• Title/Summary/Keyword: Project finance

Search Result 210, Processing Time 0.03 seconds

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

A Study on the Sensitivity Analysis of the Financial Analysis Item in Apartment Project (공동주택 사업의 수지분석 항목에 대한 민감도 분석에 관한 연구)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.100-109
    • /
    • 2006
  • Feasibility analysis is a crucial key to success or failure of housing project. Existing feasibility analysis in construction company is based on intuitive approach rather than systematic approach. Usually feasibility analysis in a narrow sense is a financial analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. So, the purpose of this study is to analyze the sensitivity of financial analysis item about profit rate by means of monte carlo simulation and this will improve accuracy of feasibility analysis and decision making.

A Study on the Rural Activation Project and the Special Economic Zone for Regional Development Policy (농촌활성화사업과 지역특화발전특구제도의 고찰)

  • Jung, Jinju
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.7 no.3
    • /
    • pp.1-8
    • /
    • 2005
  • Decrease in Population and graying of rural area by industrialization and urbanization are gone continuously. This makes happened various rural problems and the differential of standard of living with is arising day by day. Government is unfolding rural supporting project to solve continuously these problems. Recent Projects which are choosing not top-down process by government leading but bottom-up process through village inhabitants' participation and expert consultant get positive estimation. But those have difficulties because the support is attained only in the beginning step not continuously and inhabitants' number by graying is decreasing. The Special Economic Zone for Regional Development Policy is new access that regulation can differ according to special quality of each area depending on Localization Age. Through this transfer the competence that can mitigate or reinforce various regulations according to special quality of area in local government. So, back and maintain activation systematically so that each area could be developed specially. The purpose of The Special Economic Zone for Regional Development Policy is the activation of regional economy through development that regional specific character is. And there is characteristic that local government plans and takes the lead in all project contents, government gives regulation benefit by appointing the special economic zone and do not support finance and various tax remissions. Through investigation of such new policy, I wish to recognize what long-term plan and method could be possible to success rural activation continuously.

  • PDF

A Study on the Causal Loop Analysis and the Economics of BTO and BTL System of PFI (BTL과 BTO사업의 인과순환구조 분석과 경제성 비교에 관한 연구)

  • Choi, Nam-Hee
    • Korean System Dynamics Review
    • /
    • v.12 no.4
    • /
    • pp.35-62
    • /
    • 2011
  • PFI(Private Finance Initiative) for suppling SOC and public facilities instead of Government Infrastructure Project introduced from 1994. BTO(Build-Transfer-Operate) project had been major type of PFI system from 1994 to 2005. But after changed the Law of PFI on SOC, the BTL project newly introduced. In BTO system, the Government retrieves the investment through the operating income, but in BTL system, the government lease the facilities. As the BTO and BTL projects are widely adopted and implemented to ease the fiscal burden of government, but it has caused the tremendous fiscal burden each year over the period operation. Therefore this study attempted to analyze the question, that is, why government fiscal burden tipping? Hence, this paper, compares the difference of business structure between BTO and BTL project and explore the vicious and virtuous business structure, with the method of circular causal loop analysis. As a result, it has shown that there are some positive feedback and negative feedback loops cause the tipping and easing of government fiscal burden.

  • PDF

The Role of Islamic Business Ethics and Market Condition on Organizational Performance

  • BULDAN, Hamdi;HAMID, Edy Suandi;SRIYANA, Jaka;TOHIRIN, Achmad
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.1
    • /
    • pp.781-790
    • /
    • 2021
  • The purpose of this study is to test empirically the effect of Islamic business ethics and market conditions on organizational performance in state-owned construction companies in Indonesia. Data collection in this study was conducted online and the total number of data used was 81 respondents, both directors, heads of departments, and managers (general and project). This study uses a partial least squares structural equation model (PLS-SEM) with a quantitative approach that aims to test hypotheses and relationships between variables, such as Islamic business ethics, market conditions, project management, organizational culture, competitive strategy, and organizational performance. This study shows Islamic business ethics has a significant direct effect on organizational performance. Market conditions do not have a direct significant effect on organizational performance. Meanwhile, the mediating variables of project management and competitive strategy have a significant direct effect on organizational performance. Organizational culture does not have a significant influence on organizational performance. Conversely, market conditions have a significant influence through the mediating variables of project management and competitive strategy on organizational performance. Besides, this study is an attempt to determine the impact of the criteria factors affecting the measurement of the performance of construction organizations in Indonesia in terms of the external environment and organizational structure.

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

Analysis of the Construction Plan and Enforcement Condition of the Port Circular Highway for Cargo Transportation of the Pusan Port (부산항 물동량 처리를 위한 광역배후수송도로의 건설계획과 시행실태 분석)

    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.313-322
    • /
    • 1999
  • Pusan the principal port of South Korea, has opened its door since 1876. Currently, the four-stage port construction project is under way to handle ever-growing marine transportation volume. While the port unloading capabilities are increasing the infrastructure to deal with all the transportation volume failed to catch up with them. Accordingly the city had to suffer from worst traffic congestion on due to the increasing container traffic volume causing logistical costs to rise. This study was designed to inspect the enforcement of infrastructure construction plan and suggest systematical and effective ways to improve the plan. The study focused on :\circled1The decision-making procedure, \circled2Financial resource for the plan, \circled3Effectiveness of the project enforcement, and \circled4Who will be in charge of the project. As a result from the study, these followings were suggested to improve the plan. First, Pusan Port Infrastructure consisting of (Inter-city Free way, Belt Highway and Outer Highway) should be immediately legally-regulation project. Second, the method to finance the project should be deter-mined and investment consultation among the central government the city government and private sector should be also made. Measures to make the central government budget allocation for the project mandatory should be discussed. Third, Effectiveness of the project can be doubled by gradually or partialyl opening the routes based on long-term or short-term operating plans. Fourth, The organizer of the project should be appointed, or a special task-force team in charge of the plan can be formed.

  • PDF

A Study on the Scope of the Recognized Equity Capital of Developer in Real Estate Project Finance Loan Screening (부동산 PF를 위한 시행사의 자본금 인정범위에 관한 연구)

  • Lim, Suhong;Jang, Hokwan;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.75-83
    • /
    • 2020
  • This study intends to explore the scope of the recognized equity capital of developer in real estate project finance loan screening. The factors which can be recognized as equity capital are categorized into 24 factors with 3 upper categories and 6 mid categories. In order to develop the importance weight of factors, AHP and Fuzzy methodologies are implemented based on survey analysis by experts in financial institutions. Research findings indicate that the land cost, evacuation cost, and real estate acquisition tax as land-related direct costs, and the design cost, traffic impact assessment cost, underground safety impact assessment cost, boundary surveying cost, and geological survey cost as the construction permit-related costs are higher than any others. On the other hand, the supplementary costs related to the operation of the developer show very low importance weight. Accordingly, the hierarchy of factors for equity capital should be clearly developed in order to minimize any dispute and prevent non-performing loans to real estate project finance.

The Impacts of the Optimal Non-Financial Contractual Structure on the Leverage Ratio in Project Finance (자원개발 프로젝트 파이낸싱 위험완화 연구: 사업위험에 따른 비재무적 계약의 레버리지 효과 분석)

  • Lee, Changmin;Choi, Bongseok;Kim, Seon Tae
    • Environmental and Resource Economics Review
    • /
    • v.23 no.4
    • /
    • pp.643-665
    • /
    • 2014
  • We study the optimal policy of the contracual arrangement in raising the debt-to-equity ratio for oil, gas and mining project finance deals. We investigate the impact of the optimal contractual relationship between counterparties on the soundness of projects, differing in output price volatility and country risk. Key findings are: first, the existence of EPC sponsors and off-takers generally raises the debt-to-equity ratio. In particular, EPC sponsors and off-taking sponsors jointly mitigate the credit risk caused by counntry risk. Seocond, off-taking and EPC contracts jointly help mitigate the credit risk caused by the country risk, rather than the price volatility. Indeed, the contractual structure raises the debt-to-equity ratio.

Predicting Project Performance by Analyzing Key Success Factors on Project Fiancing(PF) Development (건설 프로젝트 파이낸스(PF) 사업의 성공영향요인(KSF) 분석을 통한 사업성과 예측 모델)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.127-137
    • /
    • 2014
  • Project Financing (PF) development project is the type which influences national economy and building industry largely because it is exerted by using borrowed money from many kinds of investors and huge amount of financial raising. Many domestic PF projects are focused mainly on the profit maximization lacking in a sufficient feasibility study. Nowadays many projects are suspending due to the global finance debacle and stagnation of real estate industry. Therefore, in this paper, risk factors of PF project are deducted and Key Success Factors (KSFs) are derived through Factor-Analysis and qualified using Fuzzy-AHP method. And through the evaluation of the derived success factors in real projects, a strong correlationship has been identified between the score of each PF success factor and the level of success and/or expected rate of return (ROR). So, the result of this paper can help decision makers of the PF projects make a better decision and give a meaningful guidance in achieving successful PF projects.