• Title/Summary/Keyword: Proper Construction Cost

Search Result 206, Processing Time 0.025 seconds

Estimation of Adequate Capacity of Ground Source Heat Pump in Energy-saving Pig Farms Using Building Energy Simulation (BES를 사용한 에너지 절감형 양돈장의 지열히트펌프 적정 용량 산정)

  • Lee, Seong-Won;Oh, Byung-Wook;Park, Kwang-Woo;Seo, Il-Hwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.1
    • /
    • pp.1-13
    • /
    • 2022
  • In Korea, attention is being paid to the use of renewable energy in the livestock industry, and Ground Source Heat Pump (GSHP), which is advantageous for temperature control, is considered as one of the ways to reduce the use of fossil fuels. But GSHP is expensive to install, which proper capacity calculation is required. GSHP capacity is related to its maximum energy load. Energy loads are affected by climate characteristics and time, so dynamic analysis is required. In this study, the optimal capacity of GSHP was calculated by calculating the heating and cooling load of pig farms using BES (Building Energy Simulation) and economic analysis was performed. After designing the inside of the pig house using TRNSYS, one of the commercial programs of the BES technique, the energy load was calculated based on meteorological data. Through the calculated energy load, three heating devices and GSHP used in pig farms were analyzed for economic feasibility. As a result, GSHP's total cost of ownership was the cheapest, but the installation cost was the highest. In order to reduce the initial cost of GSHP, the capacity of GSHP was divided, and a scenario was created in which some of it was used as an auxiliary heating device, and economic analysis was conducted. In this study, a method to calculate the proper capacity of GSHP through dynamic energy analysis was proposed, and it can be used as data necessary to expand the spread of GSHP.

A Basic Study for Finding Methods to solve the Crisis of Construction Industry caused by Deterioration of Liquidity (유동성 악화에 따른 건설산업 위기극복 방안 모색을 위한 기초연구)

  • Kim, Eun-Sung;Lee, Sang-Hyo;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.131-135
    • /
    • 2009
  • Domestic construction industry is facing big difficulties by a worldwide financial crisis. Especially the deterioration of liquidity by the reject of banks for project financing and unsold housing project made a big problem on financing for the ongoing and new projects. To solve this, it is critical for construction companies. banking facilities and public organizations to cooperate and support each other. In this study, the methods which each part can do are investigated. Construction companies can do a price reduction, finance condition improvement for deposit and down payment, asset sale and cost reduction. And Public organizations can buy the assets of construction companies with proper price and ease the regulation to activate transactions of real estate. In the case of Banking facilities, they can support arrangement and liquidation of insolvent projects and so on.

  • PDF

A Study on the Methodology of U-City Services Standardization (신도시 U-City 서비스 표준화 방법론에 관한 연구)

  • Lee, Sang Hun;Yang, Dong Suk
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.4
    • /
    • pp.53-62
    • /
    • 2012
  • U-City means the high-tech city that applied ubiquitous technology and information communication technology. U-City aims to intensify urban competitiveness and to improve the quality of residents' life through efficient management of the urban. Currently, 77 U-City projects is underway. The each project cost and scale estimate is not clear in the absence of the U-Service Standardization Model. So, many of the project are trouble about making a production the proper number of U-Service or the cost of project. The excessive service construction is reflected on the construction costs, which leads to the rise of sales price and passes onto the executor of a project as a burden of the project costs, and the problem of the delay of the change-over occurs due to supporting the operation costs for the operation of the constructed service and the demand for additional installation of facilities between a local autonomous entity and the executor of a project. In this paper, we suggested the U-Services Construction Standardization Methods and proposed the standardization services guideline of crime prevention services. U-City services in the future are able to maintain the consistency of the system through the utilization of the proposed standard model. As a result, the U-City project's pre-estimated cost and scale can be extracted.

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

Development of Historical Data Selection Model Using Non-parametric test in Public Sector - focused on Reinforced Concrete Works of Multi-housing Projects - (비모수 검정기반 공공부문 실적단가 선정모델 개발 -공동주택 철근콘크리트 공종을 중심으로-)

  • Lee, Hyun-Ki;Jeon, Jae-Yong;Park, Sung-Chul;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.87-95
    • /
    • 2008
  • The government wants to apply the construction cost estimating method based on historical data published in the first six months of 2004. Construction companies, however, require the proposed cost estimation model, to be improved which makes it difficult to predict a reasonable construction costs. This paper presents an improved historical data selection model after analyzing the problem of previous method throughout comparing contracted unit prices of reinforced concrete works selected by the previous model to market prices. The model which can select more feasible data would assist participates such as general contractors and sub-contractors to earn a proper profits.

The Strategy for Interconnection Branch Line Construction used Optimization Program (최적화 기법을 적용한 효율적인 철도 연결선 구축 전략)

  • Kim, Yong-seok;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.853-858
    • /
    • 2019
  • One of the methods which can enhance the efficiency of railroad network is construction of interconnection branch line for several route to share one railway. In Korea, this method already has been implemented or excuted as project level. This study suggests a network design model and a solution algorithm to choice most proper site to construction it and determine the priority of branch lines which can be considered in planning level, not project level. The model is a non-linear optimization program which minimize total cost-construction cost, operating cost and passengers' travel cost. The decision variables are a binary variable to explain whether construction or not and its direction and a integer variable of the frequencies of travel routes. The solution algorithm-problem solution and route choice and also the result of implementation for example network are suggested. This result can be more advanced after application in real network and calibration of parameters.

Factors Affecting Selection & Combination of Earthwork Equipments (토공장비 선정 및 조합을 위한 영향요인 연구)

  • Choi, Jae-Hwi;Lee, Dong-Hoon;Kim, Sun-Hyung;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.201-205
    • /
    • 2010
  • Earthwork is an essential initial work discipline in construction projects and open to significant impacts of several factors such as weather, site conditions, soil conditions, underground installations and available construction machinery, calling for careful planning by managers. However, selection and combination of construction machinery and equipment for earthwork still depends on experience or intuition of managers in construction sites, with much room left for proper management in terms of cost, schedule and environmental load control. This research aims to analyze the performance of earthwork equipment and establish relations among various factors affecting a model for optimizing selection and combination of earthwork equipment as a precursor to the development of such model. We expect the conclusions herein to contribute to optimizing selection and combination of earthwork equipment and provide basic inputs for the development of applicable model that can save costs, reduce schedule and mitigate environmental load.

  • PDF

Optimal Inventory Management for Rebar Fabrication Process in Construction Process (건설현장 철근작업 프로세스상의 적정 자재재고 관리 방안에 관한 연구)

  • Jung, Do-Young;Park, Sang-Hyuk;Kwak, Soo-Nam;Kim, Hyoung-Kwan;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.702-707
    • /
    • 2006
  • There have been certain extent of material inventory in construction site because of difficulties in ordering by small quantity, strategy of securing future requirements and prevention of delay. However, carrying these inventory entails a financial cost called inventory holding cost and decrease construction productivity, so proper inventory management in construction industry is important for construction efficiency and cost reduction. This study tries to find analytical method of inventory management. It includes ordering decision which decide how much to order and when to order. Setting these strategies including deciding safety inventory, input and ouput variability are able to controled.

  • PDF

MAINTENANCE COST ANALYSIS FOR LARGE HOSPITAL BUILDINGS

  • Sy-Jye Guo;Tzu-Ping Lo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.310-315
    • /
    • 2009
  • Large hospitals such as medical centers provide not only medical services, but also carry the responsibilities for emergency refuges, medical researches and education. The function of large hospitals is as important as other infrastructure systems such as highways, bridges, and utilities. When disasters occur, the hospitals have to provide emergency medical services for victims and support the patient's needs of health. In order to keep a smooth operation of hospitals, the maintenance management of hospital buildings should be carefully investigated. However, there are few researches focused on maintenance management issues of hospital buildings. This paper investigated the National Taiwan University Hospital (NTUH) and established a maintenance cost database. The NTUH is the best-known and most high-renowned medical center in Taiwan in which more than 4,000 employees serving approximately 2,000 in-patients and 7,000 out-patients daily. The data were collected from the NTUH which consisted of 16,228 maintenance records in the past ten years. This paper analyzed these data to obtain various characteristics of maintenance records, and revealed the key items of maintenance cost for large hospital buildings, which can provide the facility manager of hospital buildings to execute a proper maintenance policy for hospital buildings.

  • PDF

Classification of Water Facility Inventories for the Construction of Water Supply Asset Management System (상수도 자산관리 시스템 구축을 위한 정수시설 인벤토리 분류)

  • Kim, Jinkeun;Lee, Junghoon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.6
    • /
    • pp.651-657
    • /
    • 2015
  • Recently, the need for asset management(AM) plan introduction to reduce increasing O&M cost with aging water facilities is on the rise. Therefore, asset inventory classification is necessary as the first step for AM plan construction. In this study, all assets of YW water treatment plant(WTP) were classified as 5 steps. In addition, specific code name was given to each asset which can increase compatibility in constructing the AM programs among WTPs. In the future, codes for attribute and status of asset will be allocated, which can facilitate proper AM operation.