Dongseong-ro public design was reformed for a short time to be short of connection and riffle effect of another project and to have limitation on long term and integrated development, so that systematic plan from beginning of the project was needed to produce synergy effects. The purpose of the study was to investigate reformation of Dongseong-ro public design and to check on existing development project again and to take actions against future projects in advance and to reexamine and make long term plan from point of view of development of downtown. This study investigated reformation of Dongseong-ro public design of Junggucheong office of Daegu that was done from May 2007 to December 2010. The study consisted of purpose of the project, scope, time, the committee of promotion, questionnaire survey, residents' participation and follow up to suggest reformation based on questionnaire survey. This study had limitation of investigation into internal materials of 'Dongseong-ro public design reformation's master planning service' of Junggucheong office of Daegu. Further studies were needed to investigate empirically.
Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
국제학술발표논문집
/
The 9th International Conference on Construction Engineering and Project Management
/
pp.25-32
/
2022
As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.
The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
/
pp.153-158
/
2017
Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.
This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.
서비스 디자인이란 사용자의 서비스 경험을 디자인하는 활동 및 이를 전문적으로 실행하는 디자인 영역을 의미한다. 과거 공급자 위주의 정책 결정에서 벗어나 국민 관점의 서비스를 설계하기 위해 최근 서비스디자인 방법론을 활용한 국민 참여 사업 모델이 늘어나고 있다. 특히 행정안전부는 정책 과정 전반에서 국민 관점의 서비스를 설계하기 위해 2014년에 '국민디자인단'을 구성하였다. 정책 수요자인 국민, 서비스디자이너와 공급자인 공무원이 정책과정 전반에 함께 참여하여 서비스디자인 기법을 통해 공공서비스를 개발, 발전시키는 국민참여형 정책모형을 운영하고 있다. 본 연구는 서비스디자인 방법론을 활용한 지역 활성화 전략 수립을 목표로, 국민디자인단 간판개선사업으로 진행된 사례를 통해 실질적인 사업대상지의 발전적 방향성을 제시하였다는 것에 의의가 있다. 단, 본 연구는 현재 진행되고 있는 사업에 관한 내용으로 향후 사업대상지 적용에 대한 검증 및 사용자 만족도 평가 등이 이루어지지 않은 만큼, 향후 사업이 종료되면 수요자를 대상으로 사업 만족도를 파악할 필요가 있다.
Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1170-1175
/
2009
When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.
As a way to raise the brand value of each area and activate local industries, public design projects have been competitively made. Meanwhile, public design has the characteristics of having an uncertain number of users, people with different interests, and management of the design by an administrative organization. Such characteristics may be obstacles to the results of public design and finally can cause many problems in a project's results. However, although most local governments have executed public design projects, systematic research for them and organized execution of the projects has been insufficient. For successful realization, proper organization, and consistent public design, research on a strategic design process is needed. Therefore, this study investigated the current status of public design projects to understand problems in the design process and solve them. The results are presented as follows: First, the design process for public spaces has a dual structure including a specialized process of design development in its execution and management and the execution process in the planning state is unsatisfactory and the process of designer selection is not consistent. Second, as a result of investigating the current status of the design process for public spaces, it was deduced that as most of the projects have been subjectively and temporarily managed by wholly charged organizations without specialized consultation or investigation with different related departments, there have been diverse problems in securing design quality. Third, as a result of analysing the specific execution processes carefully, it was suggested that problems in the process can be solved by decisions through consultation and discussion. As well supportive consultation systems should be used actively.
This thesis aims to show the design logics and the meta-design of a public restroom "Between You and Me." This work reinterprets a public restroom regarded as the typical public space by means of spatial agency's influences, on the assumption thor spatial agency controls the properties of public space. This thesis examines our representational system against the public space, and our specific experience in it with the conceptual model of meta-design. Meta-design is a design beyond the design usually we think of. Experiential meta-design, "Between You and Me" presented as the object of this thesis, is a constructive design project which converts our negative perception of the restroom to a new one, "interface." This project, composed of the surrealistic spatial arrangement, urges us to reconsider our fixed thoughts of the restroom and try a creative experience in it. Finally this thesis shows how the space's way of existence fixes our acts and thoughts, and what enables the repetitive acts and thoughts often emerged In our relations with the public space through a meta-design.c space through a meta-design.
Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.
c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.