Proceedings of the Korean Institute of Building Construction Conference
/
2014.11a
/
pp.218-219
/
2014
The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.
Korean Journal of Construction Engineering and Management
/
v.7
no.5
/
pp.177-190
/
2006
Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.
Journal of the Korea Institute of Building Construction
/
v.2
no.3
/
pp.147-154
/
2002
The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$
In this era of information, the public library takes a important role in the local community. In several years, public libraries have been proliferated in our society. However, there have not been specific planning standards of space size for construction of public library. The situation has lead the local governments to the need of consulting for the construction and management of library in search of appropriate guideline. The research paper focuses on the result of consulting support project for construction and management of public library. It examines total 11 libraries which were consulted from 2009 to 2011. It examines the configurational differences between the first scheme from the local government and the final scheme after the consulting, and the percentages of gross areas of each parts of library, reference and reading area, office area, education and cultural area, and public common use area. The analysis concludes that reference and reading area increased by 6.4% from 34.1% to 40.5%, and public common use area reduced by 6.1% from 30.2% to 24.1%, which represents a certain tendency of the configuration ratio of the each parts. Thus, the paper could be a starting point of establishing planning standard of space size for public library.
Korean Journal of Construction Engineering and Management
/
v.22
no.2
/
pp.97-105
/
2021
The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.
Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
Architectural research
/
v.24
no.3
/
pp.85-91
/
2022
The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.
Korean Journal of Construction Engineering and Management
/
v.21
no.1
/
pp.3-11
/
2020
In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.
International conference on construction engineering and project management
/
2015.10a
/
pp.698-699
/
2015
For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.310-316
/
2006
Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.
Park, Bo-Sung;Lee, Tae-Hyeong;Bang, Hong-Soon;Kim, Ok-Kyue
Proceedings of the Korean Institute of Building Construction Conference
/
2018.05a
/
pp.298-299
/
2018
The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.