• Title/Summary/Keyword: Public Construction Project

검색결과 690건 처리시간 0.031초

공공공사 발주방식 선정에 영향을 미치는 요인 연구 (A Study of Factors Influencing Delivery Methods Selection on Public Construction Projects)

  • 김대길;이웅균;이학주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.218-219
    • /
    • 2014
  • The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.

  • PDF

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • 한국건설관리학회논문집
    • /
    • 제7권5호
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

국내 건설사업관리 업무지침의 개선(안)에 관한 연구 (A Study on Proposal to improve Domestic Construction Management Service Guide)

  • 나광태;유붕열;강병희
    • 한국건축시공학회지
    • /
    • 제2권3호
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$

공공도서관 공간규모계획기준에 관한 기초적 연구 - 공공도서관건립 컨설팅지원사업 결과를 중심으로 - (A Basic Study on the Planning Standard of Space Size for Public Library - Focus on the result of the consulting support project for construction of public library -)

  • 고흥권;임채진;임호균
    • 한국실내디자인학회논문집
    • /
    • 제21권4호
    • /
    • pp.190-199
    • /
    • 2012
  • In this era of information, the public library takes a important role in the local community. In several years, public libraries have been proliferated in our society. However, there have not been specific planning standards of space size for construction of public library. The situation has lead the local governments to the need of consulting for the construction and management of library in search of appropriate guideline. The research paper focuses on the result of consulting support project for construction and management of public library. It examines total 11 libraries which were consulted from 2009 to 2011. It examines the configurational differences between the first scheme from the local government and the final scheme after the consulting, and the percentages of gross areas of each parts of library, reference and reading area, office area, education and cultural area, and public common use area. The analysis concludes that reference and reading area increased by 6.4% from 34.1% to 40.5%, and public common use area reduced by 6.1% from 30.2% to 24.1%, which represents a certain tendency of the configuration ratio of the each parts. Thus, the paper could be a starting point of establishing planning standard of space size for public library.

  • PDF

공공부문 시공책임형 CM 사업의 시공이전단계 성과분석 (Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector)

  • 박보성;김옥규
    • 한국건설관리학회논문집
    • /
    • 제22권2호
    • /
    • pp.97-105
    • /
    • 2021
  • 발주제도 혁신을 통한 국내 건설산업의 글로벌 경쟁력 강화를 목적으로 시작된 시공책임형 CM 사업이 공공부문에서 시범사업의 형태로 시행되고 있다. 그러나 정식 발주제도로 나아가기 위한 관련 법령 제정까지는 시간이 필요해 보이며, 사업에 대한 성과분석도 아직까지 미진한 상황이다. 이에 본 논문에서는 현재 시행되고 있는 4개의 시범사업의 사업이전단계사업관리(Pre-Construction Service)에 대한 성과분석을 통해 사업의 효과와 신뢰성을 검증하고자 하였다. Team Building, 설계도서 정합성, 공기검토, VE, BIM 활용 등 총 5개의 분야에 대해 성과분석을 진행했으며, 참여자 면담조사를 통해 문제점을 확인하고 그에 대한 개선안을 제시하였다. 본 연구의 결과는 향후 이루어질 발주제도 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • 제24권3호
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 - (Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines -)

  • 조영준
    • 한국건설관리학회논문집
    • /
    • 제21권1호
    • /
    • pp.3-11
    • /
    • 2020
  • 다년간 수행해야 하는 일정규모이상의 대형 공공건설공사에서 발주기관은 건설사업관리자의 건설사업관리업무를 위해 예산을 확보해야 한다. 발주기관이 확보하는 사업관리예산과 발주기관이 집행하는 사업관리예산이 동일할 경우 문제가 없지만, 그렇지 않을 경우 다양한 문제가 발생하게 된다. 실제로 건설기술진흥법에는 건설기술선진화를 위해 책임감리를 없애고 건설사업관리를 명시하였으나 기획재정부의 총사업비관리지침에는 책임감리라는 용어를 사용하고, 이에 따라 발주기관이 예산을 청구하도록 하고 있다. 따라서 발주기관의 예산확보와 예산집행사이에 괴리가 발생함으로 인해 건설사업관리업무를 수행해야 하는 현장에서는 많은 어려움을 호소하고 있다. 이에 본 연구에서는 건설사업관리가 효율적으로 운용될 수 있도록 다음과 같은 제도적 개선방안을 제시하였다. 첫째, 법령과 정부기관의 지침 등에 명시된 건설사업관리 용어와 업무를 단일화해야 하며 대가산정기준을 통일해야 한다. 이에 본 연구에서는 건설사업관리가 효율적으로 운용될 수 있도록 다음과 같은 제도 개선방안을 제시하였다. 첫째, 법령과 정부기관의 지침 등에 명시된 건설사업관리 용어와 업무를 단일화해야 하며 대가산정기준을 통일해야 한다. 둘째, 탈락한 건설사업관리자가 기술제안서 보상비를 지급받을 수 있도록 총사업비관리지침에 명시해야 한다. 셋째, 장기계속공사에서 사업비가 변경될 경우 그에 따라 건설 사업관리비가 조정될 수 있어야 한다. 넷째, 발주기관에서 건설사업관리업무가 필요하다면 전문기관에 위탁할 수 있는 근거를 총사업비관리지침에 명시해야 한다.

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

BTL사업의 사업시행자 평가기준 개선 요인 분석 (Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects)

  • 신현인;박태근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

국내 공공부문 시공책임형 CM 사업자 선정을 위한 평가방식에 관한 기초연구 (A Basic Study on the Evaluation Method for the Selection of Construction Responsible CM Operators in Korea)

  • 박보성;이태형;방홍순;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.298-299
    • /
    • 2018
  • The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.

  • PDF