제주시 원도심 주민참여형 재생사업의 총괄계획가 운영 모델 수립에 관한 연구 (A Study on the Establishment of Masterplanner Operating Model for Residents' Participation Regeneration Project in Old Settlements of Downtown Jeju)

  • 양건;이상호;백승헌
    • 한국농촌건축학회논문집
    • /
    • 제17권3호
    • /
    • pp.37-44
    • /
    • 2015
  • The purpose of this study is to find important factors for establishment of masterplanner operating model in residents' participation regeneration project suitable for small provincial city compared with Seoul city's which were already operated these days. The study showed the following results: 1) Conditions required for masterplanners are professional, regionality, sustainability, balance, independence. 2) Regionality and professionality can be guaranteed by expert-recommendation and perform manual suitable for character of project and regional conditions. 3) Conditions required for masterplanners are applied flexibly depending on the size and duration of project.

ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

SI 프로젝트에 있어서 프로젝트 관리자의 역량과 리더십 유형이 프로젝트 성과와 고객만족에 미치는 영향 (The Effects of the Project Managers' Competency and Leadership Style on the Performance and the Customer Satisfaction of SI Projects)

  • 김은홍;김화영
    • 한국경영과학회지
    • /
    • 제31권4호
    • /
    • pp.157-179
    • /
    • 2006
  • Recently, as business becomes more dependent on information technology for their operations, SI project managers are under increasing pressure to implement SI projects on time and within budget, and to satisfy customer requirements. For the success of SI projects and customer satisfaction, SI project managers should master the critical shills and knowledge requirements and consider the proper leadership style to lead the team members and to manage SI projects. The leadership style includes four categories, such as directive leadership, supportive leadership, participative leadership, and achievement-oriented leadership. This study has examined the project managers' competency and suggests the three competency factors, which are technical, human, and conceptual shills, for the success of SI projects and customer satisfaction. The study suggests that SI project managers should master the three critical skills and knowledge requirements, and consider the proper leadership style for the successful implementation of SI projects. Also SI project managers should consider contingency factors such as project size and duration and outcome variables such as protect performance and customer satisfaction so as to enhance the leadership effectiveness.

사례연구를 통한 건설프로젝트에 CCPM의 적용 (Application of Critical Chain Project Management to Construction Project by a Case Study)

  • 박정현;이영대;김영;김사명;박혁
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.274-277
    • /
    • 2003
  • 제약이론은 특정한 관리기술을 개발하는데 사용되는 접근방법이며, 철학이다. 운영관리상에 적용되었던 소설 "The Goal"에 의해서 처음으로 널리 보급되었다. 1997이후로 프로젝트관리의 두 가지 영역에서 적용되어 왔으며. 그 천 번째 적용은 단일프로젝트에 대한 공기단축과 프로젝트 통제관리의 간소화를 위한 공정관리분야이며, 두 번째 적용은 동시에 수행되는 여러 프로젝트에 의해서 공유되는 자원의 효과적 관리이다. 이 논문은 프로젝트 관리에 적용된 제약이론인 애호사슬(Critical chain)의 원리에 대해서 연구하고, 국내의 건설프로젝트에 적용하는 것을 목적으로 한다.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

베이지안넷 기반의 프로젝트 일정리스크 평가 (Project Schedule Risk Assessment Based on Bayesian Nets)

  • 성홍석;박철순
    • 산업경영시스템학회지
    • /
    • 제39권1호
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • 제10권1호
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

A Production-Installation Simulation Model of Free-Form Concrete Panels

  • Lim, Jeeyoung;Lee, Donghoon;Na, Youngju;Lim, Chaeyeon;Kim, Sunkuk
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.401-404
    • /
    • 2015
  • Demand on free-form buildings is gradually increasing, yet owing to the difficulty of production-installation work, several problems occur in the construction phase upon construction of a building, including the increased cost and construction duration, and reduced constructibility. To solve these problems, a techonology to produce FCP using a CNC(Computerized Numeric Control) machine is developed. The technology is that the information of designed free-form buildings to the CNC machine is transferred, and the transferred information is used for RTM(Rod-Type Mold, the mold shaped by back-up rods) and PCM(Phase Change Material) shaping, and the shaped RTM and PCM have the role of molds to produce FCP. Construction duration and project cost are limited in building sites, so the efficiency of processes like production-installation of FCP for application of the technology is significant. Since it is almost impossible to change the production-installation process at the construction phase when they are established, process should be deliberately decided. Therefore, the purpose of the study is to propose a production-installation simulation model of free-form concrete panels, in aspect of PCM. This paper is establishing the process for production-installation of FCP, estimating time required by each construction type and proposing a time simulation model that changes according to various constraints based on the analyses. With the time simulation model, it will be possible to build a cost model and to review the optimal construction duration and project cost.

  • PDF

프로젝트 네트워크에서 사업완성시간의 적률 추정 (Estimating the Moments of the Project Completion Time in Project Networks)

  • 조재균
    • 한국산업정보학회논문지
    • /
    • 제22권1호
    • /
    • pp.61-67
    • /
    • 2017
  • 프로젝트 네트워크 분석에서 사업완성시간의 분포를 추정하는 것은 매우 기본적이다. 본 논문에서는 활동시간이 상호 독립적이고 정규분포를 따른다는 가정 하에서 사업완성시간의 적률(평균, 분산, 왜도, 첨도)을 추정하기 위한 방법을 제안한다. 제안된 방법은 연속형의 활동시간 분포를 이산형 분포로 근사화하기 위한 이산화 기법과 난수발생을 이용한다. 제안된 방법은 대규모 네트워크에 대해서도 쉽게 적용 가능하며, 그리고 제안된 방법에 의한 결과는 몬테칼로 시뮬레이션에 의해 얻어진 결과와 비교할 때 매우 정확함을 보여준다.

건설프로젝트에 CCPM의 적용 (Application of CCPM to Construction Project)

  • 김영;이영대;김옥수;김성환;박혁
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.95-101
    • /
    • 2003
  • 제약이론은 특정한 관리기술을 개발하는데 사용되는 접근방법이며, 철학이다. 운영관리상에 적용되었던 소설 "The Goal"에 의해서 처음으로 널리 보급되었다. 1997이후로 프로젝트관리의 두 가지 영역에서 적용되어 왔으며, 그 첫 번째 적용은 단일프로젝트에 대한 공기단축과 프로젝트 통제관리의 간소화를 위한 공정관리분야이며, 두 번째 적용은 동시에 수행되는 여러 프로젝트에 의해서 공유되는 자원의 효과적 관리이다. 이 논문은 프로젝트 관리에 적용된 제약이론인 애로사슬(Critical chain)의 원리에 대해서 연구하고, 국내의 건설프로젝트에 적용하는 것을 목적으로 한다.