• Title/Summary/Keyword: Project management practice

Search Result 361, Processing Time 0.028 seconds

A Study on SI Project Environment and Risk Management Practice (국내 SI 프로젝트 수행환경 진단 및 위험관리 방안 연구)

  • 김현수
    • Korean Management Science Review
    • /
    • v.16 no.1
    • /
    • pp.203-218
    • /
    • 1999
  • This study presents a diagnosis of SI project environment and risk management practices in Korea. In particular, the stability of project environment, required skills for project managers, risk factors and usefulness of risk management activities are surveyed and analysed. Factor analysis and correlation analysis are performed to investigate any significant relationships among various risk management factors. The results indicate that SI project environment is not stable in Korea, and risk management can be a primary project management tool to deal with the situation. The results also that there's little significant difference in understanding not only between the clients and developers, but alto between the experienced managers and less experienced managers.

  • PDF

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

Problems and Solutions for the Private-funded Railroad Station Project Management (철도 민자역사 사업수행체계 개선방안)

  • Park Chan-Sik;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.172-180
    • /
    • 2004
  • Recently, there are growing concerns on the introduction of private financing in railroad station construction project. But private-funded station project does not have the efficient delivery system. This study is focused on the recommended solutions about the private-funded station project management. Through the literature survey and interview, it is investigated and analyzed that project management has the problems. The problems are classified as 2 areas: law & regulations and job practice. The problems in law & regulations are a lowing on the profitability, and an unreasonable project team selection process. Job practice has problems such as delaying in authorization process, and inferior feasibility analysis. The study suggests several recommended solutions related to the problem areas. That are as follows: the efficient return of investment system, the project financing system, the professional project management, the benchmarking team operation, and the cut down on discussion period

A Case Study on Assembly Block Operations Management at Shipyard (조선 조립블록 운영관리에 관한 사례연구)

  • Park, Chang-Kyu;Seo, Jun-Yong
    • Korean Management Science Review
    • /
    • v.23 no.2
    • /
    • pp.175-185
    • /
    • 2006
  • How to efficiently manage assembly blocks at shipyard has been a hot management issue in the shipbuilding Industry, because it has significantly influenced on the productivity of shipbuilding process. This paper introduces the real practice of assembly block operations management in Hyundai Heavy Industries (HHI) and the Ship Assembly Block Operations Optimization (SABOO) project that h3s been launched in HHI as an academy-and-industry collaborative project, aimed to diagnose problems, propose possible solutions, and develop a prototype system in order to search ways of improving the assembly block operations management. Through the field interviews, observations, and benchmarking studies, the SABOO project diagnosed the most rudimental and urgent problem and proposed possible solutions. In addition, the SABOO project developed the prototype system that embodied the visual function of monitoring the shipyard on a real-time and the Interactive block assignment function that utilized the assembly block assignment algorithm developed by the project. As a whole, the SABOO project tested the possibility and gained an insight in extending the functions of block transportation/stockyard management system.

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

Clinical Practice Guideline of Korean Medicine for Stroke : Preliminary Guideline and Recommendation (중풍환자에 대한 일차 한의임상진료 가이드라인)

  • Han, Chang-Ho
    • The Journal of Internal Korean Medicine
    • /
    • v.33 no.4
    • /
    • pp.347-366
    • /
    • 2012
  • The aim of this new statement is to provide comprehensive and timely evidence-based recommendations on stroke management for clinical practitioners. Many countries are already well engaged in developing and releasing their own clinical practice guidelines, whereas Korean Medicine (KM) is still beginning. It will take time and effort to develop evidence-based guidelines and recommendations of KM or other traditional medicine because they are weak in the area of scientific evidence. The clinical practice guideline of Korean medicine for stroke was formulated through extensive review of published literature and consensus meeting of Korean medicine specialists. This project was supported by a grant of the Oriental Medicine R&D Project, the Ministry of Health and Welfare. Referring to guidelines developed in other countries, the experts in the subject tried to organize and develop guidelines and recommendations adequate for domestic medical circumstances. In December, 2008, a multi-disciplinary team called the Evidence Based Clinical Practice Guidelines Development Group (EBCPGsDG) for Stroke was organized. The writing committee was comprised of experts in internal medicine, acupuncture, rehabilitation, and Sasang constitution. Outside specialists and associated panels were invited for consultation. The scope of the guideline encompasses acupuncture, moxibustion and herbal medicine (including Korean medicine, traditional Chinese medicine, Kampo medicine) as interventions for stroke patients. It includes statements about ischemic stroke (I63), stroke not specified as hemorrhage or infarction (I64), and sequelae of cerebrovascular disease (I69) according to the International Classification of Disease (ICD). The committee subdivided the description of herbal medications into acute stroke management, subacute stroke management, post-stroke management, and secondary prevention of stroke. Guidelines on the practice of acupuncture and moxibustion were described in order for acute stroke management, subacute stroke management, chronic stroke management, and post-stroke rehabilitation. Clinicians who are working in the field of stroke care can adopt this guideline for their practice.

Measuring Performance to Engage the Extended Project Team in Construction

  • Bal, Menoka;Bryde, David
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.1-10
    • /
    • 2015
  • In construction, stakeholders of extended project team play a key role in the overall project performance. Successful integration of stakeholders demands for good management practices at strategic, operational and project levels. Targets and measures to improve the stakeholder performance encourage the creativity and willingness of stakeholders of extended project team to develop the better ways to achieve the project objectives. This paper presents a generic descriptive method, showing how stakeholder's ability and influence impacts on project performance in the construction sector. The findings of a series of interviews with key informants are presented and the following main conclusion is drawn: improving project performance through stakeholder's contribution and measuring their performance can strengthen the project performance. This innovative approach which redefines the process of improving the project performance in construction projects will be of interest to those who intend to manage the projects in practice as well as to those who interested in advancing theory.

Development of the Training Course for Project Managers (프로젝트관리자 양성을 위한 실무 교육과정 개발)

  • Ko, Jesuk
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.61-67
    • /
    • 2006
  • Project management is the process of guiding the project from its beginning through its performance to its closure. Project management includes three basic operations which are planning, organizing and control. In particular, the project managers role and responsibility is regarded as the most important part when companies are supposed to work together. The purpose of this study is to address the knowledge and skills requirement of project manager. The demand of project manager has been increasing to perform accurately and share information effectively. In this paper, the proposed course can be used to provide a rudimentary scheme to train and develop knowledge and skills of project managers.

  • PDF

Quantification Model for Applying Construction Management Practices in Consideration of Project Characteristic Factors

  • Cha, Hee Sung;Kim, Jin Lee
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.1
    • /
    • pp.35-38
    • /
    • 2013
  • No single project is identical to one another in the construction industry. Furthermore, many construction projects are suffering from tighter budget, shortened schedule and higher client satisfaction level. To overcome these, project managers and engineers are willing to apply various best management practices to their projects. However, it is non-trivial to select the most appropriate practices for their projects. In many cases, it is much more important to find the appropriateness of the management practices than just to use the practices. Although many researchers are focusing on the development of new management practices, there is little research on matching between the circumstances of projects and the developed management practices. The objective of this study is to provide a structured process to suggest the best management practices for individual construction projects by developing a computerized system where an individual project is matched with the most optimal management practices to increase the value of the project. At this stage of writing, the authors have developed a computerized system to effectively find out the best suitable management practices for individual projects. By maximizing the usages of this system, it would facilitate the application of the best management practices in the industry.