• Title/Summary/Keyword: Project managing System

Search Result 214, Processing Time 0.035 seconds

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

Construction for the Design Project Management System(DPMS) (디자인 프로젝트 관리 시스템(DPMS)의 구성)

  • 우흥룡
    • Archives of design research
    • /
    • v.12 no.3
    • /
    • pp.227-234
    • /
    • 1999
  • We paid attention to the fact that a project will always tend to increase in size even if its scope is narrowing. The complexities and multidisciplinary aspects of projects require that the many parts should be put together so that the prime objectives- performance, time, and cost- are met. These aspects lead to the use of teams to solve problems that used to be solved by individuals. Firstly, We surveyed the design companies and their clients on the design projects, and categorized the design task into 5 phases, that are marketing, planning, idea development, presentation, and follow-up. Among the phases, the presentation has the most difficult task, longest processing time, and highest cost, whereas idea development phase has relatively low cost, longer processing time, and more difficult task. Most of the companies used to be faced several bottlenecks on their design projects - time control, budget control, and resource control. Secondly, for improving the project managing process, we adopted that dividing and analyzing the sub critical paths may help in the effective managing.(Badiru, Adedeji B., 1995) Some critical paths require almost as much attention as the critical path since they have a high potential of becoming critical when changes occur in the network. Therefrom we suggest the Total task weight(Gt) as a management formula for the design project management.${Gt=\mathrm{T}\ast\leftthreetimes\ast1/100}$<\TEX> ( Gt = Total task weight, mathrm{T} = Task Weight, \leftthreetimes= Criticality ) Thirdly, In order to support to managing for the design projects, we set up an application system, which is graphically planning and implementing a complex undertaking. It is helpful to make the control of a project easy. The DPMS(Design Project Management System), which has two sub system. One is Project Screening System(PSS), and another Project Managing System(PMS). In PMS, we divided the design project into three modules; Project Planning, Project Implementation, and Project Evaluation. As a result, the DPMS will contribute to supply the control of a project easily and effectively. Also teams are used for making decisions and taking action with the DPMS. But we need to get further studies on the relationships between the whole project and its tasks.

  • PDF

Design of a Sanction System for Six Sigma Project (식스 시그마 프로젝트를 위한 결재 시스템 설계)

  • Kang, Dae-Ki;Chang, Won-Tae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.4
    • /
    • pp.868-874
    • /
    • 2010
  • In this paper, we propose a design of automated electronic sanction system for management of six sigma projects. The proposed system performs diverse operations such as registering and choosing enterprise-wide enhancement project, managing schedules of the project, verifying the validity of the project, and thus managing the whole life cycle of the project. Each six sigma project is stored in the database repository for facilitation of its later use. The proposed system has been effectively applied in a Korean company, and thus, through the proposed system, we expect the effects of innovation-related and enhancement-related activities which six sigma is fundamentally pursuing.

PM system for New Product Development (신제품개발을 위한 PM시스템)

  • Choi Sungwoon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.123-127
    • /
    • 2005
  • This paper considers a set of project management practices for government R&D projects, enterprise R&D projects and new product design project. The approach of managing multi-project is proposed by the use of organizational structure and control.

  • PDF

Analysis of Actual Condition of Innovative Sharing University Project for the Human Resource Development of Digital New Technology (디지털 신기술 인재양성 혁신공유대학 사업 실태 분석)

  • Han, Jiyoung;Lee, Seungyeop
    • Journal of Engineering Education Research
    • /
    • v.26 no.4
    • /
    • pp.66-78
    • /
    • 2023
  • The purpose of this study was to analyze the actual condition of the innovative sharing university project. To this end, a focus group interview was conducted by selecting officials participating in the innovative sharing university project as study participants. The collected data was analyzed using the content analysis method. The results of the study are as follows. First, in terms of the promotion system and operation dimension of project group, study participants presented difficulties and improvements in terms of the national promotion system and university-level project operation. Second, in terms of curriculum management dimension, study participants presented difficulties and improvements in content development and sharing, engagement support for professors and students participation, and securing and sharing educational infrastructure. Third, in terms of management of project performance indicators, study participants presented difficulties and improvements in managing core performance indicators, managing autonomy performance indicators, and sharing project performance. Based on these study results, suggestions for the use of research results were presented.

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

A Study on the PSP-Platform for the Atomicity of Distributed Ledger

  • Lee, Eun-Hee;Yoon, Yong-Ik
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.5
    • /
    • pp.73-80
    • /
    • 2019
  • In Korea, a budget of tens of trillion won is put into the national R & D project every year. Thanks to these efforts, Korea's ICT industry is gaining global attention. However, there are still a lot of problems that are lacking in terms of the cycle of managing national ICT R&D projects. In particular, the issue of sharing is very insufficient throughout the cycle of the national ICT R&D. In this paper, In this paper, We propose a platfom that can be shared throughout the cycle of managing blockchain-based national ICT R&D projects. This platform we call the Perfect Sharing Project Platform (PSPP). We describe that PSPP can achieve excellent research results through information sharing of project process[1-2]. To support the perfect sharing, this platform uses a new notion of consensus algorithm, called POA (Proof of Atomicity). This platform is suitable for sharing information.

Development of An Evaluation Index for Intermediate Outcomes from Rural Village Development Project (농촌마을종합개발사업의 중간결과 평가지표 설정)

  • Kim, Hyeon-Soo;Kim, Kyung-Ryang;Choi, Youn-Sang;Jung, Hae-Dong;Jun, Taek-Ki;Hong, Chan-Sun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.429-435
    • /
    • 2005
  • This study attempts to develop indices in order to make an objective and effective evaluation of achievements in the first stage of operation of the Rural Village Development Project(RVDP) (the first 3 years of its operation). The results are as follows 1. Evaluation purposes are expansion of income-generating bases, improvement of living environments, strengthening of village's competence and establishment of an effective project's management system. 2. Evaluation items for the first three evaluation purposes, which are income-generating bases, improvement of living environments and strengthening of village's competence, are record of performance and substantiality in project's operation, results from operation, and capability in managing the project. Those for establishment of an effective project's management system are participation of habitants and the projects's management system. 3. As this study aims to develop the indices which can evaluate the state of operation in the interim of the project's operation and outcomes generated by then, the evaluation indices are selected by considering those criterions of representativeness, accessibility, usefulness and reliability. 4. As the indices developed in this study efficiency evaluate the process of project's operation and thus evaluate basically the project's operation on the basis of its efficiency. But, considering the purposes of the RVDP, it is included for the overall project's management system and plans for managing activities of the project to be evaluated on the basis of effectiveness.

  • PDF

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

Analysing the Effects of Regional Development Project on Regional Economic Development: An Application of System Dynamics Approach (시스템다이내믹스를 이용한 지역개발사업의 파급효과분석)

  • Choi, Young-Chul
    • Korean System Dynamics Review
    • /
    • v.6 no.1
    • /
    • pp.147-176
    • /
    • 2005
  • This paper attempts to analyse the financial validity of the Eco-therapy project which 'J' city in 'C' province has been eagerly trying to implement for its regional economic development and also to estimate the potential economic impact of the project on its regional economy. In doing so, it employs system dynamics which is a methodology for studying and managing complex systems, such as one finds in business and other social systems. Analytic framework for this study is constructed, based on the existing theoretical studies. This study concludes that the Eco-therapy Project concerned is economically and financially valid and it is also expected that the regional economic impacts arising from the construction and operation of the facilities concerned are greater than any other project which 'J' city has been pursuing.

  • PDF