The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.9
/
pp.1141-1145
/
2018
Generally, in nuclear plants, distance relay (21R) has adapting to protect and to operate main protective of transmission lines and backup protective of main generator. Operation of 21R was required and based on exactly accurate calculation and criteria. But presently method of 21R setting has applied according to protection devices operation guide of KPX, excepting IEEE and ISA standards, which have a difference review directions, consider parameters and devices, also consideration factors were affected to relay operations by uncertain guides. therefore this paper proposed new protection relay setting method and unvague criteria from IEEE 741 and ANSI/ISA 67.04.01, and reviewed a different results through numerical calculation results for methods and criteria including previous and established 21r setting by IEEE, ANSI/ISA Technical standards.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.12
/
pp.1801-1806
/
2012
This paper presents a simple and practical method which enables to prevent malfunction of protection relay due to differential current caused by one end CT saturation in case of external fault. This method uses difference of magnitude(instantaneous value) between the both end current just before the occurrence of differential current without a separate method to CT staturation detection. One end CT saturation is simulated by current transformer model using type-96 component and the presented method is verified by using EMTP MODELS with respect to internal and external fault with one end CT staturation. The presented method distinguished rightly bewteen external and internal fault with one end CT saturation. This information can be used to prevent malfunction of current differential protection relay in case of external fault. And this method is not affected by sampling rate and has no calculation burden, so it will be applicable to differential current protection relay with ease.
This paper proposes a protection algorithm for a wind turbine generator (WTG) in a large wind farm. To minimize the outage section, a protection relay for a WTG should operate instantaneously for an internal fault or a connected feeder fault, whereas the relay should not operate for an internal fault of another WTG connected to the same feeder or an adjacent feeder fault. In addition, the relay should operate with a delay for an inter-tie fault or a grid fault. An internal fault of another WTG connected to the same feeder or an adjacent feeder fault, where the relay should not operate, is determined based on the magnitude of the positive sequence current. To differentiate an internal fault or a connected feeder fault from an inter-tie fault or a grid fault, the phase angle of the negative sequence current is used to distinguish a fault type. The magnitude of the positive sequence current is then used to decide either instantaneous operation or delayed operation. The performance of the proposed algorithm is verified under various fault conditions with EMTP-RV generated data. The results indicate that the algorithm can successfully distinguish instantaneous operation, delayed operation, or non-operation depending on fault positions and types.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.7
/
pp.925-930
/
2013
The fault current of the power transmission system is greater than that of the power distribution system. Therefore, the introduction of superconducting fault current limiter (SFCL) is more needed to reduce the increased fault current. The trigger-type SFCL consists of the high-temperature superconducting element (HTSC), the current limiting reactor (CLR) and the circuit breaker (CB). The trigger-type SFCL can be used to supplement the disadvantages of the resistive-type SFCL. The operation characteristics of the current ratio differential relay which is usually applied to the protection device of the power transmission system are expected to be affected under fault conditions and the applicability of the trigger-type SFCL. In this paper, we analyzed the operating characteristics, by the fault conditions, between the current ratio differential relay for line protection and the trigger-type SFCL in the power transmission system through the PSCAD/EMTDC simulation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.17
no.6
/
pp.39-46
/
2003
In this papers, We studied system requirement specification, hardware design and implementation, protective algorithm and software design method to implement digital protective relay which has high trust and high function of protection as well as control and metering for power transformers. Protective relay for transformer is implemented on real time using DSP, which is the specific processor for digital signal processing, as a result, it is completed by the wide improvement of arithmetic capability of protective relay. Reliability is proved testing operating value and operating time, reset value and reset time of an relaying element using protective relay tester made in NF Corporation of Japan.
The digital current differential relaying scheme is widely used for primary protection of 765(kV) power transformer. The current differential relay pickup the internal fault at the threshold which is set at 30% of rating current. Margin of 30% include current transformer error 5%, relay error 5%, on load tap changer error 7% and margin factor 140% obtained from the field experience. In this paper transformer protection relay and relay setting rule of high voltage power system are discussed. And we verify the correctness of relay setting rule with current differential relay using Matlab simulation.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.62
no.3
/
pp.133-138
/
2013
A large generator is an important role in transferring an electric power to power system. The IEDs of large generator often use microprocessor technology to obtain a digital relay system with a wide range of measuring, protection, control, monitoring, and communication functions. However, all generator protection and control systems in Korea imported from abroad and are being operated. In order to reduce the large expense and improve the reliable operation, development of generator protection and control system by domestic technology is required. This paper deals with the design of the IED of generator protection panel for development of generator protection and control system. The major emphasis of the paper will be on the description of hardware and signal processing test results and measurement accuracy of the prototype IED. By developing of generator IED based on DSP and microprocessor, replacement of the generator protection panel imports are expected to be effective.
This paper describes the synergism of Artificial Neural Network and Fuzzy Logic based approach to improve the reliability of transformer differential protection, the conventional transformer differential protection commonly used a harmonic restraint principle to prevent a tripping from inrush current during initial transformer´s energization but such a principle can not performs the best optimization on tripping time. Furthermore, in some cases there may be false operation such as during CT saturation, high DC offset or harmonic containing in the line. Therefore an artificial neural network and fuzzy logic has been proposed to improve reliability of the transformer protection relay. By using EMTP-ATP the power transformer is modeled, all currents flowing ...
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.12
/
pp.74-80
/
2013
Generator faults does not happen more often than the transmission and substation facility faults. However, impacts on the power system by generator faults are very large. In order to minimize the impact of generator faults, generator protection and control system with high reliability is required. Most of the generator relay in generator protection and control system of large power plant of Korea is operated by imports from abroad. Accordingly, in order to accumulate source technology and increase the import substitution effect, localization of multi-function generator protection IED is being developed. This paper deals with the implementation of a multi-function prototype IED H/W, which can be command and data exchange through communication for measuring, monitoring, protection and control. And the IED specification, various relay elements, measurement elements, communication functions, module function, and test system for the prototype IED H/W are described.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.18
no.3
s.118
/
pp.341-350
/
2007
In this paper, the derivation of protection ratio is newly proposed for the detailed planning of frequency coordination in microwave relay networks, and computed results for protection ratio of co-channel and adjacent channel are illustrated over the actual system and its frequency. It is shown that the suggested method based upon availability prediction can be expressed in terms of composite fade margin, interference-to-noise ratio(I/N), net filter discrimination, and system parameters. According to results, for 6.7 GHz, 60 km, 64-QAM, and I/N= -6 dB at BER $10^{-6}$, composite fade margin and co-channel protection ratio provide 25.5 and 50.7 dB, respectively. Also, net filter discrimination and adjacent channel protection ratio are obtained as 26.3 and 24.4 dB, respectively, at the first adjacent channel of 40 MHz. The proposed method provides some merits in computing protection ratio for microwave relay networks in view of an easy extension and practical applications considering more detailed and various system parameters.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.