• Title/Summary/Keyword: Project mapping

Search Result 204, Processing Time 0.025 seconds

SNU AGN Monitoring Project (SAMP) using reverberation mapping of luminous AGNs

  • Jeon, Yiseul;Woo, Jong-Hak
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.41 no.1
    • /
    • pp.70.4-71
    • /
    • 2016
  • The links between super-massive black hole masses and their host galaxy properties are observed, indicating that black hole growth and host galaxy evolution are closely related. Reverberation mapping, which uses the time delay from the central black hole to broad line regions, is one of the best methods to estimate masses of black holes of active galactic nuclei (AGNs). However, only masses of about 50 black holes have been determined in reverberation mapping studies so far, and most of them are limited to optical luminosities below 10^45 erg/s due to the challenges of long-term time domain observations in both photometry and spectroscopy. In this project, we expand reverberation mapping samples to higher luminosities of > 10^44.5 erg/s at 0.1 < z < 0.35, that have expected time lags of 40 - 250 light days. Photometric (using LOAO 1-m and MDM 1.3-m) and spectroscopic (using MDM 2.4-m and Lick 3-m) monitoring campaigns are being conducted for a 3 year duration and 20 day cadence. Precedent photometric observations in 2015B show some targets with variability and follow-up spectroscopic observations are on-going. In this presentation, we introduce our project, present reverberation mapping simulation results, and preliminary results on photometry. These reverberation mapping masses of relatively high luminous AGNs will provide a strong constraint on black hole mass calibration, e.g., the single-epoch mass estimation.

  • PDF

A Study on the Mapping of Risk Factor with Performance Index in Urban Regeneration Project (도시재생사업 성과지표와 위험요인 연계 방안 연구)

  • Yu, Young-Jeong;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.497-500
    • /
    • 2008
  • Recently, the urban regeneration project has been performed actively at home and abroad. The stake-holders in urban regeneration project are various and complicated, and has large scale during a long life period. Also they show the characteristics of a mega-project and most mixed-use form. Therefore, the urban regeneration has a lot of potential risk factors from project beginning to completion. It means they need efficient and continuous risk management in terms of performance measurement. But the current domestic construction project does not reflect risk management in view of performance measurement. This study proposes the risk management methodology by mapping risk factors with major performance indexes of the urban regeneration project.

  • PDF

USING PROCESS MAPPING IN CONSTRUCTION PROCESS TO REDUCE CHANGE ORDERS

  • Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.616-621
    • /
    • 2009
  • Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.

  • PDF

The Pilot Production of Topographic-Cadastral Maps and Its Applications in Korea

  • Park, Yun-Soo;Park, Byung-Uk
    • Korean Journal of Geomatics
    • /
    • v.1 no.1
    • /
    • pp.51-59
    • /
    • 2001
  • The Government confirmed the action planning of digital mapping project for major thematic maps based on ‘Revised Plan for The Development of the National Geographic Information System’(NGIS). Mapping for major thematic maps was begun in 1998 when digital mapping project for topographic maps finished due to the delay of the action planning, and will selectively have produced the essential digital thematic maps according to the frequency of usage. The models of topographic-cadastral maps and administrative boundary maps around Suwon were produced in accordance with the presented draft. We presented specification for production of the most appropriate topographic-cadastral maps and administrative boundary maps through the analysis of the process of production, discussion and error check, and correction of the produced topographic-cadastral maps and administrative boundary maps. And we could make it easier to develop digital mapping project of topographic-cadastral maps and administrative boundary maps effectively by presenting the strategy for data input and maintenance, the cost model for carrying out the digital thematic map production, digital topographic maps, and the supplement of data model and data format. Topographic-cadastral maps has a wide range of usage but a lot of difficulties in the process of production and map update under use. So it seems that the study on users, university, private sector and municipal self-government must follow for promoting the use of topographic-cadastral maps.

  • PDF

Improvement Target SW Process Selection for Small and Medium Size Software Organizations (중소 소프트웨어 기업의 개선 대상 SW 프로세스 선정)

  • Lee, Yang-Kyu;Kim, Jong-Woo;Kwon, Won-Il;Jung, Chang-Sin;Bae, Se-Jin
    • The KIPS Transactions:PartD
    • /
    • v.9D no.5
    • /
    • pp.887-896
    • /
    • 2002
  • Based on SPICE (Software Process Improvement and Capability dEtermination) evaluation model, SPIRE (Software Process Improvement in Regions of Europe) is developed and published as a process improvement model for small and medium size organizations. However, practical selection guidelines or mapping rules between business goals and software processes do not exist within SPIRE. This research aims to construct an objective reference mapping table between business goals and software processes, and to propose a process selection method using the mapping table. The mapping table is constructed by the convergence of domestic software process experts' opinions using Delphi techniques. In the suggested process selection method, target processes are selected using the intuition of project participants or project managers as well as the reference mapping table. The feasibility of the proposed selection method has been reviewed by applying to two small software companies. Using the reference mapping table, we could select key processes which were passed over by project managers.

Design and Operation of Value Stream Mapping (VSM 설계와 운영방안)

  • Choi, Sung-Woon;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.6
    • /
    • pp.149-157
    • /
    • 2006
  • This paper suggests the design and operation of value stream mapping(VSM) applied to project management, such as R&D, IT Investment. First this study represents design methodology of VSM process using SIPOC(Supplier, Input, Process, Output, Costumer). Second, this paper considers the identification and improvement plan about non-added value time for VSM using FPC(Flow Process Chart) and PERT/CPM. Last, this paper proposes VSM scheduling method using PERT/CPM and CCPM(Critical Chain Project Management)

Introduction On the Importance of Engineering Survey in Project Management

  • Meng, Yanlei;Chen, Guiming
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.260-262
    • /
    • 2017
  • During the construction of the project, all surveying and mapping work is collectively referred to as engineering survey. Therefore, the measurement work contains a wide range of content, in the engineering survey, design and construction management stage are involved. To the actual work, the project measurement runs through the project building in a number of stages, and provide basic services. This paper mainly through the analysis of engineering measurement at all stages of the role played by the measurement work in the project management work to do the following description.

  • PDF

OpenBIM-based Mapping System Development for Geometry Information Exchange of Architectural Components (건축부재 형상정보 교환을 위한 개방형BIM 기반의 매핑 시스템 개발)

  • Park, Seunghwa;Kim, Inhan;Lee, Jiah
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.2
    • /
    • pp.182-190
    • /
    • 2014
  • Parametric modeling is one of BIM's characteristics and BIM have being utilized for constructability analysis, energy efficiency analysis, and so on in diverse construction field. However, parametric information's interoperation is not solved until now because different BIM tools have specific algorithm and methods to generate geometric information. To solve the problem, previous research suggested IFC-XML methodology. In this paper, authors studied connections between IFC-XML structure and script-based modeling commends to make libraries in commercial BIM tools such as ArchiCAD$^{TM}$ and Digital Project$^{TM}$. In addition, they made commends mapping tables to exchange geometry information of architectural components. Moreover, mapping system was developed to certify the mapping tables which is classified modeling commends. Finally, translated architectural component model was confirmed using exchanged geometry information in browser.

Approach of establishing As-Is BIM Model Process in Apartment Remodeling project using 3D Laser Scanning. (공동주택 리모델링 사업에서 3D 레이저스캐닝 기술을 활용한 기존 구조체 As-Is BIM모델 구축 프로세스 제안)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.183-184
    • /
    • 2015
  • More than 50% of the existing buildings in Korea are over 15 years old. Therefore it is necessary to be held reconstruction or remodeling deteriorated buildings more efficiently. Especially, since remodeling project reserves existing structures, it requires less period of project and construction period compare to reconstruction. It is possible to minimize uncertainty in communication between participants and able to manage information and construct efficiently in remodeling projects. This paper is first step of integrated BIM-based whole lifecyle management of apartment remodeling process. It suggests 3D laser scanner specification factors and site constraint factors for mapping between two groups. Therefore it will contribute to develop mapping algorithm of two groups and find optimal combination for apartment remodeling.

  • PDF

A study on content curriculum mapping of Korea in the OECD education 2030 project: Focused on mathematics (OECD Education 2030 교육과정 내용 맵핑 본검사 참여 연구 : 수학과를 중심으로)

  • Cho, Seongmin;Lee, Mee-Kyeong
    • The Mathematical Education
    • /
    • v.58 no.4
    • /
    • pp.507-518
    • /
    • 2019
  • The OECD launched the Education 2030 project to develop a learning framework and to conduct the international comparative study on curriculum. As a part of the OECD international curriculum analysis, Korea Institute for Curriculum and Evaluation(KICE) conducted a main study of Curriculum Content Mapping (hereafter, CCM) in the 7 learning areas/subject areas such as national languages, mathematics, humanities/social sciences, natural science, physical education/health, arts, and technologies. The CCM study aimed to identify how the competencies on CCM framework were reflected in the Korea curriculum. For this purpose, KICE identified the competencies on CCM framework, revised the coding framework, and undertook the mapping process. In this study, we gathered the CCM data as an evidence of how competencies on CCM framework were embedded in the 2015 revised mathematics curriculum. For this purpose, experts in mathematics education undertook the mapping process, we summarized the results of CCM main study in mathematics. As the results, numeracy, critical thinking, problem solving, anticipation, action, reflection were perfectly embedded in the 2015 revised mathematics curriculum. the competencies on CCM framework were embedded in the 2015 revised mathematics curriculum, and but literacy, physical/health literacy, trust, learning to learn, reconciling tension and dilemmas, literacy for sustainable development, financial literacy, and entrepreneurship/enterprising were not clearly related to mathematics curriculum. The mapping results should help the Korea Ministry of Education and KICE for preparing the future curriculum revision and development.