신재생에너지 시스템이 연계된 22.9[kV] 배전계통의 개선된 보호협조 방안 연구 (A Study on the Advanced Protective Coordination Schemes of 22.9[kV] Distribution System Interconnected New Renewable Energy System)

  • 최동만;최준호;노경수;문승일;김재철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.426-428
    • /
    • 2005
  • Recently, There has been growing interest in new renewable energy systems with high-energy efficiency due to the increasing energy consumption and environmental pollution problems, but an insertion of new renewable energy systems to existing power distribution systems can cause several problems such as voltage variations, harmonics, protective coordination, increasing fault current etc, because of reverse power. This paper was applied to Sukumar M, Brahma, A. Girgis[1] proposal schemes and identilys the faulted section performing short-circuit analysis by MATLAB programs to 22.9[kV] distribution system interconnected a large number of new renewable energy system and was analyzed on protective coordination between reclose and Sectionalizer.

  • PDF

분산전원이 연계된 배전계통의 사고지점 확인 및 보호협조 방안 제시 (Fault location identification and protective coordination schemes presentation of distribution system interconnected Distributed Generation)

  • 최동만;최준호;노경수;문승일;김재철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.313-315
    • /
    • 2005
  • Recently There has been growing interest in new renewable energy systems with high-energy efficiency due to the increasing energy consumption and environmental pollution problems. But an insertion of new distributed generation to existng power distribution systems can cause several problems such as voltage variations, harmonics, protective coordination, increasing fault current etc, because of reverse power. This paper was applied to fault location defecting a method as each Relay sensing fault current value and carried out short-circuit analysis by MATLAB and PSCAD/EMTDC programs and identity the faulted section o f22.9[kV] distribution system interconnected a large number of distributed generation. The existing protection system of 22.9[kV] power distribution system analyzed and the study on protective coordination recloser and Sectionalzer accomplished

  • PDF

IEC 표준에 의한 고장전류 계산과 보호협조 (Fault Current Calculation and Coordination by IEC Standards)

  • 손석금
    • 조명전기설비학회논문지
    • /
    • 제28권12호
    • /
    • pp.6-12
    • /
    • 2014
  • The safety and reliability of the power system short-circuit current, the short-circuit current depends on the failure to obtain the objective is to quickly eliminate the breaking capacity of the circuit-breaker selection of the cable, the insulation of electrical equipment and protective relay an important factor in determining the level correction and protective relay selection scheme to be meaningful. Standards used in the domestic circuit breaker is applied to the production of IEC standard, but the American National Standards (ANSI / IEEE) by NEMA specification of the fault current calculations and the application of the asymmetric coefficient Korea. Therefore, in this paper, the IEC 60909 standard IEC breaker fault current calculation method and the method for selection of system configurations reviewed and protection system for reviewing the configuration of various protective relays appropriate correction and the correction value is main protection, back-up protection the equipment so that the period of protection relay coordination to minimize accidents and accident protection to minimize interruptions proposed for cooperation.

배전계통에 대용량변압기 교체 적용시 초전도 한류기의 임피던스에 따른 순간전압 분석 (Analysis on Voltage Sag in Power Distribution System according to SFCL's Impedance for Protective Coordination with Large Transformer)

  • 김진석;문종필
    • 전기학회논문지P
    • /
    • 제63권4호
    • /
    • pp.312-316
    • /
    • 2014
  • In this paper, a voltage sag is analyzed in case of superconducting fault current limiter (SFCL) installed in power distribution system where replaces the main power transformer to large one to meet the power demand. First, the power system is configurated to analyze the operation characteristics of the protective relay with replacement of the main transformer and application of the SFCL. Next, the method to meet the protection coordination is analyzed with large transformer using PSCAD/EMTDC. Finally, the bus voltage is investigated according to the impedance of both main transformer and SFCL in case that the SFCL is applied into feeder.

An Accurate Model of Multi-Type Overcurrent Protective Devices Using Eigensystem Realization Algorithm and Practice Applications

  • Cheng, Chao-Yuan;Wu, Feng-Jih
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권1호
    • /
    • pp.9-19
    • /
    • 2016
  • Accurate models of the characteristics of typical inverse-time overcurrent (OC) protective devices play an important role in the protective coordination schemes. This paper presents a novel approach to determine the OC protective device parameters. The approach is based on the Eigensystem Realization Algorithm which generates a state space model to fit the characteristics of OC protective devices. Instead of the conventional characteristic curves, the dynamic state space model gives a more exact fit of the OC protective device characteristics. This paper demonstrates the feasibility of decomposing the characteristic curve into smooth components and oscillation components. 19 characteristic curves from 13 typical and 6 non-typical OC protective devices are chosen for curve-fitting. The numbers of fitting components required are determined by the maximum absolute values of errors for the fitted equation. All fitted equations are replaced by a versatile equation for the characteristics of OC protective devices which represents the characteristic model of a novel flexible OC relay, which in turn may be applied to improve the OC coordination problems in the sub-transmission and distribution systems.

종속 접속된 산화아연바리스터 기반의 서지방호장치의 협조 (Coordination of Cascaded Metal Oxide Varistor-Based Surge Protective Devices)

  • 김태기;신희경;이복희
    • 조명전기설비학회논문지
    • /
    • 제29권6호
    • /
    • pp.70-77
    • /
    • 2015
  • This paper describes the experimental results obtained from various installation conditions of cascaded metal oxide varistor(MOV)-based SPDs with the objectives to analyze the coordination of the cascaded surge protective devices(SPDs) and to propose the proper selection and installation methods of the cascaded SPDs. The residual voltage, discharge current and energy sharing between the upstream and downstream SPDs in the $10/350{\mu}s$ direct lightning current wave were measured and discussed. The coordination of cascaded MOV-based SPDs is closely related to the varistor voltage and installation methods of SPDs. In cascaded SPDs without dedicated decoupling elements, the natural impedance of leads connecting two SPDs can act as a decoupler for the coordination of MOV-based SPDs. Even if the varistor voltage of the upstream SPD is higher than that of the downstream SPD at long distances between two SPDs, the energy coordination of cascaded SPDs could effectively be fulfilled in the conditions of large surge currents and the optimum voltage protection level can be achieved. Consequently, if the distance between voltage limiting type SPDs is long, the coordination of the cascaded SPDs should be determined by taking into account the decoupling effects due to the intrinsic inductance of leads connecting the upstream and downstream SPDs.

Coordination between Voltage-Limiting Surge Protective Devices in Surge Currents Caused by Direct Lightning Flashes

  • Shin, Hee-Kyung;Lee, Jae-Suk
    • 조명전기설비학회논문지
    • /
    • 제29권4호
    • /
    • pp.116-125
    • /
    • 2015
  • This paper presents experimental results obtained from actual installation conditions of surge protective devices (SPDs), with the aim of understanding the coordination of cascaded Class I and Class II SPDs. This paper also proposes effective methods for selecting and installing coordinating cascaded SPDs. The residual voltage of each SPD and the energy sharing of an upstream Class I tested SPD and a downstream Class II tested SPD were measured using a $10/350{\mu}s$ current wave. In coordinating a cascaded voltage-limiting SPD system, it was found that energy coordination can be achieved as long as the downstream SPD is a metal oxide varistor with a higher maximum continuous operating voltage than the upstream SPD; however, it is not the optimal condition for the voltage protection level. If the varistor voltage of the downstream SPD is equal to or lower than that of the upstream SPD, the precise voltage protection level is obtained. However, this may cause serious problems with regard to energy sharing. The coordination for energy sharing and voltage protection level is fairly achieved when the cascaded SPD system consists of two voltage-limiting SPDs separated by 3 m and with the same varistor voltage.

특별저전압 직류 전원회로에 유용한 서지방호장치의 설계와 특성 (Design and Behavior of Validating Surge Protective Devices in Extra-low Voltage DC Power Lines)

  • 심서현;이복희
    • 조명전기설비학회논문지
    • /
    • 제29권3호
    • /
    • pp.81-87
    • /
    • 2015
  • In order to effectively protect electrical and electronic circuits which are extremely susceptible to lightning surges, multi-stage surge protection circuits are required. This paper presents the operational characteristics of the two-stage hybrid surge protection circuit in extra-low voltage DC power lines. The hybrid surge protective device consists of the gas discharge tube, transient voltage suppressor, and series inductor. The response characteristics of the proposed hybrid surge protective device to combination waves were investigated. As a result, the proposed two-stage surge protective device to combination wave provides the tight clamping level of less than 50V. The firing of the gas discharge tube to lightning surges depends on the de-coupling inductance and the rate-of-change of the current flowing through the transient voltage suppressor. The coordination between the upstream and downstream components of the hybrid surge protective device was satisfactorily achieved. The inductance of a de-coupler in surge protective circuits for low-voltage DC power lines, relative to a resistance, is sufficiently effective. The voltage drop and power loss due to the proposed surge protective device are ignored during normal operation of the systems.

종속 접속된 전압제한형 SPD의 직격뢰 서지전류에 대한 에너지협조 (Energy Coordination between Cascaded Voltage Limiting Type SPDs in Surge Currents due to Direct Lightning Flashes)

  • 이복희;엄상현
    • 조명전기설비학회논문지
    • /
    • 제28권5호
    • /
    • pp.68-75
    • /
    • 2014
  • Cascaded applications of surge protective devices(SPDs) are required in order to reduce the stress on the electrical and electronics equipment being protected, and the energy coordination between the cascaded SPDs is very important. This paper deals with the experimental results obtained from the installation conditions of full-scale SPDs. The energy coordination between the upstream Class I SPD and the downstream Class II SPD was measured using a $10/350{\mu}s$ impulse current due to direct lightning flashes. The distances between the cascaded SPDs were 3, 10, and 50m, and the maximum test current was 12.5kA. As a result, the energy sharing between cascaded SPDs was dependent on the voltage protection level of each SPD and the distance between two SPDs. An overview of how to select SPD ratings in applications of cascaded SPDs system was discussed based on the energy coordination between the two SPDs. The proposed test results for the energy coordination between two-stage cascaded SPDs can be used in effective applications of SPDs.

지상변압기의 내부 보호장비 작동을 위한 MCA 보호협조에 대한 연구 (A study on Protective Coordination of MCA for Performing of the Pad Mounted Transformer's inside Protective Device)

  • 현승윤;김창환
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권1호
    • /
    • pp.5-7
    • /
    • 2022
  • KEPCO's plan is undergoing a trial operation to replace the open-loop section with ring main units configuration where underground distribution lines are installed, by linking the multi-way circuit breakers auto (MCA) on the power side of each pad-mounted transformer. However, ring main units application mentioned above may cause the ripple effects, when implementing the configuration without a study of protection coordination. Because ring main units with classical pre-set protection devices contribution in fault condition didn't consider yet. For the reliable ring main units operation, it is necessary to resolve several protection issues such as the protection coordination with substation side, prevention of the transformer inrush current. These issues can radically deteriorate the distribution system reliability Hence, it is essential to design proper protection coordination to reduce these types of problems. This paper presents a scheme of ring main units' configuration and MCA's settings of time-current curves to preserve the performance of protection coordination among the switchgears considering constraints, e.g. prevention of the ripple effects (on the branch section when a transformer failure occurs and the mainline when a branch line failure occurs). It was confirmed that the propagation of the failure for each interrupter segment could be minimized by applying the proposed TCC and the interrupter settings for the MCAs (branch, transformer). Further, it was verified that the undetected area of the distribution automation system (DAS) could be supplemented by having the MCA configurated ring main units operate first, instead of the internal protection equipment in the transformer such as the fuse, STP when a transformer failure occurs.