• Title/Summary/Keyword: Project priority

Search Result 406, Processing Time 0.024 seconds

GIS구축 계획에 대한 경영학적 접근 - 포항시 사례를 중심으로-

  • 조대연;권오병
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.350-353
    • /
    • 1998
  • Recently, local governments have started projects of implementing Geographic Information Systems (GIS) as an infrastructure for the collection, storage, and analysis of the spatial information. So far, these projects have been approached from the areas such as the civil engineering and the computer science perspectives. Nonetheless, in order for a GIS project to be successful, it should be approached from the management perspectives as well. In this paper, the authors discusses about the management issues such as the determination of priority of the sub-projects, the organizational structure that takes charge of the project and the evaluation of the performance of the project.

  • PDF

A Study on Relative Importance of Project team members Competencies Using AHP (AHP를 활용한 프로젝트 팀 구성원의 개인역량 상대적 중요도 연구)

  • Kim, Yeoungdae;Lee, Jinah;Oh, Minjeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.216-227
    • /
    • 2020
  • The purpose of this paper is to identify a relative importance and priority of the factors of Competencies of project team member. It aims to present the differential competency factors from a differentiated perspective by applying the Leadership Development Questionnaire, which is the competency dimension required for manager, to team member. (1) Background: The diverse needs of customers and companies, and the uncertainty, complexity, ambiguity, and volatility of the environment surrounding the company in the era of the Fourth Industrial Revolution threaten the survival of company. In this respect, companies should implement the project management approach and strive to increase the capabilities of each team member. (2) Methods: AHP method was used to prioritize which factors were considered more importance level and the gap of relative importance level between project manager group and team members group. (3) Results: In the analysis of the relative importance of the upper class, weights were derived in the order of managerial competence, intellectual competence, and emotional competence. The sub-factor that respondents prioritize was communication as the 1st priority, and it was analyzed in the order of strategic perspective, achieving, critical analysis and judgement, and vision and imagination. There were some differences in the ranking of the relative importance of achieving and vision and imagination attributes between the PM group and TM group, it was analyzed that there was no significant difference overall. (4) Implications: The results of this study confirmed the recognition that team members are required to have the same competencies as the project manager. And based on the priorities of the competencies required of team members, companies are expected to cultivate professional and competent team members, and expand the roles and authority of team members so that they can actively carry out projects.

An Analysis on the Prospects and Realities of Local Governments' Project Promotions according to the Changes in Financial Policy of Agricultural Infrastructure Improvement Projects (농업기반정비사업의 재정정책변화에 따른 지방자치단체의 사업추진 전망 및 실태 분석)

  • Bae, Seung-Jong;Kim, Dae-Sik;Kim, Soo-Jin;Kim, Seong-Pil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.5
    • /
    • pp.49-55
    • /
    • 2019
  • This study attempted to investigate the changes in the perception of local government officials about agricultural infrastructure improvement projects due to the financial policy changes. A total of 141 local government officials were surveyed on the priority, the current status of the agricultural infrastructure improvement projects. Irrigation facilities renovation project and Small drainage improvement project had generally high priority, while Support project of cultivation basis for upland crops in paddy, Large scale land readjustment project, and Upland infrastructure improvement project had low priorities. After the introduction of the block grant system, agricultural infrastructure improvement projects had often been conducted by collecting opinions from local residents. The officials in charge of local governments recognized that the agricultural infrastructure improvement projects were reduced due to lack of financial resources and project potential sites. In response to the changes in the agricultural infrastructure improvement projects, most of the surveys showed that the influence of cities and provinces was strengthened. In addition, respondents most needed to improve the subsidy rate and there were a large number of cases requiring differential support to meet the characteristics of the local government. Therefore, it will be necessary to present a new perspective on the agricultural infrastructure improvement projects and to suggest differentiated projects for each regions.

Critical Criteria Based on Facility Condition Index for Supporting Priority Decision-making in Educational Facilities

  • Shin, Seung Woo;Yi, June Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.687-688
    • /
    • 2015
  • The objective of identifying the cause of inconsistency in determining priority of educational facility maintenance, any related factors were thoroughly identified and tested, to see if it has any effect on decision-making process in resource allocation for educational facilities. On the assumption that 'the more there are to be repaired/maintained and deferred, the higher the relevant cost will be, this will lead to a significant social loss. Accordingly, this study established a framework of determining resource allocation priority based on deferred maintenance and its related expenses. For doing so, it was required to determine relative ranking in terms of resource allocation within a pre-assigned school district, in consideration of the criticality of each deferred maintenance attribute/variable.

  • PDF

A Study on Building the Regional Cluster: The Case of Fire and Emergency Industrial Cluster in Samcheok-si

  • Lee, Dong-Kyu;Yang, Gi-Geun
    • International Journal of Contents
    • /
    • v.5 no.3
    • /
    • pp.57-64
    • /
    • 2009
  • Korea has relied on top down development method, in which companies, research and education institutions move into the industrial complexes established by the government. However, to improve local competitiveness, the paradigm is shifting from the government initiated industrial complex to the clusters based on the cooperative network of the region. Representative case is 'Samcheok-si Fire & Emergency industry cluster construction project' that begun in 2007. AHP technique analysis results on first-stage showed that priority was on policy and network elements, and the results of second-stage analysis show that priority was on Policy incentives to internationalize the cluster and strengthen link,. Cluster branding, Sharing of organizational culture to cope with changes in environment, Creation of group learning culture. The subject of this research is limited to Samcheok-si's the Fire and Emergency Industry cluster formation project. Therefore, the research area and standard should be expanded to increase generality in further researches.

The Impact of Difference of Linkages between Manufacturing Strategy and Action Plans - An Empirical Comparison of U.S. and Korean Manufacturers -

  • Lee, Sang-Gun;Lee, Choong-Kwon;Park, Boo-Ho
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.5 no.4
    • /
    • pp.81-93
    • /
    • 2000
  • It is important to find the competitive priority, which makes a great contribution to the action plans. The reason is that this makes it possible to provide Korean manufacturers with effective behavioral model to break through the depression after 1997'financial crisis in Korea. Focused priority has become a focus of organizations faced with the need to survive in a highly uncertain business environment characterized by rapid technological change, global competition, and demanding customers. Many believe that better linkages of priority and action plans are fundamental to surviving in the world market. However, there was little previous research dealing with the relationship between the strategic priority and action plans in the view of competitive weapon. This study presents empirical findings on differences between U.S. and Korean manufacturing approach to relationship of priority and plans. Specially, Korean manufacturers are eager for good model to overcome depression of 1997' financial crisis in Korea. Data was collected as part of the Manufacturing Futures Project completed in 1996. The results indicate that U.S. manufacturers maintain focused linkages from priority to action plans than do Korean manufacturers.

  • PDF

A Study of Priority Setting of Healthy City Project Indicators with the use of AHP Model (계층 분석적 의사결정 방법(AHP)에 의한 건강도시 사업 평가기준의 우선순위 결정에 관한 연구)

  • Park, Myung-Bae;Nam, Eun-Woo;Lee, Hae-Jong;Shin, Taek-Su
    • Korean Journal of Health Education and Promotion
    • /
    • v.25 no.3
    • /
    • pp.139-151
    • /
    • 2008
  • Objectives: Since 2000 interests in Healthy City Project has been growing fast in Korea. Amid this atmosphere, the need for establishing priorities when planning Healthy City Project and carrying forward the plan has arisen. Therefore, this study tries to conduct practical research on the manner of setting priorities of business valuation standard about Healthy City Project. Methods: The research was carried out with Healthy City experts and government official. And in this research the responses of 28 participants among 37 have been taken into consideration due to their consistent responses. Results: The results of Level 1 showed that the "social & environmental approach" accounted for more than the "individual approach". In the case of Level 2, fields resulted in order of "environment", "infrastructure", "behavior", "evaluation and reflection", "disease prevention and rehabilitation", and "setting approach". Conclusions: The findings derived from this study are first, it is feasible to suggest the ways of establishing priorities as to the evaluation standards for the Healthy City Project and second, the results present the ways to proceed in terms of what tasks should be done for the healthy City Project development.

Impacts of Rural Road Project on the Social and Economic Activities of Community People (농어촌도로사업이 지역사회 주민의 사회.경제 활동에 미치는 영향)

  • Hong, Chan-Sun;Im, Sang-Bong;Huh, Yoo-Man
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.95-98
    • /
    • 2003
  • The objectives of the study are to analyze the impacts of rural road project on the social and economic activities of community people, offer basic data to perform evaluation of the project, and suggest future directions of the project. Research methodology adopted is a questionnaire method. There were interviewed 281 adult residents selected from 34 villages in Yeongdong-gun(mountainous), Miryang-si(middle), and Gochang-gun(plain). Results of the study are as follows: 1) Increase of income and land prices in mountainous and middle regions by the rural road project is higher than in plain; 2) Most inconvenient road expressed by the interviewee is the one linking farm and residence and 3) The problems of rural roads derived are narrowness, unpavement and partial pavement, unreliable maintenance, and long construction time. In order to meet the community needs on rural roads, it may be necessary that community people participate in the process of the project. And it is desirable to put priority on expanding and paving existing roads rather than constructing new one.

  • PDF

Prioritizing Technology Elements in New Product Development Using QFD and Taguchi Method (신제품 개발 프로젝트에서의 요소기술 중요도 결정 방안 : QFD와 다구치 방법의 적용)

  • Yang, Jong-Seo;Yun, Myung-Hwan;Yoon, Il-Bae;Park, Yong-Tae
    • Journal of Technology Innovation
    • /
    • v.12 no.3
    • /
    • pp.111-134
    • /
    • 2004
  • Current technology innovation or new product development project is composed of various process elements that conduct researches on fundamental technologies. However, with the effects of PERT and CPM, the greater part of the existing project management researches have only focused on the resource allocation and scheduling. But in the multi-project environment, priorities between technology elements need to be considered. Furthermore, a disagreement of opinion between project managers and researchers should be considered. In this study, technology element priority was determined using modified QFD and Taguchi method. Outcome of each method was compared to analyze the difference between project managers and researchers. As a result, QFD method showed relatively high level of consistency between project managers and researchers.

  • PDF

A Selecting Model for the Technology Modular Alternatives Based on Development Effectiveness (개발효용성에 근거한 기술대체모듈의 선정모형)

  • Kim, Ki-Chan;Ahn, Ki-Hyun;Kang, Il-Jung;Kwon, Cheol-Shin
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2007.11a
    • /
    • pp.152-155
    • /
    • 2007
  • The object of this research is to evaluate the priority of R&B project alternatives which were already screened by both feasibility and suitability of technological performance. This research is a selection model for R&D project alternatives after setting phase. And it is designed by CHP model which include individual and mutual weights. This model have 5 steps. (1) Setting Technology-Modules derived on the setting phase (2) Presenting the evaluation standards divided with 'M-Field' and 'T-Field' (3) Assessing the evaluation standard and technology modules (4) Obtaining and integrating the individually and mutually effective weights (5) Selecting the technology modules based on the priority of order by CHP. Through these steps, this model can suggest the evaluation way from specific technology levels to project level. And it can be guaranteed to perform the selected module set.

  • PDF