• Title/Summary/Keyword: Project selection efficiency

Search Result 66, Processing Time 0.029 seconds

Development of R&D Project Selection Model and Web-based R&D Project Selection System using Hybrid DEA/AHP Model (DEA/AHP 모형을 이용한 R&D 프로젝트 선정모형 및 Web 기반 R&D 프로젝트 선정시스템 개발)

  • Lee, Deok-Joo;Bae, Sungsik;Kang, Jinsoo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.1
    • /
    • pp.18-28
    • /
    • 2006
  • Some issues which should be considered in an R&D project selection problem are as follows: First, quantitative analysis on the efficiencies of R&D projects is required to guarantee objective validity in the evaluation of the projects. For this reason, the methodology for selecting R&D projects should be based on mathematical models that perform quantitative analysis. Second, in general there are ordinal factors like Likert-scale in the data for evaluating R&D projects. Previous researches, however, couldn't suggest explicit methods incorporating these ordinal factors into models. Third, for the R&D project selection problems with limited resources like budget, it is necessary to decide the perfect ranking of the all projects. This paper develops a mathematical model that can be applicable to the problems of selecting R&D projects with the previous features. In this paper, we improve the original DEA model for evaluating efficiency to incorporate ordinal factors and suggest a new model which can decide the perfect ranking of all projects by merging the improved DEA model and AHP method. Furthermore a web-based R&D project selection system using the DEA/AHP model suggested in this paper is developed and illustrated.

A Study on the IT Project Selection Considering Budget Constraints (예산제약을 고려한 IT프로젝트 선정 모델 연구)

  • Park, Jaehee;Cho, Nam-Wook;Kim, Wooje
    • The Journal of Society for e-Business Studies
    • /
    • v.18 no.4
    • /
    • pp.327-338
    • /
    • 2013
  • Effective and efficient selection of IT projects is crucial for company's competitiveness. The selection of IT projects usually involves consideration of budget constraints but existing IT project selection models often neglect budget constraints. This paper presents an IT project selection model which considers budget constraints. AHP(Analytic Hierarchy Process) and Knapsack problem model have been combined to develop the proposed model, AHP-K model, where AHP is used to estimate weights of selection criteria and, then, a knapsack problem model is utilized to optimize selection of IT project while meeting the budget constraints. In this paper, a case study is provided to validate the effectiveness of the proposed AHP-K model. It has been shown that the proposed AHP-K model is better than the AHP model in terms of total utility of projects and investment efficiency.

Considering Service Factors in R&D Project Selection: Telecommunications and Broadcasting Convergence in Korea

  • Jun, Hyo-Jung;Kim, Tae-Sung;Yeon, Seung-Jun;Ha, Won-Gyu
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.6B
    • /
    • pp.631-641
    • /
    • 2011
  • Digital Multimedia Broadcasting (DMB) and Internet Protocol Television (IPTV) are now in commercial service, tearing down the traditional boundaries between the telecommunications and broadcasting sectors. These latest developments also hold important implications for research projects in related areas. Both telecommunications and broadcasting being fields with a strong service orientation, market demand should be the primary consideration when selecting research and development (R&D) projects in these areas. This study presents a process for selecting converged telecommunications-broadcasting technology development projects from a demand-oriented perspective, using criteria that are based on projected future demand characteristics. Aimed at increasing the efficiency of the R&D project selection process in telecommunications and broadcasting convergence, this study can point out new directions in R&D management in this field.

A Study on R&D Project Planning Selection Evaluation Indicators based on CIPP model (CIPP모형을 활용한 R&D과제기획 선정평가 도구 개발 연구 : K연구원 중심으로)

  • Hyun-Ku Min
    • Journal of Technology Innovation
    • /
    • v.31 no.3
    • /
    • pp.171-199
    • /
    • 2023
  • The purpose of this study was to develop an evaluation tool for selecting new projects for R&D project planning level of K Research Institute. For this purpose, items and questions for R&D project selection evaluation were developed based on the CIPP model and previous studies on selection evaluation and evaluation indicators for research project evaluation, and then two Delphi surveys were conducted. The developed evaluation tool was surveyed by 13 experts to verify contents validity ratio, convergence and consensus. The finally selected evaluation tool for R&D project planning consisted of 21 questions in 8 items, including 5 questions for context evaluation, 2 questions for input evaluation, 8 questions for process evaluation, and 6 questions for product evaluation. The evaluation tool developed will contribute to the solution of problems in the bottom-up planning process and to the improvement of the planning competence of the researchers. It will also contribute to improve the consistency and efficiency of evaluation during the selection process.

Construction of "CIDEAR" Model for Selecting and Evaluating Cross Impact R & D Projects (상호영향형 R&D과제군의 평가산정을 위한 "CIDEAR" 모형의 개발)

  • Kwon Cheol Shin;Park Joon Ho;Hong Seok Ki
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.29 no.3
    • /
    • pp.41-61
    • /
    • 2004
  • The purpose of this paper is to construct $\ulcorner$CIDEAR(Cross Impact-DEA-AR)$\lrcorner$ model which evaluates proposed R&D projects considering cross impact among them and selects proper projects to utilize resources efficiently as well as to maximize efficacy of investments. For this purpose, $\ulcorner$CIDEAR$\lrcorner$ model is designed as the following six steps. $\ulcorner$Decision Theory Evaluation Model$\lrcorner$ is for setting and selecting the evaluation items according to the structured procedure of evaluation system. The priority of items is decided at $\ulcorner$AR Decision Model$\lrcorner$$\ulcorner$Cross Impact Estimation Model$\lrcorner$ is for computing the final probability of success and the result is used to revise the evaluation results of $\ulcorner$Decision Theory Evaluation Model$\lrcorner$. $\ulcorner$Resource Performance Analysis Model$\lrcorner$ classifies the proposed R&D projects on the basis of required resources and expected performance. Consequently, the possibility of bias of project selection can be prevented. $\ulcorner$Priority Oder Decision Model$\lrcorner$ is for computing the efficacy of proposed projects. Finally, $\ulcorner$Efficacy-Efficiency Cause Analysis Model$\lrcorner$ analyzes the structure of efficacy and efficiency of the projects. The major findings and significances of this study are summarized as follows: (1) $\ulcorner$CIDEAR$\lrcorner$ model can deal with the affairs of R&D projects having the characteristics of mutual independence as well as mutual dependence in the point of efficacy and efficiency. Hence, it is possible to evaluate and select R&D projects more accurately. (2) It can be possible to raise the possibility of projects success. R&D manager can use the information for project management because the efficacy-efficiency structure of selected projects can be analyzed. (3) We proved the usefulness of the constructed $\ulcorner$CIDEAR$\lrcorner$ model using an case about twenty-one R&D projects of a leading company of electronic industry in Korea.

Critical Factors of Subcontractor Evaluation and Selection: A Case Study in Vietnam

  • VO, Khoa Dang;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;LE, Loan Phuc;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.3
    • /
    • pp.297-305
    • /
    • 2021
  • A contractor or a main contractor is a company with full capacity to construct all project's works for the owner. A subcontractor is an organization that works with the main contractor to execute and complete work packages for the project. Selecting an effective subcontractor will help the efficiency and success of any projects in the construction industry. Therefore, this study identified subcontractor evaluation factors in Vietnam by collecting questionnaire survey data from engineers and staffs in the construction industry project environment. An exploratory factor analysis (EFA) was then performed to identify the critical factors when evaluating and selecting the subcontractor in construction projects. Moreover, when considering the impact level in terms of the average value, the research results showed that the most critical concern was the subcontractor's reputation. Furthermore, the top five factors affecting the sub-contractor evaluation and selection are (i) reputation, (ii) price, (iii) construction techniques, (iv) ability to implement projects according to commitments, and (v) subcontractor competence (the team of workers, technician staff, engineers with full capacity according to regulations). These research results provide an overall perspective that will help main contractors develop suitable subcontractors' evaluation and selection factors in their projects in the construction industry.

Efficiency Analysis for R&D Management according to Operation Type of Funding Agencies (연구관리전문기관의 사업형태에 따른 국가R&D 사업관리 효율성 분석)

  • Lee, Sang-hyuk;Kim, Yun Bae
    • Journal of Korea Technology Innovation Society
    • /
    • v.21 no.4
    • /
    • pp.1345-1365
    • /
    • 2018
  • Following principal-agent relationship between government and funding agency effects on efficiency and management of project, this paper suppose that project management cost rate variable on outsourcing and administration of institution, applies multiple regression analysis and logit analysis by using factors that procurement status of institutional operating expenses and each subordinates scale (Budget, subject number) and method (Top-down/Bottom-up), not a total amount, for examining factors following project efficiency analysis and way of commission. The major variables which effect on efficiency of institution are management cost scale (0.36), institutional operating expenses ratio (-0.47), way of outsourcing, the factors that affect way of outsourcing are portion of project management cost (-38.5) and institutional operating expenses rate (-11.7). This means both legal and financial stability are necessary and it is avoidable moral hazard and adverse selection on principal-agent problem.

Feasibility Study for the cross border transmission project in Cambodia (캄보디아 국경연계 송전망 타당성 연구)

  • Baek, S.D.;Kim, J.H.;Kim, S.H.;Choi, S.J.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.38-39
    • /
    • 2006
  • KEPCO is executing a project in Cambodia consisting of two components, "Power Development Master Plan and Institutional Strengthening" and "Greater Mekong Sub-region (GMS) Power Project Preparation" upon request by the government of the Ministry of Industry, Mines and Energy of Cambodia, contracted on $29^{th}$ September 2005. This paper includes a basic design and review of economical efficiency for constructing the two (2) cross border 115 kV transmission lines, which run from the border of Vietnam and Laos to Cambodia, and four (4) 115kV substations. The main contents of the paper include the process of design and results of a review of line route selection, tower and hardware design regarding transmission line design, as well as the type of substation, and arrangement and specifications of equipment with expects to substation design. Also, long-term demand forecasting, and an economic analysis of the project area are included.

  • PDF

Uncertainty assessment caused by GCMs selection on hydrologic studies

  • Ghafouri-Azar, Mona;Bae, Deg-Hyo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.151-151
    • /
    • 2018
  • The present study is aimed to quantifying the uncertainty in the general circulation model (GCM) selection and its impacts on hydrology studies in the basins. For this reason, 13 GCMs was selected among the 26 GCM models of the Fifth Assessment Report (AR5) scenarios. Then, the climate data and hydrologic data with two Representative Concentration Pathways (RCPs) of the best model (INMCM4) and worst model (HadGEM2-AO) were compared to understand the uncertainty associated with GCM models. In order to project the runoff, the Precipitation-Runoff Modelling System (PRMS) was driven to simulate daily river discharge by using daily precipitation, maximum and minimum temperature as inputs of this model. For simulating the discharge, the model has been calibrated and validated for daily data. Root mean square error (RMSE) and Nash-Sutcliffe Efficiency (NSE) were applied as evaluation criteria. Then parameters of the model were applied for the periods 2011-2040, and 2070-2099 to project the future discharge the five large basins of South Korea. Then, uncertainty caused by projected temperature, precipitation and runoff changes were compared in seasonal and annual time scale for two future periods and RCPs compared to the reference period (1976-2005). The findings of this study indicated that more caution will be needed for selecting the GCMs and using the results of the climate change analysis.

  • PDF

Improvement of Architecture-Engineering Service Procurement System for Public Construction Project (건설기술용역 발주 및 입·낙찰 방식의 문제점 및 개선방안)

  • Kim, Sung-Il;Chang, Chul-Ki;Park, Dae-Keun;Bae, Yu-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.61-70
    • /
    • 2014
  • Various procurement systems for Architecture-Engineering service for public construction project are currently established by construction-related law. However, comprehensive framework and criteria for the selection of Architecture-Engineering firm are in absence. Even though various selection methods for Architecture-Engineering service are currently established by law, cost-based selection method is mainly used in selecting Architecture-Engineering firm for the service. This paper examined current use of procurement system for Architecture-Engineering service and drew problems in practice. Through analysis of problems and bench-marking of those systems in advanced countries and international organizations, several strategies to improve performance of Architecture-Engineering service and to maximize the efficiency were suggested. The suggestions include framework and guideline to select a procurement method for the service which is being considered for the project and way of improving current procurement system. These suggestions will be a foundation for utilizing appropriate procurement system for the specific project and can make domestic Architecture-Engineering firm more competitive in the global market by breaking form the cost-based selection method in the selection of Architecture-Engineering firms.