Suggestion for Collaboration-Based UI/UX Development Model through Risk Analysis

  • Cho, Seong-Hwan;Kim, Seung-Hee
    • Journal of Information Processing Systems
    • /
    • v.16 no.6
    • /
    • pp.1372-1390
    • /
    • 2020
  • An attractive user interface (UI) design with a clear user experience (UX) is the key for the success of applications. Therefore software development projects require very close collaboration between SI developers and front-end service developers. However, methodologies for software development only exist with inadequate development processes or work standards for collaboration. This survey derived 13 risk factors in developing UI/UX from 113 risk factors of IT projects through a questionnaire and factor analysis and proposed a collaboration-based UI/UX development model that can eliminate or mitigate six risks with high weights and reliability. To extract risk factors with high reliability, factor and reliability were analyzed to extract 13 major risks, and based on the expert opinions and the results of correlation analysis, UI/UX development stages were classified into planning, design, and implementation. The causal relationships between risks were verified through regression analysis. This study is the first to expertly analyze major risks based on collaboration in UI/UX development and derive a theoretical basis that can be used in project risk management. These findings are expected to provide a basis for research on development methodologies for higher levels of front-end services and to construct rational collaboration systems between SI practitioners and front-end service providers.

A Model of the Construction Risk Management System for Site Personnel in the Construction Project (건설현장 실무자를 위한 건설공사 위험관리시스템 모델)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.90-98
    • /
    • 2007
  • Although the construction industry has been rapidly increased at its size and technologies as a locomotive of the economy development in Korea, most construction companies have not paid their attention on the construction risks seriously. However, they have been experienced a lot of business deterioration and project instability during the IMF crisis and WTO entry, and trying to figure out a way to manage the construction intrinsic risks systematically. Some top ranked construction companies have already developed and been implementing a risk management system for the oversea construction projects applying for the marketing and bidding stage, but not for the domestic construction projects during construction phase yet. This paper proposes a construction risk management system model for the site personnel to understand and manipulate very easily in the construction project.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

An Establishment of the Situational Application Criteria on the Risk Management Technique in the Construction Project (건설공사 위험관리 기법의 상황별 적용기준 정립)

  • Kwon Soon-O;Yoon Chul-Sung;Chu Hae-Keum;Kim Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.228-231
    • /
    • 2004
  • Recently, a risk management in the construction project is getting more important. But the field application cases of risk management and its performance level that have been worked in the construction field are so rare and poor, because an application criteria on the risk management technique is not established systematically. So in order to apply of risk management in the field more successfully, it is necessary to optimize the technique of situational application on the risk management. The purpose of this study proposes the optimized application criteria in the field risk management based on the three categories such as historical data, experts, and analysis time.

  • PDF

Process for Risk Severity Estimation of Weapon System Development Project using Parametric Estimation Method/Linear Kalman Filter (모수 추정기법/선형 칼만 필터를 이용한 무기체계개발 프로젝트 위험 요소의 영향도 추정 프로세스)

  • Lee, Seung-Yup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.567-574
    • /
    • 2018
  • Risk management is a method to 1) identify risks that can adversely affect the cost, schedule, and target achievement performance of a system development project, and 2) manage the identified risks based on the severity and likelihood assigned to each risk item. Risk management is applicable to various fields, since it can manage the cost/schedule and effectively guides accomplishing the target performance by identifying and managing the risks in advance, which necessitates many concurrent studies. This paper proposes a procedure to estimate the severity value for a risk item using a Kalman filter. It is assumed that the severity can be expressed as an equation consisting of cost/schedule loss during the risk event. A linear Kalman filter is used to reduce the error between the true and estimated values, which can eventually save resources spent on the risk management procedure. A simulation test case was conducted to demonstrate the validity of the proposed method.

Risk Factors Analysis and Quantitative Risk Assessment Model for Plant Construction Project (플랜트 건설 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구)

  • Ahn, Sung-Jin;Kim, Tae-Hui;Nam, Kyung-Yong;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2019
  • Due to the increasing demand for and complexity of plant construction projects, unpredictable risk factors are on the consequent increase. For that reason, the quantitative risk analysis is being called for, in order for the development of a risk assessment model using risk indicators for the plant construction projects. This study used the claim payout data collected at a global insurance company to reflect the actual financial losses in plant construction projects as dependent variables in the risk assessment model. In terms of independent variables, the geographic information, i. e., landform, and the construction information including test-run, schedule rate, total cost and duration are adopted. In addition, this study suggests that the regression model containing such independent variables that are statistically significant can be applied to as a foundational guideline for the plant construction project risk analysis during the phase of construction and commissioning.

A Case Study on the Risk Management for the Long-term Preservation Business Activities Related to Electronic Records (전자기록 장기보존 위험관리 사례)

  • Yim, Jin-Hee
    • The Korean Journal of Archival Studies
    • /
    • no.39
    • /
    • pp.3-43
    • /
    • 2014
  • This paper showed results of the risk management project in detail which was conducted by National Archives of Korea(NAK) in 2010. In the project NAK examined its long-term preservation business of electronic records using DRAMBORA(Digital Repository Audit Method Based on Risk Assessment). NAK has defined 44 different risk elements related to its business activities, assessed and classified them into several grades according to the severity calculated by risk probability score and risk potential impact score, and developed precise management plans for two of the most serious risks. This paper introduced the management plan for one of them. The risk was numbered with NR04 and described by 'Loss of integrity of records information'. This paper explained mitigation strategies, contingency organization, disaster control responsibilities, and personal mission cards for the NR04. This paper planned to give comprehensive understandings to Records Management Organizations about the risk management approaches as an effective way for business management through the case study.

Estimation of Key Risk Management Factors for Construction Projects Based on Kano Model (Kano 모델 기반 건설프로젝트 핵심 리스크관리 요인 도출)

  • Cho, Jin-ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.239-248
    • /
    • 2022
  • Risks in construction projects are increasing remarkably due to recent changes in the construction environment. Active risk management is required to recognize risks as opportunities. The purpose of this study is to propose a risk management model of the importance determination method through comparative analysis using Kano model, Timko CSC (Customer Satisfaction Coefficient), and ASC (Average Satisfaction Coefficient). Based on previous studies, the validity of risk management factor determination is reviewed through a questionnaire modified Kano model through interviews with working-level workers using the Delphi technique. Through this, a suitable risk management model is presented by selecting key risk management factors recognized by domestic construction project practitioners. As a result of the study, the Kano model developed to verify risk management of construction projects was evaluated to be effective in verifying the risk management of practitioners. It is expected that the Kano model presented in this study will be actively used to verify the importance of risk management for construction projects.