-was)' and 'after the innovation (As-is).' The results showed that there were productivity improvements in every eight sub processes. The decrease ratio of 'average number of task processing' was 92.7% and the decrease ratio of 'average time of task processing' was 95.4% in entire processes when we use G2B system comparing to the conventional method. Also, this study found that the process innovation effect will be enhanced if the task process related to the 'contract' can be improved. This study shows the usability and possibility of using MAS in process innovation evaluation and its modeling.

A Study on Factors Determining the Quality of Service with Information Systems-Comparison of Two Research Models (정보시스템 기반 서비스의 품질을 결정하는 요인에 관한 연구-두 모형의 비교)

  • Kim, Chong-Su
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.145-151
    • /
    • 2011
  • In the information system service sectors, it is crucial to measure the quality of service. Especially factors determining the quality of service should be identified. For that purpose, in this study, the factors of two research models-SERVQUAL and TAM-are compared, analyzed and tested with data of public procurement system service. The result shows that the factors identified include reliability and assurance of SERVQUAL and perceived usefulness and perceived ease-of-use of TAM. Also, it is observed that the two models sufficiently explain the variance of satisfaction. This study may help improve the quality of information system service.

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service (조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.3-11
    • /
    • 2021
  • The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.

An Analytical Study on the Durability Standard of Ground Structures Monitoring Sensors (지반구조물 계측센서의 내구연한 기준에 대한 분석적 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.53-59
    • /
    • 2021
  • Purpose & Method: The purpose of this study is the theoretical study on the durability standard of ground structures monitoring sensors. A survey on the durability criteria for construction monitoring sensors of domestic construction companies and the income tax implementation regulations, the standard years of contents such as buildings and the standards of the Public Procurement Service for construction monitoring and construction machinery were analyzed. Result: The durability criterion such as the inclination meter and the strain gauge, which are purchased from the Public Procurement Service prior to installation on the ground structure, is 8 to 10 years. Conclusion: The actual durability analysis by comparing the reliability of various monitoring sensors installed in dams at home and abroad, As a result of comprehensive study on the loss and damage rate of the maintenance monitoring sensor installed in the tunnel, the proper durability period of the built-in type monitoring sensor such as domestic pore pressure meter and earth pressure meter installed in the structure or the ground is 5 to 8 years it seems reasonable.

An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014 (공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 -)

  • Jung, Wooyoung;Lee, Taewon;Rhee, Pung-wook;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.89-97
    • /
    • 2015
  • This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.

External Factors Influencing Bid/No-Bid Decision for Supervision Consultant Service: A Case of Construction Project in Hanoi

  • HA, Son Tung;TRAN, Manh Linh;HOANG, Huy Viet;TRAN, Van Hung
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.6
    • /
    • pp.417-425
    • /
    • 2020
  • This paper investigates the potential impact of external factors on bid/no-bid decision for supervision consultant service on construction project in Hanoi, the capital of Vietnam. The data used in this study are secondary data taken from annual reports and sourced from the Department of Public Procurement, Ministry of Planning and Investment in Hanoi. Besides, to identify the impact of external factors on bid/no-bid decision for supervision consultant service on construction project in Hanoi, the study collected data from 272 qualified questionnaires from bidders doing business in Hanoi. Cronbach's Alpha, EFA and regression model are used to explore the impact of each independent variable on bid/no-bid decision for supervision consultant service on construction project. The results show that three external determinants, including Project characteristic (PC), Legal codes (LC) and Competition (C) are affecting bid/no-bid decision for supervision consultant service on construction project in Hanoi. Among them, Project characteristic (PC) and Legal codes (LC) have positive relationships with bid/no-bid decision for supervision consultant service on construction project, whereas Competition (C) negatively affects bid/no-bid decision for supervision consultant service on construction project. It means the more contractors actually participate in a bid, the less bid/ no-bid decisions are made.

A study on the state of customized visiting oral health programs (맞춤형 방문구강보건사업 현황조사)

  • Jung, Jae-Yeon
    • Journal of Korean society of Dental Hygiene
    • /
    • v.9 no.4
    • /
    • pp.606-619
    • /
    • 2009
  • Objectives : This study was to examine the state of customized visiting oral health programs in a bid to help facilitate the unified operation of the programs and the development of required guidelines. Methods : The subjects in this study were 49 dental hygienists who were professionals responsible for customized visiting health care programs across the nation. Results : 1. Regarding the form of employment of the dental hygienists were investigated many contract and daily workers. 2. As to the possession of equipment necessary for visiting oral health programs, denture cleaners(12.2%) were most widely possessed in some regions, followed by mobile scalers(10.2%) and mobile suctions(8.2%). In terms of expendable devices and materials, dental mirrors, pincettes and explorers were the most widely possessed dental checkup devices, and the most widely possessed oral hygiene supplies were toothbrushes, interdental brushes and denture cleaners. Those devices and materials were in more possession than the other types of devices and materials. The most widely possessed equipment for educational purpose was laptop computers, followed by beam projectors and screens. The most widely possessed teaching materials were dentiform, followed by CD-ROMs. 3. Those whom they visited the most for oral health care service were elderly people, followed by the disabled and patients with chronic diseases. The dental hygienists who went out to visit those people outnumbered the others who stayed at public health centers. Concerning the types of visiting oral health care service, the most prevalent service provided to the elderly included denture cleaning/management, oral massage and preventive treatment against dental caries. The most dominant service provided to the disabled involved education of the oral health care act, preventive treatment against dental caries and toothbrushing by professionals. The most common service offered to patients with chronic diseases was education of the oral health care act and oral health education. The dental hygienists paid a visit to a mean of 5.8 households a day. The average weekly number of households cared by the dental hygienists was 27.3. It took a mean of 37.1 minutes for them to take care of each household. 4. As for satisfaction level with the implementation of the visiting oral health programs, they expressed the greatest satisfaction at teamwork with professionals($3.56{\pm}0.94$), followed by the professionalism of their work($3.21{\pm}0.94$) and workload($3.08{\pm}0.94$). Their satisfaction level with the work conditions required for creative job performance($2.75{\pm}0.98$) and partnership with other institutions($2.64{\pm}1.03$) was below 3.0. In regard to the impact of their characteristics, marital status made a statistically significant difference to satisfaction level with workload. The unmarried dental hygienists were more pleased with their workload than the married ones(p<0.05). 5. As to needs for education for professionalism improvement, they asked for education about visiting oral health care skills the most, followed by education about oral health care for patients with chronic diseases, education of planning/evaluation and education of oral health care for the disabled. Conclusions : The top priority for the vitalization of the programs was the procurement of budget, followed by the procurement of equipment and educational media and the procurement of human resources.

  • PDF

Cost Estimating Method of Public Building Construction through Construction Scale (공사규모에 따른 공공건축물 공사비의 산정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.307-316
    • /
    • 2015
  • As there are a lot of differences in the public building construction cost depending on the construction scale of actual construction cost system, a lot of problems occur in the estimation of the cost. So, the development of a predictive model depending on the construction scale shall be used in a way that it is applied to the case selectively and differently. This study drew a cost estimating model through a regression analysis. For this, 42 construction sites which were ordered during 2011 to 2012 by Public Procurement Service data were selected as a historical data. Based on the application of the model to new construction and the verification of its effect, the reasonable model for estimating the construction cost has been suggested.