• Title/Summary/Keyword: Project management maturity

Search Result 69, Processing Time 0.024 seconds

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

Development of evaluation model on PMIS function using CMM - Focused on Project Communication Management - (CMM개념을 활용한 건설 PMIS 평가 모델 개발 - 프로젝트 의사전달관리를 중심으로 -)

  • Park Jeong-Ha;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-463
    • /
    • 2002
  • The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports. A major problem for constriction companies is the lack of project assessing model for project management. One method of solving the problem is through the systematic management of construction processes. A development of model for assessing PMIS practice is attempting to develop a stepwise process assessment framework for the construction industry using Capability Maturity Model. This paper have provided further insights into the understanding of the framework, as well as its value for construction sector.

  • PDF

A Study on Correlation between the CMMI SPs and GPs at Maturity Levels 2 and 3

  • Lee, Min Jae;Rhew, Sung-Yul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.9-21
    • /
    • 2011
  • Assuming that the Capability Maturity Model Integration for Development v1.2 (CMMI) could be applied to an organization more effectively if the content similarities among practices were improved in terms of structure and composition, this paper presents the analysis of the correlations between the CMMI Specific Practices (SP) and Generic Practices (GP) for the Maturity Level 2 and 3 Process Areas using the Chi-square independence test. According to the analysis, a 22.2% correlation was observed. To minimize the problem of repeatedly applying similarities, 6 GPs that are highly correlated with the SPs were grouped together. Then, three different improvement plans: 1) development of a standard template-based project plan, 2) establishment of a configuration management system based on open source software to control work products and leverage experience, and 3) establishment of project assurance through an independent quality assurance-based organization and intensive review by higher-level management - were defined.

An assessment of the Systems Engineering Capability Maturity of the Railway Safety Project applied the Systems Engineering (시스템엔지니어링을 적용한 철도안전프로젝트의 시스템엔지니어링 능력성숙도 평가)

  • Choi, Yo Chul;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.55-61
    • /
    • 2008
  • In this paper, there is the case study which assesses the systems engineering capability maturity of the safety organization that performs the Railway Safety project using systems engineering method. To In ore effective and efficient a research and development to railway safety domain, a new research and development method can be progressively needed such as systems engineering. To assess quantitatively research of systems engineering efforts in the railway safety project, SECM(EIA/IS 731) Standard is utilized in the paper. It is by questionnaire that the capability maturity assessment is executed wit h the safety organization and staffs who performs the systems engineering activities; requirement analysis and management, interface control management. product verification and validation, and so on. As a result, the systems engineering capability level of the safety organization rises from 0 level at the initial project to 2 level after two years and all staffs give an affirmative answer about the importance and effectiveness of the systems engineering approach.

  • PDF

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

The Effects of R&D Process Maturity on Product Development Performance: Focused on Mediating Effect of R&D Project Performance (R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향: R&D 프로젝트 성과의 매개효과를 중심으로)

  • Shin, Kyung Sic;Oh, Min Jeong;Kim, Won Ki;Park, So Hyun
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.7 no.7
    • /
    • pp.165-174
    • /
    • 2018
  • The purpose of this study is to verify the effects of R&D process maturity on product development performance and to verify whether R&D project performance mediating effect. The questionnaire was collected and analyzed to 131 persons related to the R&D work in 55 companies and public institutions performing R&D work. The results of this study are as follows, the effect of R&D process maturity on product development performance and mediating effect of R&D project performance were analyzed by simple and multiple regression analysis. Regression analysis was analyzed by SPSS statistical program. The higher the maturity level of the R&D process, the higher the product development performance and the R&D project performance, and the R&D project performance is partially mediated. It is concluded that it is important to establish and operate a systematic R&D process and to develop a project management methodology suitable for the characteristics of a company in order to improve product development performance. It is expected that if this study are utilized as practical R&D management methodology in corporate management, it will contribute to improvement of company product performance.

Design of Process Support System based on CMMI (CMMI 기반 프로세스 지원 시스템 설계)

  • Choi, Dong-Hee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.3
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.

성공적 SCM 시스템 구축에 미치는 영향요인에 관한 연구 - 관계역량 매개와 경쟁강도 조절효과를 중심으로 -

  • Kang, Seong-Bae;Mun, Tae-Su;Jeong, Yun
    • 한국경영정보학회:학술대회논문집
    • /
    • 2008.06a
    • /
    • pp.701-711
    • /
    • 2008
  • SCM(Supply Chain Management) is one of the important issues in internet-based business environment. This study intends to suggest a research model to investigate the influence of environmental, organizational, technical factors on successful SCM system implementation. The purpose of this study is to analyze the influence of the organizational characteristics of SCM adoption on successful implementation of SCM systems, including the moderating effects of competitiveness. 122 companies data were collected by survey. The results of hypothesis testing showed that project management is the most important determinants to influence successful SCM system implementation. In addition to that, top management support, IS maturity have positive influence to successful implementation of SCM systems in direct effect model. Also, the results of hypothesis testing in moderating effect model show that competitiveness has a positive impact to successful implementation of SCM systems.

  • PDF

An Empirical Study on the Influence of Environmental, Organizational, IS Characteristics on Successful Implementation of ERP Systems (환경, 조직, 정보시스템 특성이 ERP시스템의 성공적 구축에 미치는 영향에 관한 실증연구)

  • Moon Tae-Soo;Seo Ki-Chul
    • The Journal of Information Systems
    • /
    • v.15 no.1
    • /
    • pp.73-96
    • /
    • 2006
  • Recently, ERP system is used as a important tool of management innovation for enterprise's survival and development. It is very important to recognize how much influence to organizational performance through ERP system implementation. The purpose of this study is to find out the impact of environmental, organizational, information systems characteristics on successful implementation of ERP systems in Korean SMEs(Small and Medium Enterprises). From previous researches on ERP adoption and implementation, 7 independent variables (competitiveness, government support, top management support, process innovation, project management, IS maturity, and ERP customizing), and 1 dependent variables (successful implementation of ERP systems) are identified. 3 questionnaires were removed from the study because of missing or inappropriate responses, and final samples are 91 SMEs. The results of hypothesis testing show that determinants of successful implementation of ERP systems are top management support and IS maturity. Five variables such as competitiveness, government support, process innovation, project management, and ERP customizing do not significantly influence to successful implementation of ERP systems. The contribution of this study is that it provides an empirical evidence of the causal relationship between ERP adoption factor and ERP success. This study showed that top management support and IS maturity are essential to accomplish successful ERP implementation for SMEs.

  • PDF

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF