Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project - (갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 -)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.87-94
    • /
    • 2012
  • The apartment reconstruction projects have the proper functions such as residential environment improvement and the new housing allocation system; however, intention of the projects are distorted by the combination of factors, like failure of relocation of the original occupants and income redistribution, speculation in real estate, sharp rise in housing price, disputation between various interested parties, inadequate system and etc and it makes the projects unable to go well. Disputations and litigations are due to spread of the small conflict. As a result of the problems, it could not going smoothly and that lead to increase or stop the period and cost. This study is to estimate the period and cost using the conflict index so as to prevent and solve the problem which is among the conflict in the reverse functions. The conflict index has estimated focus on the conflict impact and the period and cost has been estimated using an variable independent including the conflict index. Also, estimated the conflict index and estimate of the period and cost are able to succeed with a minimum of disputation and money.

Proper Mixing Ratio for Securing Quality of Free-form Panel (비정형 패널의 형상 품질확보를 위한 적정 배합비 도출)

  • Kim, Min-Sik;Park, Chae-Wool;Kim, Ki-Hyuk;Do, Sung-Lok;Lee, Dong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.449-456
    • /
    • 2019
  • Recent developments in architectural technologies and programs have enabled architects to think creatively and design free-form architecture. however, there are many problems in the production technology of FCP(Free-Form Concrete Panel). In particular, reduced accuracy due to lack of free-form panel production technology can lead to redesign of buildings as a result, problems such as an increase in construction cost and period. Therefore, this experiment aimed to compensate the decrease of the accuracy according to the displacement difference and to derive the proper mixing ratio for maintaining the shape during the free-form panel curing. In this study, molds were made using paraffin that is a recyclable phase change material. Concrete Panel is usually produced from Portland cement, dead burn magnesia, phosphate, borax and fine aggregate. In this study, four mixing ratios of FCP were selected after each material was blended to determine the proper blending ratio of the fluidity phase, the water absorption rate and the water content of the test piece. FCP was fabricated on the basis of the selected four compounding ratios and thickness and error rate were measured. Based on the error rate of the measured FCP, the quality standard was satisfied among the four compounding ratios.

Need to Reduce Industrial Accidents through the Introduction of an Prevailing Wage System (적정임금제 도입을 통한 산업재해 감축 필요성 고찰)

  • Choonhwan Cho;Yeoncheol Shin;Kyung-Bo Han
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • In order to carry out construction work, it is urgent to introduce a proper wage system so that the cost burden of projects that have been won due to bleeding competition among original government buildings based on low-priced bids can be transferred to subcontractors. Purpose: Construction with illegal multi-level industrial structure needs to improve the wage reduction environment leading to order (100%) → original contractor (80%) → subcontractor (65%) → load contractor (65%) and aims to ensure wages for end workers. Method: Investigate the current status of labor cost appropriate payment plan in the construction industry, and investigate the case of the appropriate wage system (P.W) in the United States. In addition, the effect and direction of the appropriate wage system are presented. Result: Individual minimum wage security was also mentioned in the Constitution, and many researchers suggested that only the introduction of an appropriate wage system could solve the problem of reducing worker labor and ensure quality and safety. Conclusion: The proper wage system in the construction industry will block illegal multi-level and illegal foreign work, improve the labor environment in the construction market, create an influx of young workers, and have a significant impact on the construction industry's competitive structure, safety, and quality.

A study on the evaluation for variation of revenue water ratio considering water supply area conditions and the development of proper cost estimation model of project for improvement of revenue water ratio (급수지역 여건을 고려한 유수율 변동 분석 및 적정 유수율 제고 사업비 산정 모델 개발)

  • Kiwon Kwon;Jinseok Hyung;Taehyeon Kim;Haekeum Park;Yoojin Oh;Jayong Koo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.409-423
    • /
    • 2023
  • In this study, we analyzed how the revenue water ratio(RWR) is affected by changes in conditions of the water supply area, such as the ratio of aging pipes, maintenance conditions, and revenue water. As a result of analyzing the impact of pipe aging and maintenance conditions on the RWR, it was confirmed that the RWR could be decreased if the pipe replacement project to improve the aging pipe ratio was not carried out and proper maintenance costs were not secured. It was also confirmed that an increase in the revenue water could be operated to facilitate the achievement of the project's target RWR. In contrast, a decrease in the revenue water due to a population reduction could affect the failure of the target RWR. In addition to analyzing the causes of variation in the RWR, the calculation of estimated project costs was considered by using leakage reduction instead of RWR from recent RWR improvement project cost data. From this analysis, it was reviewed whether the project costs planned to achieve the target RWR of the RWR improvement project in A city were appropriate. In conclusion, the RWR could be affected by variations in the ratio of aging pipes, maintenance conditions, and revenue water, and it was reasonable to consider not only the construction input but also the input related to RWR improvement, such as leakage reduction, when calculating the project cost.

A Study on the Estimation of Probabilistic Repair.Reinforcement Cycles from Rating Curve of Steel Girder Bridges (강재 교량의 노후화에 따른 확률적 보수.보강 주기 추정에 관한 연구)

  • Kim, Hyun-Bae;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.102-110
    • /
    • 2009
  • The cost for maintenance of bridge structures such as repair or reinforcement is increasing. In addition, the efforts for inspection of bridge structures is becoming more important since the proper repair or reinforcement should be performed to save the maintenance cost and ensure the safety for public infrastructure. Therefore, it is studied on this paper to estimate the repair or reinforcement cycles using probabilistic approach for the steel-box girders of bridge superstructure. In addition, a computer simulation program is uniquely developed based on probabilistic approach to calculate the cycles derived from the function of age of bridge and performance rating curve which were previously studied. In order to ensure the reliability of results and appropriateness of the model, statistical analyses were performed. Also, the results were compared and proved to be similar with ones from previous statistical data related to the repair or reinforcement cycles. The results from this study is expected to be useful for the determination of proper time to repair or reinforce the bridge structure and raise the safetyness of bridge structure in advance.

Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method (무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석)

  • Lee, Dong Wook;Cho, Hong Jun;Lee, Keun Jo;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.457-468
    • /
    • 2011
  • Recently, the non-vibration mass excavation method is used on sewage pipes and road construction sites in Jeju. However, a construction cost estimation based on the unit quantity does not provide a proper unit price. In this study, a comparison of the productivity of the standard quantity-per-unit costing method and the one of the work crew combination method was made based on the site monitoring of the non-vibration mass excavation method that is used in construction sites near Jeju. For this, data of 35 sites were collected: a regression equation was derived from the 30 data, and verification was carried out through the remaining 5 data. The analysis concluded that a day's workload is $16.43m^3$. In addition, a combination of the equipment considering the site conditions and the amount of labor, which varies with the number of work crew was obtained in order to estimate the construction cost of the work crew combination method. The construction cost was calculated based on the one-day workload ($16.43m^3$) derived from the regression analysis. The cost then was analyzed and compared with the standard quantity-per-unit costing method.

A Study on the Container Charges of Pusan Container Terminal (부산 콘테이너 부두의 하역료에 관한 연구 - 공영기업 차원의 요금산정을 중심으로 -)

  • Lee, Cheol-Yeong;Lee, Kwang-Hee
    • Journal of Korean Port Research
    • /
    • v.3 no.1
    • /
    • pp.3-33
    • /
    • 1989
  • The amount of the Korean export & import in 1987 reached $88.3 billion which was 1.75% of the total world trade and the proportion of foreign dependence to G.N.P was 74.5%. From these facts, we can infer that the development of national economy is largely dependent upon trade. Therefore the role of transportation, especially Ocean transportation, as a basis of economic development through trade is one of the main factors that can not be passed over. Here, We can define that a port as a subsystem of transportation determines the efficiency of the total transportation system. Thus, the purpose of this paper is to contribute in improvement of the efficiency in port, reinforcement of the international competitiveness for exporting goods by the analysis of the cargo handling charges. In order to do this, this paper deals the case of B.C.T.O.C. Furthermore, this study gives some important informations related to the level of tariffs for establishing an autonomous port administration. The Summary of the conclusions of this paper is as follows ; 1) The object of port administration in Korea has been emphasized on the maximization of efficiency in using the port facilities. Nowadays, however, it should be moved to a direction that port is operated under the compound aims considering the public interests and economy. 2) For a criterian of tariff calculation, A tariff system based on the cost accounting is desirable. In general it is recommended that the cost for construction, management, and operation of port is compensated by the revenue from port operation. Therefore, it is necessary for the administration bodies of each port to establish a tariff system on the basis of the independent profit system. 3) For the investigation of actors of tariff adjustment by the Break-even point analysis, (1) When we conducted the B.E.P analysis using total cost as cost term, we got 3.8% discount in tariff at 12% of target profit rate and 1.5% discount at 15% of rate. when we set the target profit rate as 17% we could have the proper tariff level. (2) When using operating cost as cost term, we got 13.1% discount in tariff at 12% of target profit rate and 10.9% discount at 15% of rate. When setting the target profit rat as 28%, we could have the proper tariff level. 4) Comparing with the tariffs of foreign ports for the basic terminal rate, The tariff level of B.C.T.O.C showed 33% of stevedoring charge and 80% of marshalling charge incurred at Kobe port. The comparison with Singapore port gave 50% of transhipment charge and 17% - 20 % of stevedoring charge. 5) We found that the financial structure of B.C.T.O.C was better than those of other companies and the worth fixed assets ratio was too low. The fact of low worth fixed assets ratio implies that the cargo handling facilities should be increased. Moreover, The return of assets for B.T.T.O.C was good but non-operating expenses were still contained too much in. Therefore, we think that it is necessary for B.C.T.O.C. to rationalize business management. Although the present cargo handing charge for B.C.T.O.C is a proper level in terms of a public corporation, for the final recommendation in connection to the results, It is required to take the rationalization process for business management.

  • PDF

A Neural Network Model for Selecting a Piling Method of Building Construction (건축공사 말뚝공법 선정을 위한 신경망 모델 개발)

  • Cheon Bong-Ho;Koo Choong-Wan;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.317-322
    • /
    • 2004
  • As a construction project in urban area tends to be high-rise and huge, the importance of the project's underground work, in terms of the cost and the schedule, is gradually increasing. It's extremely significant to choose a proper filing method, at the stage of underground work. However, in piling work many change orders have been occurred since a piling method is experientially selected based on uncertain information and many earth factors to consider. It has effects on the cost and the schedule of the project. In this study, we have suggested a decision model for piling method that can be used to determine and verify the suitable piling method in design and pre-construction phase of a project. Based on historical data, a neural network model has already proven to be efficient. The tests of the model for selecting a suitable piling method have progressed exactly with the data of 150 piling works which were done room 2000 to 2004 in Korea. The optimization or the developed neural network model has progressed with the data for teaming. The validity of the neural network model has been verified.

  • PDF

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.