• 제목/요약/키워드: Project management practice

Search Result 363, Processing Time 0.03 seconds

PROBABILISTIC MEASUREMENT OF RISK ASSOCIATED WITH INITIAL COST ESTIMATES

  • Seokyon Hwang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.488-493
    • /
    • 2013
  • Accurate initial cost estimates are essential to effective management of construction projects where many decisions are made in the course of project management by referencing the estimates. In practice, the initial estimates are frequently derived from historical actual cost data, for which standard distribution-based techniques are widely applied in the construction industry to account for risk associated with the estimates. This approach assumes the same probability distribution of estimate errors for any selected estimates. This assumption, however, is not always satisfied. In order to account for the probabilistic nature of estimate errors, an alternative method for measuring the risk associated with a selected initial estimate is developed by applying the Bayesian probability approach. An application example include demonstrates how the method is implemented. A hypothesis test is conducted to reveal the robustness of the Bayesian probability model. The method is envisioned to effectively complement cost estimating methods that are currently in use by providing benefits as follows: (1) it effectively accounts for the probabilistic nature of errors in estimates; (2) it is easy to implement by using historical estimates and actual costs that are readily available in most construction companies; and (3) it minimizes subjective judgment by using quantitative data only.

  • PDF

A Journey to Action Research in a Clinical Nursing Context (임상간호현장에서의 실행연구 여정)

  • Jang, Keum Seong;Kim, Heeyoung;Kim, Eun A;Kim, Yun Min;Moon, Jeong Eun;Park, Hyunyoung;Song, Mi-Ok;Baek, Myeong
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.19 no.1
    • /
    • pp.95-107
    • /
    • 2013
  • Purpose: The purpose of this study was to examine the effectiveness of Action Research (AR) approach in nursing. Methods: Participants were 64 perioperative nurses recruited from C hospital in Gwangju, Korea. The nurses were engaged in the project through 2 cycles of planning, acting, observing, and reflecting. A mixed-methods design was used to examine changes in participants and their knowledge management practice. Quantitative data were analyzed using SPSS 20.0 program and qualitative reflection data underwent content analysis. Results: During the project, participants developed standardized pre-operative checklists and opened an Internet Cafe to better manage their perioperative nursing information. At the end of the project, there was a significant increase in nurses' knowledge management (p=.015) and the rate of surgical material prescription errors decreased from 8.0% to 2.9%. Core AR project team members' teamwork skills and organizational commitment increased significantly (p=.040, p=.301, respectively). The main themes that emerged from the qualitative data were learning how to solve problems in practice, facilitating team activities through motivation, barriers of large participation, and rewarded efforts and inflated expectations. Conclusion: The AR project contributed to empowering participants to solve local problems. AR is a useful methodology to promote changes in practices and research participants.

Mathematics teacher learning and professional development in communities (수학 교사 학습과 전문성 신장에 관한 소고)

  • 방정숙
    • Journal of Educational Research in Mathematics
    • /
    • v.13 no.2
    • /
    • pp.143-157
    • /
    • 2003
  • This paper is to make strides toward an enriched understanding of mathematics teacher learning and professional development. Different theoretical frameworks in understanding mathematics teacher learning are reviewed, followed by a discussion of the relationships of knowledge and teaching practice. This paper then analyses contemporary conceptions about effective professional development and, in particular, deals with teacher learning in inquiry communities. This paper introduces a research project describing transition processes from teacher- centered mathematics classroom culture to student-centered culture and analyzing teacher learning in communities and its concomitant change in teaching practice. On the basis of the emerging problems in doing the project, this paper finally addresses some crucial issues on teacher learning and professional development, including the management of an inquiry community, the description of teaching practice from the researcher's perspective, and the analysis of teacher learning in communities.

  • PDF

A Study on the Baseline Carbon Stock for Major Species in Korea for Conducting Carbon Offset Projects based on Forest Management (산림경영형 산림탄소상쇄 사업설계를 위한 주요 수종별 베이스라인 흡수량 산정)

  • Kim, Young-Hwan;Jeon, Eo-Jin;Shin, Man-Yong;Chung, Il-Bin;Lee, Sang-Tae;Seo, Kyung-Won;Pho, Jung-Kee
    • Journal of Korean Society of Forest Science
    • /
    • v.103 no.3
    • /
    • pp.439-445
    • /
    • 2014
  • In this study, we developed a dynamic stand yield model to estimate the baseline carbon stock, which is essentially required for a forest carbon offset project based on forest management. For developing the yield model, the data was acquired from the databases of the $5^{th}$ National Forest Inventory. The model was validated by comparing its estimations with field measurements that were conducted from 4 study sites (14 plots with thinning treatments) located in Hong-chun, Hoeng-sung, Yang-yang Daechi and Yang-yang Jungja. The difference between the estimations and the field measurements was less than 5%. Using the dynamic stand yield model, we estimated the changes in stand yield volume and carbon stocks for each species according to the baseline scenarios. As the results, we found that baseline carbon stock was the highest at Quercus acutissima stand (83.01tC/ha), while the lowest at Pinus rigida stand (32.17tC/ha) and Pinus densiflora stand of central region (39.09tC/ha). Hence, a project provider could get more carbon emission credits from an improved forest management project when considering the project with Pinus rigida stand or Pinus densiflora stand (central region). The baseline carbon stock and the dynamic stand yield model developed from this study would be useful for designing carbon offset projects based on improved forest management.

공장공학(工場工學)(P. E)에서의 종합적(綜合的) 품질관리(品質管理) T. Q. C. in Plant-Engineering

  • Yun, Seok-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.8 no.2
    • /
    • pp.29-37
    • /
    • 1980
  • The purpose of this study is to define the role of a T. Q. C. engineer in the plant engineering activities. A "plant engineering" moves to complete a new project through a series of stages such as: 1. Research & Development stage. 2. Economic evaluation & engineering design stage. 3. Erection & start up stage. 4. Final production & control stage. This suggests that the plant engineering project should be carried out with a wide variety of tasks, as well as a central control. For a successful completion of the project, a T. Q. C. engineer is required, in practice, either as a central activity creator or as a key advisor in each task.

  • PDF

STATISTICALLY PREPROCESSED DATA BASED PARAMETRIC COST MODEL FOR BUILDING PROJECTS

  • Sae-Hyun Ji;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.417-424
    • /
    • 2009
  • For a construction project to progress smoothly, effective cost estimation is vital, particularly in the conceptual and schematic design stages. In these early phases, despite the fact that initial estimates are highly sensitive to changes in project scope, owners require accurate forecasts which reflect their supplying information. Thus, cost estimators need effective estimation strategies. Practically, parametric cost estimates are the most commonly used method in these initial phases, which utilizes historical cost data (Karshenas 1984, Kirkham 2007). Hence, compilation of historical data regarding appropriate cost variance governing parameters is a prime requirement. However, precedent practice of data mining (data preprocessing) for denoising internal errors or abnormal values is needed before compilation. As an effort to deal with this issue, this research proposed a statistical methodology for data preprocessing and verified that data preprocessing has a positive impact on the enhancement of estimate accuracy and stability. Moreover, Statistically Preprocessed data Based Parametric (SPBP) cost models are developed based on multiple regression equations and verified their effectiveness compared with conventional cost models.

  • PDF

Survey on Current Farmer's Irrigation Practice on Upland in the Yeongsan River Irrigation Project District IV (영산강 IV단계 사업지구 밭관개 실태조사)

  • Yoon Kwang Sik;Kim Young Joo;Yoon Suk Gun;Han Kuk Heon;Kim Jin Taek
    • KCID journal
    • /
    • v.11 no.2
    • /
    • pp.55-63
    • /
    • 2004
  • To devise better development plan, survey was conducted about current farmer's irrigation management on upland in the YoungSan River Irrigation Project District IV. Major upland crops are garlic and onion in this region. Currently, upland irrigation has b

  • PDF

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

A Framework of Building Knowledge Representation for Sustainability Rating in BIM

  • Shahaboddin Hashemi Toroghi;Tang-Hung. Nguyen;Jin-Lee. Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.437-443
    • /
    • 2013
  • Recently, sustainable building design, a growing field within architectural design, has been emerged in the construction industry as the practice of designing, constructing, and operating facilities in such a manner that their environmental impact, which has become a great concern of construction professionals, can be minimized. A number of different green rating systems have been developed to help assess that a building project is designed and built using strategies intended to minimize or eliminate its impact on the environment. In the United States, the widely accepted national standards for sustainable building design are known as the LEED (Leadership in Energy and Environmental Design) Green Building Rating System. The assessment of sustainability using the LEED green rating system is a challenging and time-consuming work due to its complicated process. In effect, the LEED green rating system awards points for satisfying specified green building criteria into five major categories: sustainable sites, water efficiency, energy and atmosphere, materials and resources, and indoor environmental quality; and sustainability of a project is rated by accumulating scores (100 points maximum) from these five major categories. The sustainability rating process could be accelerated and facilitated by using computer technology such as BIM (Building Information Modeling), an innovative new approach to building design, engineering, and construction management that has been widely used in the construction industry. BIM is defined as a model-based technology linked with a database of project information, which can be accessed, manipulated, and retrieved for construction estimating, scheduling, project management, as well as sustainability rating. This paper will present a framework representing the building knowledge contained in the LEED green building criteria. The proposed building knowledge framework will be implemented into a BIM platform (e.g. Autodesk Revit Architecture) in which sustainability rating of a building design can be automatically performed. The development of the automated sustainability rating system and the results of its implementation will be discussed.

  • PDF

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF