• 제목/요약/키워드: Project risk

검색결과 1,189건 처리시간 0.027초

소프트웨어 개발 프로젝트에서 수행의 지속행위에 관한 연구 : 문화적 차이의 관점에서 (A Study on Escalation of Commitment Behavior in Software Projects : The Perspective of Cultural Differences)

  • 김인재;심형섭;김종은
    • Journal of Information Technology Applications and Management
    • /
    • 제11권2호
    • /
    • pp.1-14
    • /
    • 2004
  • The level of sunk cost and risk-taking theory have been offered as one explanation for the escalation of commitment behavior. This Study attempted to replicate Keil's study in Korea. Keil examined the level of sunk cost associated with the risk propensity and risk perception of decision-makers, and these factors are assessed for cross-cultural robustness using matching laboratory experiments carried out in three countries. The level of sunk cost and the risk perception of decision-makers contributed significantly to their continuous willingness to their project. Moreover, the risk propensity of decision-makers was inversely related to risk perception, and this inverse relationship was significantly more weak in Korea than in Singapore. These results show that the sunk-cost effect exists across cultures, and that the risk-taking behaviors are partially mediated by cultural factors.

  • PDF

Risk-Taking Decisions with Major IS Investment;System Downsizing Case

  • Shim, Seon-Young;Lee, Byung-Tae
    • 한국경영정보학회:학술대회논문집
    • /
    • 한국경영정보학회 2007년도 International Conference
    • /
    • pp.339-344
    • /
    • 2007
  • In the cut-throat competitive environment of business, large-scale IS investment is becoming inevitable strategic necessity for gaining competitive advantage. However. it bears great deal of risk over all the associated processes so that the investment decisions need to be taken in a greatly careful manner. Nonetheless, Korean organizations are prominently showing risk taking behaviors regarding major is investment, in terms of system downsizing. Although decision theory argues decision makers' rational choice of options through the assessment of risk and benefit, the notable trend toward system downsizing in Korea defies common understandings on IS project risk. Furthermore, it encourages us to investigate many impenetrable characteristics underlying organizational risk taking decisions with IS investment. We found out that there is Significant effect of IS decision makers' risk propensity when they make system downsizing decisions. Moreover. we Identified that IS decision makers do not get a strong pressure of cost savings and have tendencies to mimic competitor's decisions.

  • PDF

재해위험도와 보수보강비용을 고려한 급경사지 옹벽의 투자 우선순위 결정방법 연구 (Investment Prioritization Method for Steep Slope Retaining Wall Considering the Disaster Risk and the Repair and Reinforcement Cost)

  • 최재순;신연주;백우현
    • 한국지반공학회논문집
    • /
    • 제38권12호
    • /
    • pp.79-89
    • /
    • 2022
  • 매해 여름, 우리 나라에서는 집중호우로 인해 급경사지 옹벽이 붕괴되는 사고가 발생하고 있다. 2019년 급경사지 위험도 평가결과에 대한 데이터를 보면, 780여개소의 옹벽이 C등급 이하로 이에 대한 대책마련이 시급한 실정이다. 그러나, 이러한 옹벽에 대한 보수보강 예산이 한정적이므로 투자 우선순위에 대한 논의가 필요하다. 이 연구에서는 개정된 급경사지 옹벽의 위험도 평가기준에 대한 고찰과 함께 네트워크 레벨 및 프로젝트 레벨에서의 우선순위방법을 제안하고 이에 대해 6개 옹벽을 대상으로 적용성 검토를 수행하였다. 이때, 프로젝트 레벨에서의 우선순위 결정에는 실제 투입된 보수보강비용자료를 이용하여 우선순위 지수를 결정하였다.

리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 - (Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects -)

  • 조규만;김태훈
    • 한국건축시공학회지
    • /
    • 제18권4호
    • /
    • pp.385-394
    • /
    • 2018
  • 오피스 건축물의 리모델링 사업에서, 신축과는 다른 리모델링 사업의 다양한 리스크로 인해 공기가 지연되는 사례가 빈번하게 보고되고 있다. 이에 본 연구에서는 리모델링 프로젝트의 리스크 요인들과 리모델링 공사의 작업별 공기지연 발생가능성의 관계를 분석하고자 수행되었다. 리모델링 사업의 경험이 있는 29명의 전문가 면담결과의 과학적 통계적 분석을 통해, 리모델링 사업의 리스크 요인과 그로 인한 작업별 공기지연 가능성을 크게 3가지 측면에서 분석하였다. 즉, (i) 리모델링 공사의 작업별 공기지연 가능성, (ii) 리모델링 공사의 리스크 요인별 중요도, (iii) 리모델링 공사의 공기지연에 영향을 미치는 리스크 요인 등 세가지 분석결과를 제시하였다.

BTL 민간투자사업의 리스크인자에 대한 영향도 분석 (An Effect Analysis of Risk Factors for Build Transfer Lease Projects)

  • 이양우;김수용;박영민
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.58-63
    • /
    • 2006
  • BTL 방식의 민간투자사업의 경우 많은 관심과 정부의 추진의지에 의해 급성장을 하고 있음에도 불구하고 도입당시 예상치 못했던 다양한 문제점같이 나타나고 있는 실정이다. 이에 본 연구에서는 이러한 문제점들 중 사업 전(全)단계에 걸쳐 발생할 수 있는 리스크에 대한 관리 능력 및 관리 계획을 개선하기 위하여 리스크 인자별 프로젝트에 대한 영향도를 실제 사례에 대한 민감도 분석을 통하여 제시하고자 하였다. 본 연구는 향후 민간투자사업의 리스크관리에 대한 대처 방안을 연구하는데 있어 리스크 관리의 우선순위를 제시해 줄 수 있을 뿐 아니라 위험이 사업에 미치는 영향을 구조화함으로써 주무관청과 민간사업자 사이에서 발생할 수 있는 리스크분담에 대한 기준을 제시해 줄 수 있을 것으로 판단된다.

  • PDF

성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 - (A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK -)

  • 강신봉;김승철
    • 한국건설관리학회논문집
    • /
    • 제17권1호
    • /
    • pp.48-55
    • /
    • 2016
  • 본 연구는 성공적인 해외건설프로젝트 수행을 위한 리스크 관리 계획 절차를 구축하여 활용방안을 제안하는 것을 목적으로 한다. 접근방법은 해외건설산업의 현황을 살펴보고, 영국의 프로젝트관리 체계인PRINCE2의 리스크 관리 기법의 적용과 국내 해외 건설사들의 리스크 관리 수행사례를 분석하였다. 이를 토대로 리스크 관리를 위한 해외건설사의 조직 구성과 업무프로세스를 제안하고, 리스크 관리 계획. 절차를 개발하여, 해외건설 프로젝트에 적용하였다. 그 결과, 리스크 관리와 계약관리를 효과적으로 수행할 수 있게 되었다. 본 연구의 결과는 향후 글로벌 건설기업으로 진화를 위한 해외건설사의 해외건설프로젝트 사업 능력 향상을 위해 유용하게 활용 될 수 있을 것으로 판단된다

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • 제10권1호
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계 (Design of maturity model for software project management level evaluation)

  • 전순천
    • 한국항행학회논문지
    • /
    • 제15권4호
    • /
    • pp.609-615
    • /
    • 2011
  • 최근 공공기관 및 금융권에서는 경쟁력 향상을 위한 정보시스템의 통합으로 프로젝트 규모가 대형화되고 있으며, 프로젝트 수도 나날이 증가하고 있어 적절한 소프트웨어 프로젝트 관리 방안이 필요하다. 그러나 프로젝트 관리 영역간의 미치는 영향에 대하여 체계적인 연구가 부족하였다. 따라서 본 연구는 선행 연구를 통하여 프로젝트 관리에 중요한 영역을 도출하였고, "범위, 일정, 품질, 인력, 위험"의 각 영역들 간의 상호 미치는 영향도 분석과 각 영역의 진행 상태를 계획, 실행, 완료 단계로 구분하여 수행도를 분석하였다. 이 영향도와 수행도의 결과를 분석하여 프로젝트 관리 수준을 평가하는 모델을 제시하였다.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

해외 탄소저감 사업의 위험요소를 고려한 사업 경제성 변동 분석 (A Study on Variation of Economic Value of Overseas Carbon Reduction Projects with Risk Factors)

  • 박종열;좌성훈
    • 한국건설관리학회논문집
    • /
    • 제24권6호
    • /
    • pp.45-52
    • /
    • 2023
  • 최근 온실가스에 의한 기후변화가 심화하고 있어, 국제사회는 UN 기후변화협약을 통해 온실가스 감축 노력을 경주하고 있다. 본 연구는 해외 탄소저감 사업에 투자함에 있어 고려해야할 위험요소 및 투자 판단의 방법론을 제시함을 목적으로 한다. 이를 위해 2건의 실제 해외 프로젝트 사례를 연구 대상으로 선정하였다. 분석 방법으로는 주요 위험요소의 데이터를 확률분포로 정의하고 이를 경제성 분석 모델에 적용하여 몬테카를로(Monte Carlo) 시뮬레이션 방법으로 사업의 순현재가치를 확률적으로 추정하였다. 또한, 정책적 변화에 따른 순현재가치의 변동 범위를 분석하였다. 그 결과 A 프로젝트의 순현재가치는 기본 가정하의 확정적 값보다 평균값이 19% 하향하였고, 음(-)의 순현재가치를 나태낼 확률이 12.2%로 나타났다. B 프로젝트의 경우 평균값이 12.5% 하향, 음(-)의 순현 재가치 확률은 1% 미만으로 나타났다. 정책적 변화를 고려하면 A 프로젝트는 총 탄소배출권 발생량 대비 72.9% 이상을 획득하여야 경제적 이득을 취할 수 있으며, B 프로젝트의 경우 49.5% 이상을 획득하면 경제성이 있는 것으로 나타났다. 이러한 분석 결과로써 A 프로젝트 사례는 기본가정 하의 확정적 순현재가치보다 평균값이 현저히 하향하여, 주요 위험요인의 변동에 따라 투자결정에 유의가 필요하며, 정책적 변화를 고려하면 탄소배출권 분배 비율을 프로젝트 규모에 따라 차등 적용해야한다는 정책적 시사점을 구체적으로 제시하였다.