• 제목/요약/키워드: Public Land Development

Search Result 454, Processing Time 0.028 seconds

A Research on the Development of Management Process System of Public Ordering Service Results and Estimation (건설기술용역 실적 관리 프로세스 시스템 개발에 대한 연구)

  • Lee, Kyu-Sung;Lee, Han-kyu;Kim, Nam-Gon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.168-169
    • /
    • 2014
  • Construction Technology Service is currently hardly managed due to failure to offer standard management system of service performance, company performance, and business evaluation in every Ordering Agencies. After Construction Technology Promotion Act is enforced in May 2014, Ordering Agency obligates them to report to Minister of Land and Transportation within 10 days upon contract/ amendment/ completion. In 2013, in advance to enforcement of this law, performance management system for construction technology service was developed for a test run. However this system only applies to main contractors while management and operation of subcontractors are unavailable that causes problems on connection and integration with Experience Management Trustee. Therefore, this research will establish systematic foundation that enables real-time information of service performance and evaluation of subcontractors to result standardization of performance and evaluation for public ordered services.

  • PDF

A development of indicators for public construction technology policy evaluation (공공건설기술 정책평가를 위한 지표 개발에 관한 연구)

  • Lee, Du-Heon;Lee, Kyo-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.191-193
    • /
    • 2011
  • The government has performed various countermeasures and policies for the efficiency of Construction Industry. However the analysis of the policy performance is not satisfied. In the study we benchmarked the construction performance evaluation system and indicators which was performed by advanced countries like the United States and the United Kingdom. So we suggested indicators for measuring performance of public construction cost saving strategy performed in 2008 by the Ministry of Land, Transport and Maritime Affairs. This paper will provide the basis for establishing future construction policies or plans.

  • PDF

Development of Dynamo Algorithm Based on BIM for Direct Sunlight Impact Analysis of Tunnel Outlet (BIM 기반 터널 출구부 직광영향검토 Dynamo 알고리즘 개발)

  • Kwon, Bareum;Yeom, Chunho
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.41-51
    • /
    • 2022
  • BIM was introduced under the leadership of public institutions, and projects such as road, railway, and site creation, including BIM tasks, are currently being ordered. In addition, as the Ministry of Land, Infrastructure and Transport(MOLIT) is pushing for the full design of BIM, public institutions under its jurisdiction are also pushing for the full design of BIM. Full design of BIM means that all designs are done with BIM. Public institutions' BIM guidelines only require BIM deliverables, and there is a limited direction for the BIM design process to respond to traditional design approaches. Therefore, it is necessary to develop a BIM-based design process corresponding to the full design of BIM.

A Study on the Mixed Implementation Method of Management Disposition and Cost Settlement by Public Participation in Urban Renewal Type Redevelopment Projects (도시정비형 재개발사업에서 공공참여에 의한 관리처분 및 원가정산 혼용 시행방식에 관한 고찰)

  • Moon, Myung-Yeol;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.254-255
    • /
    • 2021
  • The urban renewal type redevelopment project is a project to improve the urban environment for the recovery of urban functions and revitalization of commercial districts in commercial and industrial areas. Urban regeneration projects are not progressing smoothly. The urban renewal type is not so for landowners, who require a high level of professional knowledge and experience to carry out smooth projects. In addition, the core part of business conflicts can be seen as the problem of management and disposal methods. Therefore, as landowners, etc. become the actual subjects, the public will take charge of project execution, but all development gains and losses will be attributed to the owner of the land, etc.

  • PDF

Integrated Simulation System of GIS and ANN for Land Price Appraisal (GIS 기반 지가산정 및 시뮬레이션 시스템)

  • Moon, Tae-Heon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.3 no.2
    • /
    • pp.1-10
    • /
    • 2000
  • The purpose of this study is to develope a parcel-based automatic simulation system of land price through the integration of urban mathematical model and GIS. The appraisal process of public land price by the local government is simple but is a great time-consuming task. Moreover, it doesn't provide any statistical analysis and spatial presentation tools. So, it is difficult for planners or administrative officials to analyze the variation of land price with spatial idea. From these, a system is developed combining two sub-systems, they are ANN(Artificial Neural Network) for the calculation of land price and GIS for visual presentation. Using Matlab application, ANN model was designed having 3-layer structure and was trained with the sample data taken from Chinju city. With the trained network, the impact of 'road', 'parks', 'height control district' and 'beauty district' on land price in 9 regions(dong) are simulated. The results of the simulation were visualized with ArcView GIS. The automatic simulation system operated through the DDE(Dynamic Data Exchange) conversation between two applications. ArcView was set as client and Matlab as server. Scripting in ArcView and customizing a window of ArcView, this system can execute the whole process of simulation by just clicking a button with mouse. As a conclusion, this system was proved to be an effective and easily controllable planning support system for the land price simulation.

  • PDF

Mega Project Technique Support : A Case Study of Urban Development and Urban Expand

  • Pricharchon, Ekkarat;Polngam, Supapis
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.1000-1001
    • /
    • 2003
  • Like other major cities in the world, Bangkok and some other cities in Thailand are expanding rapidly. The Office of Transports and Traffic Policy and Planning had selected three cities for a study of urban change; namely, Bangkok Metropolis and vicinity ( including Nontha buri, Samut Prakan , Prathum Thani, Samut Sakhon and Nakhon Pathom), Chiang Mai and Nakhon Nayok. The main objective of the study is to monitor urban development and urban extension as well as the change of landuse from farm land to urban area during two periods by using available satellite data. LANDSAT-5 TM and SPOT-HRV panchromatic were used for the first period and LANDSAT-7 ETM+ and IRS-lD panchromatic were used for the second period with a lapsed time of 14 years. I was found that during this period Bangkok Metropolis and vicinity extended 1,222 square kilometer; Chiang Mai 68.3 square kilometer, Nakhon Nayok 5.97 square kilometer. Most landuse categories which had been changed to urban were rice paddy and mixed orchard. Some suggestion for sound urban development based on satellite data was also included.

  • PDF

The Outline of Han River Basin Environmental master Plan Project (한강유역 환경보전 종합계획 사업의 개요)

  • 이선환
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.1
    • /
    • pp.46-50
    • /
    • 1982
  • Following rapid industrial development and urbanization in Korea, there is a need for the Government to implement effective control of pollution and to undertake specific schemes in areas where pollution of the environment is severe. In response to this need, Government of Korea prepare Han River Basin Environmental Master Plan Project for water, air, solid waste to cover environmental protection of the Han River Basin. The Project area is approximately 27,000 sq. Km extending over Seoul, Kyunggi, Kwangwon, Chungbuk Province. The total population of Master Plan Project area is approximately 11.6 million, or one-third of the total population of Korea. There are about 8,000 industries, including those located in 16 industrial complexes, in the project area. The scope of work and terms of reference are the following: (1) A Summary of existing land use and forecasts for changes in land use by the year 2,000. (2) Emission inventories for air, waste water, and solid wastes. (3) Forecasts of future population growth patterns and pollution loadings. (4) Identification of specific projects needs to reduce pollution levels and satisfy the environmental quality standards. (5) A Program of enforcement to include (i) self monitoring, and (ii) governmental inspections and surveillance. (6) A program for quality improvement and quality assurance of environmental measurements. (7) Reports summarizing all data collected analyzed during the study. (8) Conceptual design and feasibility studies, including cost estimates, for needed pollution control projects. (9) A financial plan for future detailed design and construction of public facilities, for financial incentives to industry, and for user charges for industrial use of public treatment of disposal works.

  • PDF

Green and Healthy Living in a High-rise, High Density Urban Environment: The Hong Kong Housing Authority's Experience

  • Fung, Ada Y.S.
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.131-136
    • /
    • 2014
  • The Hong Kong Housing Authority (HKHA) develops and implements a public housing programme to meet the housing needs of people who cannot afford private rental housing. The HKHA has an existing stock of about 740,000 public rental flats (PRH). According to the 2014 Policy Address, the Government aims to provide an average of about 20,000 PRH units and about 8,000 Home Ownership Scheme (HOS) units per year. We care for the environment. In developing new housing estates, we conduct thorough environmental studies such as microclimate studies and air ventilation assessment, and use passive design to harness the natural characteristics of our sites. We employ environment-friendly design and construction methods, using modular flat design, pre-cast and pre-fabricated construction techniques as well as recycled, green construction materials. We conduct Carbon Emission Estimation for all our projects, conserve the use of natural resources and reduce wastes throughout the life cycle of buildings. We care for people. We adopt the principles of Universal Design and Barrier Free Access for the convenience and welfare of people of all ages and abilities. We carry out Community Engagement to collect stakeholders' views and aspirations, and incorporate them in the design of our projects. We also carry out surveys of residents' views after the occupation of new estates to gauge our success and identify areas for improvement.

Paris Rive Gauche Project: (Re)developping the City on the City

  • Ernek, Benoit
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.123-129
    • /
    • 2014
  • Paris hasn't experienced such excitement since the huge changes brought about by Baron Haussmann in the 19th century. Paris Rive Gauche project, started in 1991, is the largest urban project in city ever since, it represents about 1% of Paris territory. It takes place on a workshops, factories and warehouses area that prospered along the Seine river and the railways in the 19th century. Originally planned as a business quarter, Paris Rive Gauche, developed by SEMAPA for the City of Paris, fosters urban diversity through housing, offices, public facilities, shops, creating a stimulating neighbourhood where 18,000 residents, 30,000 students as well as 60,000 employees will soon croth paths. This project's main principles are urban and social diversity, deployment of public facilites, the development of new university campus inside the city, promotion of industrial patrimony and connecting the old 13th distict to the river and the opposite side. Half of the project is going to be built on a concrete slab that covers the railway tracks which is one of the major performances of this long-term project. This concrete slab represents the new level of the City, about 6 to 8 meters above the railway tracks. We distinguish three families of buildings on the cover : Classic buildings; Bridges buildings and Connection buildings, these last guarantee the linkage between old and new level of the City.

Housing and Welfare in Western Europe: Transformations and Challenges for the Social Rented Sector

  • Ronald, Richard
    • Land and Housing Review
    • /
    • v.4 no.1
    • /
    • pp.1-13
    • /
    • 2013
  • In the post-war period, the mass provision of social rental housing units represented the primary means for resolving housing welfare issues across much of Western Europe. In contrast to North America, large swathes of state subsidized rental housing where built and let-out at submarket rents, both to needy as well as regular working households. By the 1980s social housing accounted for as many as four in ten homes in some contexts. Since then however, these important welfare sectors have been under attack. On the one hand, privatization policies have continued to undermine the basis of social renting with home ownership and private rental sectors advanced by policy as preferable alternatives. On the other hand, social housing providers have been restructured in order to play a more residual role in the housing market and serve more targeted groups of socially vulnerable people. This paper assesses key differences in the development of West European social housing sectors as well as recent transformations in their status that represent a challenge their sustainability. It also looks to what insights this provides for the South Korean housing context where public housing has proliferated and been increasingly diversified in recent years.