• Title/Summary/Keyword: Public Procurement

Search Result 186, Processing Time 0.026 seconds

Global Convergence for Healthcare ICT Services (헬스케어 ICT 서비스의 글로벌 컨버전스)

  • Won, Dal Soo;Lee, Sang San;Jung, Yong Gyu
    • The Journal of the Convergence on Culture Technology
    • /
    • v.2 no.2
    • /
    • pp.45-49
    • /
    • 2016
  • It may be summarized to four kinds of innovation through global convergence, and the convergence of adjacent areas according to mega-trends in medical services market and actively introduced ICT technologies, public and private partnership. Health care is no longer a local industry, it is becoming Global Convergence. In the case of developed countries, it is increased to income levels, the development of new medical technologies, while the increase in specialized medical services and need of aging population. It increases migration of foreign medical personnel, geographical proximity and choice of the best medical technology, regardless of the cost. The increasing demand for high quality yet relatively low foreign prices of medical services. Hospitals are especially spread of international certification such as the US JCI standards. Hospital exports are being evaluated and opened the way for the export industrialization as ICT convergence hospital that can be exported to the fusion-related technologies more efficiently. Current local hospital has already reached saturation, globalization of Korean hospital is being the time necessary. Thus, unlike a strategy for each country, as well as technology transfer it is also possible, such as total exports provided the building, medical equipment procurement, local medical personnel (doctors and nurses) selection and training, PR and marketing. In the current medical law and need to be revised prospectively maintained for publicity and abroad, there is a need for further legal dragons and actively support a more flexible policy on the application of national law overseas medical services.

Collaborative Disaster Governance Recognized by Nurses during a Pandemic (코로나19 대응 간호사가 인식하는 협력적 재난 거버넌스)

  • Rim, Dahae;Shin, Hyunsook;Jeon, Hyejin;Kim, Jieun;Chun, Hyojin;Oh, Hee;Shon, Soonyoung;Shim, Kaka;Kim, Kyung Mi
    • Journal of Korean Academy of Nursing
    • /
    • v.51 no.6
    • /
    • pp.703-719
    • /
    • 2021
  • Purpose: We aimed to identify collaborative disaster governance through the demand and supply analysis of resources recognized by nurses during the COVID-19 pandemic. Methods: We used a descriptive study design with an online survey technique for data collection. The survey questions were developed based on focus group interviews with nurses responding to COVID-19 and expert validity testing. A 42-question online survey focusing on disaster governance was sent to nurses working in COVID-19 designated hospitals, public health offices, and schools. A total of 630 nurses participated in the survey. Demand and supply analysis was used to identify the specific components of disaster governance during a pandemic situation and analyze priority areas in disaster governance, as reported by nurses. Results: Demand and supply analysis showed that supplies procurement, cooperation, education, and environment factors clustered in the high demand and supply quadrant while labor condition, advocacy, emotional support, and workload adjustment factors clustered in the high demand but low supply quadrant, indicating a strong need in those areas of disaster governance among nurses. The nurses practicing at the public health offices and schools showed major components of disaster governance plotted in the second quadrant, indicating weak collaborative disaster governance. Conclusion: These findings show that there is an unbalanced distribution among nurses, resulting in major challenges in collaborative disaster governance during COVID-19. In the future and current pandemic, collaborative disaster governance, through improved distribution, will be useful for helping nurses to access more required resources and achieve effective pandemic response.

A Study on the Role of Local Governments in the Era of Generative Artificial Intelligence: Based on Case Studies in Gyeonggi-do Province, Seoul City, and New York City (생성형 인공지능 시대 지방정부의 역할에 대한 연구: 경기도, 서울시, 뉴욕시 사례연구를 바탕으로)

  • S. J. Lee;J. B. Kim
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.3
    • /
    • pp.809-818
    • /
    • 2024
  • This paper proposes an action plan for local governments to safely utilize artificial intelligence technology in various local government policies. The proposed method analyzes cases of application of artificial intelligence-related laws and policies in Gyeonggi Province, Seoul City, and New York City, and then presents matters that local governments should consider when utilizing AI technology in their policies. This paper applies the AILocalism-Korea analysis methodology, which is a modified version of the AILocalsm analysis methodology[1] presented by TheGovLab at New York University. AILocalism-Korea is an analysis methodology created to analyze the current activities of each local government in the fields of legal system, public procurement, mutual cooperation, and citizen participation, and to suggest practical alternatives in each area. In this paper, we use this analysis methodology to present 9 action plans that local governments should take based on safe and reliable use of artificial intelligence. By utilizing various AI technologies through the proposed plan in local government policies, it will be possible to realize reliable public services.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Proposal for the Hourglass-based Public Adoption-Linked National R&D Project Performance Evaluation Framework (Hourglass 기반 공공도입연계형 국가연구개발사업 성과평가 프레임워크 제안: 빅데이터 기반 인공지능 도시계획 기술개발 사업 사례를 바탕으로)

  • SeungHa Lee;Daehwan Kim;Kwang Sik Jeong;Keon Chul Park
    • Journal of Internet Computing and Services
    • /
    • v.24 no.6
    • /
    • pp.31-39
    • /
    • 2023
  • The purpose of this study is to propose a scientific performance evaluation framework for measuring and managing the overall outcome of complex types of projects that are linked to public demand-based commercialization, such as information system projects and public procurement, in integrated national R&D projects. In the case of integrated national R&D projects that involve multiple research institutes to form a single final product, and in the case of demand-based demonstration and commercialization of the project results, the existing evaluation system that evaluates performance based on the short-term outputs of the detailed tasks comprising the R&D project has limitations in evaluating the mid- and long-term effects and practicality of the integrated research products. (Moreover, as the paradigm of national R&D projects is changing to a mission-oriented one that emphasizes efficiency, there is a need to change the performance evaluation of national R&D projects to focus on the effectiveness and practicality of the results.) In this study, we propose a performance evaluation framework from a structural perspective to evaluate the completeness of each national R&D project from a practical perspective, such as its effectiveness, beyond simple short-term output, by utilizing the Hourglass model. In particular, it presents an integrated performance evaluation framework that links the top-down and bottom-up approaches leading to Tool-System-Service-Effect according to the structure of R&D projects. By applying the proposed detailed evaluation indicators and performance evaluation frame to actual national R&D projects, the validity of the indicators and the effectiveness of the proposed performance evaluation frame were verified, and these results are expected to provide academic, policy, and industrial implications for the performance evaluation system of national R&D projects that emphasize efficiency in the future.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Development of an Verification System for Enhancing BIM Design Base on Usability (활용성을 고려한 BIM 설계 오류 검증시스템 개발)

  • Yang, Dong-Suk
    • Land and Housing Review
    • /
    • v.8 no.1
    • /
    • pp.23-29
    • /
    • 2017
  • The BIM design is expected to expand to the domestic and overseas construction industries, depending on the effect of construction productivity and quality improvement. However, with the obligation of Public Procurement Service to design the BIM design, it includes a design error and the problem of utilization of 3D design by choosing a simple 2D to 3D remodelling method that can not be modelled in 3D modeling or use of the construction and maintenance phases. The results reviewed by BIM design results were largely underutilized and were not even performed with the verification of the error. In order to resolve this, one must develop the check system that secures the quality of BIM design and ensure that the reliability of BIM results are available. In this study, it is designed to develop a program that can automatically verify the design of the BIM design results such as violation of the rules of the BIM design, design flaws, and improve the usability of the BIM design. In particular, this programs were developed not only to identify programmes that were not commercially available, but also to validate drawings in low-light computer environments. The developed program(LH-BIM) store the information of attribute extracted from the Revit file(ArchiCAD, IFC file included) in the integrated DB. This provides the ability to freely lookup the features and properties of drawings delivered exclusively by the LH-BIM Program without using the Revit tools. By doing so, it was possible to resolve the difficulties of using traditional commercial programs and to ensure that they operate only with traditional PC performance. Further, the results of the various BIM software can be readily validated, which can be solved the conversion process error of IFC in the case of SMC. Additionally, the developed program has the ability to automatically check the error and design criteria of the drawings, as well as the ability to calculate the area estimation. These functions allow businesses to apply simple and easy tasks to operate tasks of BIM modelling. The developed system(LH-BIM) carried out a verification test by reviewing the review of the BIM Design model of the Korea Land & Housing Corporation. It is hoped that the verification system will not only be able to achieve the Quality of BIM design, but also contribute to the expansion of BIM and future construction BIM.

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF