• Title/Summary/Keyword: Project-Base

Search Result 522, Processing Time 0.045 seconds

Valve induced noise and vibration evaluation procedure for process piping of offshore production facility (Offshore 선 Process 배관계의 밸브 소음/진동 평가 절차)

  • Lee, JooHun;Choi, ChoongYoung;Kim, JaeHong;Kwun, Hyuk
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.04a
    • /
    • pp.201-204
    • /
    • 2014
  • Recent year, the vibration induced fatigue and noise of piping work become critical in offshore hydrocarbon production facilities with increasing requests by major oil company. In this paper, the risk base piping vibration induced fatigue assessment of NORSOK L-002 standard and UK Energy Institute guideline have been introduced with real project application practice. Also the piping breakout noise evaluation by flow restriction devices of compressible and in-compressible flow are reviewed with its practical application on real project.

  • PDF

Development of the vibration control devices and the optimal base-isolation design system for Structures (구조물 진동제어장치 개발 및 최적 면진설계 시스템 개발)

  • Kim, Byung-Hyun;Chung, Jung-Hoon;Moon, Seok-Jun;Huh, Young-Cheol;Chung, Jong-Ahn
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.375-380
    • /
    • 2004
  • Seismic Isolation and Shock/vibration Control Laboratory has performed the National Research Laboratory(NRL) project, 'Design and Application of Control Devices against Earthquake/Shock/Vibration'. In this project, the prototypes of the vibration control devices for structural control against earthquake and wind were developed and verified their performances. And also, the computer programs were developed for the seismic response analysis and the optimum design of the base-isolated structures with vibration control devices. This paper introduces the developed vibration control devices and computer programs.

  • PDF

A study of the integration of the 2D ground water model WHPA with Desktop GIS for ground water well development by basic survey stage (지하수 관정개발 기초조사사업 업무지원을 위한 Desktop GIS와 2D 지하수 모델 WHPA 통합 연구)

  • Kim, Man-Kyu;Jung, Byong-Ho;Lim, Chang-Young;Park, Jong-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2002.10a
    • /
    • pp.257-260
    • /
    • 2002
  • This study develops a GIS-based system which examines the adequacy of the Groundwater development project before the actual designing of the project. Using the system developed here, we can transfer simulation results obtained by WHPA regarding Groundwater levels in new development projects into GIS. We can also judge whether a Groundwater development project should be permitted through examining overlaps of the effects of the development and comparing with other pollutants. Since a two-tiered system which shares DB using inter- and intranets is developed, all the departments in the ministry of agriculture and forest and the agriculture base corporation can share accurate, reliable and latest information related to Groundwater.

  • PDF

Development and Application of Teacher's Evaluation Standard for Environment and Green Growth Project Activity (환경과 녹색성장 프로젝트 활동에 따른 교사용 평가 기준 개발과 적용)

  • Lee, Sung-Hee;Choi, Sun-Young;Kang, Ho-Kam
    • Hwankyungkyoyuk
    • /
    • v.24 no.4
    • /
    • pp.32-40
    • /
    • 2011
  • The purpose of this study was to develop an evaluation standard by which teachers in charge of environment and green growth education could conduct a project activity and examine its applicability. The results were as follows; First, 26 evaluation items were developed through interviews with teachers and expert meetings. These categories were base on 'Theme', 'Planning', 'Result' and 'Presentation', and 'Evaluation' of the project. Second, a reliability test showed that internal consistency of the items was currently high(Cronbach's alpha .8709). To examine the content validity, the project activity was evaluated by 5 different teachers, and the result showed that the evaluation standard developed in this study was a very effective tool for the teachers to do project learning. Third, from the 2011 revised national curriculum, the subject 'Environment' in middle schools would be renamed as 'Environment and Green Growth'. Also, environment project activity would be introduced in the middle school. Therefore, this study had a significant importance in the fact that it provided teachers and students with a practical evaluation standard for the environment and green growth project activity.

  • PDF

A Study on the Factors Affecting Utilization of Life SOC Facilities of Rural Center - In the Case of Base District of Seongjeon-myeon Rural Center Revitalization Project of Gangjin-gun - (농촌중심지 생활SOC시설 이용의 영향요인 연구 - 강진군 성전면 농촌중심지활성화사업 거점지구를 대상으로 -)

  • Kim, Tae Ryang;Kang, Hee Ju;Cho, Joong Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.51-59
    • /
    • 2022
  • The purpose of this study is to provide a plan to promote the use of life SOC facilities by analyzing the factors affecting utilization of life SOC facilities established as part of the rural center revitalization project. To this end, we selected Seongjeon-myeon, Gangjin-gun where the rural center revitalization project was implemented, conducted a survey on residents while analyzing the project details, and analyzed the results. This study revealed that the residents with a cognitive level for the rural center revitalization project and life SOC tended to more actively use the life SOC facilities. Therefore, to boost residents' use of the life SOC facilities, it is necessary to promote their understanding of and interest in the rural center revitalization project in the project implementation phase and have them be sufficiently aware of the facilities by operating pilot programs for residents in each facility and holding local events and festivals. This study will lay a steppingstone for active resident use of life SOC facilities established in rural centers and provide basic data for further research.

UTILITY-BASED PERFORMANCE MEASUREMENT SYSTEM (UBPMS) FOR COMPARISON OF CONSTRUCTION PROJECTS

  • Ki-Hyun Kim;Hee-Sung Cha;Ju-Yeoun Han;Il-Han Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1509-1514
    • /
    • 2009
  • CII BM&M(Benchmarking & Metrics) in USA and DTI(Department of Trade and Industry) in UK have built up systems that enable performance measuring and made the results of performance measurement comparable between projects to utilize them as benchmarking tools. By comparing the results of performance measurement, it is possible to grasp the success level of project management and to establish the direction of management. However, construction projects are much diversified and even those projects with the same work type have different attributes. Therefore, simply comparing the results of project performance measurement without considering the characteristics of projects is not justifiable and affects the reliability of the benchmarking results. Therefore, to solve this problem, this study presents a methodology that makes it possible to compare the individual construction projects considering various characteristics. The benefits and importance of project characteristics to overall project performance will be quantitatively expressed and they will be reflected on the results of performance management. By maximally converting multiple projects with different characteristics into the same projects through a new methodology to convert different projects into the same level utilizing such utility-bases and comparing the performances of those projects, project performance results can be utilized in project management as a tool for more accurate decision making and as a robust benchmarking tool.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.57-64
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

The Rolling Stock operation reliability improvement plan which applies a data base of the RIMS (RIMS 데이타를 활용한 전동차 운행 신뢰성 향상방안)

  • Park, Soo-Choong;Lee, Do-Sun;Jeon, Seo-Tak;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.143-150
    • /
    • 2007
  • RIMS(Rolling Stock Information Maintenance System) was installed in structure which it can analyze the data base in need of credibility maintenance. So it could accumulate real data without repulsion of working spot. Information system was installed not following to system but following to working spot. The development of RIMS project was started from March 29, 2001 and it has been operating from October 12, 2004 in Chang-dong Car depot for light maintenance in charge subway line4. So substantial data base was accumulated for three years. This study calculated all RAMS data by analyzing data base accumulated in RIMS and used in dada base about credibility maintenance and found investigation of propriety, expectation of the life cycle cost, the improvement plan on credibility of sorts of cars and formation about the cycle of repairing and maintenance. This got MKBSF MKBF and MTBF about devices and sorts of line4 Rolling Stocks for it.

  • PDF

A Development of a Web Based Supporting System for Writing Construction Project Specification (Web기반 공사시방서 작성 시스템 개발 방안)

  • Kim Kyoon-Tai;Kim Tae-Song;Koo Jai-Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.501-506
    • /
    • 2001
  • The Korean government established a domestic specification system, and regulated that owner should produced construction project specifications, instead of special provisions, in design phase, January 1998. But in Korea the ability of construction engineers for construction project specification are insufficient. So the government had built up a database of standard specifications and developed a supporting system for writing construction project specification(SPECMAKE) in 1999. However, it is a PC base stand-alone system, so it is not convenient to update the database. In order to overcome these limitations, the purpose of this paper builds up a database of construction criteria and develops a automatic writing system for construction project specification on web base. The database contains standard specifications, design and construction guidelines related with construction business. And this paper describes the frameworks, the components, and the functions of the specifications writing system for the construction projects.

  • PDF

LTE Base Station Power Saving Mechanism using Delay Information (Delay 정보를 이용한 LTE 기지국의 Power Saving 메커니즘)

  • Lee, Seung-Hwan;Rhee, Seung-Hyong;Choi, Yong-Hoon;Park, Su-Won
    • Journal of KIISE:Information Networking
    • /
    • v.37 no.3
    • /
    • pp.243-248
    • /
    • 2010
  • This thesis proposes a power saving MAC protocol for LTE base station which utilizes different graded DRX/DTX(Discontinuous. Reception/Transmission) that specified by 3GPP(Third Generation Partnership Project). Considering QoS in UE, proposed MAC protocol controls adaptive DRX/DTX cycle. When Packet delay of UE is less than normal time, LTE base station economize power by increasing DRX/DTX. When Packet delay of UE is more than normal time, delay of UE is decreased by guaranteed QoS. It depends on the traffic which is sent by UE. The proposed method is more improve power saving performance than another method which is unchanged DRX/DTX by conditions. Especially when set DRX/DTX up in conditions, it will meet the requirements of UE. In this thesis, I propose an power saving MAC protocol in an environment where LTE base station are communicated with UE and prove improvement in performance through simulations.