• 제목/요약/키워드: Public Design Project

검색결과 409건 처리시간 0.02초

공공디자인 개선사업의 추진실태 분석에 관한 연구 - 대구시 동성로 공공디자인 개선사업을 중심으로 - (A Study on the Analysis of Project Implementations at Public Design - Improving Project for Public Design in Daegu, Dongseong Street -)

  • 이종국
    • 한국주거학회논문집
    • /
    • 제25권6호
    • /
    • pp.67-74
    • /
    • 2014
  • Dongseong-ro public design was reformed for a short time to be short of connection and riffle effect of another project and to have limitation on long term and integrated development, so that systematic plan from beginning of the project was needed to produce synergy effects. The purpose of the study was to investigate reformation of Dongseong-ro public design and to check on existing development project again and to take actions against future projects in advance and to reexamine and make long term plan from point of view of development of downtown. This study investigated reformation of Dongseong-ro public design of Junggucheong office of Daegu that was done from May 2007 to December 2010. The study consisted of purpose of the project, scope, time, the committee of promotion, questionnaire survey, residents' participation and follow up to suggest reformation based on questionnaire survey. This study had limitation of investigation into internal materials of 'Dongseong-ro public design reformation's master planning service' of Junggucheong office of Daegu. Further studies were needed to investigate empirically.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

공공프로젝트 친환경 설계지침의 변화에 따른 건축설계프로세스 연구 (Architectural Design Process by the Changes of Sustainable Design Guidelines of Public Project)

  • 태영란
    • 한국태양에너지학회 논문집
    • /
    • 제30권4호
    • /
    • pp.63-70
    • /
    • 2010
  • This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.

서비스 디자인 방법론을 활용한 지역 활성화 전략 연구 - 청양군 간판개선사업 중앙로 일대를 중심으로 (A Study on the Development of Public Design Strategy Based on the Service Design Methodology -Focus on Signboard renovation Business Jungangro, Chung-yang)

  • 정용진;김소연
    • 한국콘텐츠학회논문지
    • /
    • 제22권3호
    • /
    • pp.380-389
    • /
    • 2022
  • 서비스 디자인이란 사용자의 서비스 경험을 디자인하는 활동 및 이를 전문적으로 실행하는 디자인 영역을 의미한다. 과거 공급자 위주의 정책 결정에서 벗어나 국민 관점의 서비스를 설계하기 위해 최근 서비스디자인 방법론을 활용한 국민 참여 사업 모델이 늘어나고 있다. 특히 행정안전부는 정책 과정 전반에서 국민 관점의 서비스를 설계하기 위해 2014년에 '국민디자인단'을 구성하였다. 정책 수요자인 국민, 서비스디자이너와 공급자인 공무원이 정책과정 전반에 함께 참여하여 서비스디자인 기법을 통해 공공서비스를 개발, 발전시키는 국민참여형 정책모형을 운영하고 있다. 본 연구는 서비스디자인 방법론을 활용한 지역 활성화 전략 수립을 목표로, 국민디자인단 간판개선사업으로 진행된 사례를 통해 실질적인 사업대상지의 발전적 방향성을 제시하였다는 것에 의의가 있다. 단, 본 연구는 현재 진행되고 있는 사업에 관한 내용으로 향후 사업대상지 적용에 대한 검증 및 사용자 만족도 평가 등이 이루어지지 않은 만큼, 향후 사업이 종료되면 수요자를 대상으로 사업 만족도를 파악할 필요가 있다.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

공공디자인사업 수행 프로세스 현황연구 (The Current Conditions of the Operational Process of Public Design Project)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제22권6호
    • /
    • pp.173-180
    • /
    • 2013
  • As a way to raise the brand value of each area and activate local industries, public design projects have been competitively made. Meanwhile, public design has the characteristics of having an uncertain number of users, people with different interests, and management of the design by an administrative organization. Such characteristics may be obstacles to the results of public design and finally can cause many problems in a project's results. However, although most local governments have executed public design projects, systematic research for them and organized execution of the projects has been insufficient. For successful realization, proper organization, and consistent public design, research on a strategic design process is needed. Therefore, this study investigated the current status of public design projects to understand problems in the design process and solve them. The results are presented as follows: First, the design process for public spaces has a dual structure including a specialized process of design development in its execution and management and the execution process in the planning state is unsatisfactory and the process of designer selection is not consistent. Second, as a result of investigating the current status of the design process for public spaces, it was deduced that as most of the projects have been subjectively and temporarily managed by wholly charged organizations without specialized consultation or investigation with different related departments, there have been diverse problems in securing design quality. Third, as a result of analysing the specific execution processes carefully, it was suggested that problems in the process can be solved by decisions through consultation and discussion. As well supportive consultation systems should be used actively.

공공화장실 "Between you and me" 의 작업논리와 메타디자인적 성격에 대한 연구 (A Study on the Logics and the Meta-design of a Public Restroom "Between you & me")

  • 오창섭
    • 한국실내디자인학회논문집
    • /
    • 제13권3호
    • /
    • pp.93-103
    • /
    • 2004
  • This thesis aims to show the design logics and the meta-design of a public restroom "Between You and Me." This work reinterprets a public restroom regarded as the typical public space by means of spatial agency's influences, on the assumption thor spatial agency controls the properties of public space. This thesis examines our representational system against the public space, and our specific experience in it with the conceptual model of meta-design. Meta-design is a design beyond the design usually we think of. Experiential meta-design, "Between You and Me" presented as the object of this thesis, is a constructive design project which converts our negative perception of the restroom to a new one, "interface." This project, composed of the surrealistic spatial arrangement, urges us to reconsider our fixed thoughts of the restroom and try a creative experience in it. Finally this thesis shows how the space's way of existence fixes our acts and thoughts, and what enables the repetitive acts and thoughts often emerged In our relations with the public space through a meta-design.c space through a meta-design.

공공디자인사업 수행 프로세스의 구조적 특성에 관한 연구 (The Structural Characteristics of Work Processes in Public Design Projects)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제22권3호
    • /
    • pp.145-153
    • /
    • 2013
  • Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.

프로세스 기반의 협업 프로젝트 관리 시스템 구조 설계 (Design of Architecture for Collaborative Project Management System based on Business Process)

  • 백재용;정소영;김보현;유석규;이석우;최헌종
    • 한국CDE학회논문집
    • /
    • 제14권5호
    • /
    • pp.338-345
    • /
    • 2009
  • c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.