이산사건 시뮬레이션과 BIM을 활용한 설계대안 평가에 관한 연구 (Design Alternative Assessment Method using Discrete Event Simulation and Building Information Model)

  • 이창용;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.158-159
    • /
    • 2016
  • Construction project consists of several stages such as planning, design, construction, operation/maintain, etc. Decisions made in the planning and design stage have a significant impact on the construction and operation/maintain stages. Identifying key resources contributing to duration and cost of design alternatives is an important measure to achieve effective coordination between design and construction. This study proposes a method which finds an optimal design alternative by taking into account of resource planning, expected duration, and cost in construction stage. Base on literature review relative to the assessment of design alternatives, a method which predicts required resources, duration, and cost of the design alternative is established. Then, a method that identifies an optimal design alternative based on the preference of a certain project criteria is developed. Finally, a case study is presented.

  • PDF

FORECASTING THE COST AND DURATION OF SCHOOL RECONSTRUCTION PROJECTS USING ARTIFICIAL NEURAL NETWORK

  • Ying-Hua Huang ;Wei Tong Chen;Shih-Chieh Chan
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.913-916
    • /
    • 2005
  • This paper presents the development of Artificial Neural Network models for forecasting the cost and contract duration of school reconstruction projects to assist the planners' decision-making in the early stage of the projects. 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake, were collected. The developed Artificial Neural Network prediction models demonstrate good prediction abilities with average error rates under 10% for school reconstruction projects. The analytical results indicate that the Artificial Neural Network model with back-propagation learning is a feasible method to produce accurate prediction results to assist planners' decision-making process.

  • PDF

도시정비형 재개발사업 소요기간의 영향요인 - 사업구역과 경제적 및 입지적 특성을 바탕으로 - (A Study on the Factors affecting the Duration of Urban Redevelopment Projects - Based on the Project Area, Economic and Locational Characteristics -)

  • 이재원;배상영;정보선;이상엽
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.61-68
    • /
    • 2021
  • 본 연구는 서울의 도시화율이 높아지고 도심 내 노후·불량 주거지가 증가함에 따라 지속적인 정비사업의 필요성이 요구되는 가운데 장기간의 사업기간을 소요하는 도시정비형 재개발사업을 대상으로 사업기간에 영향을 미치는 요인을 분석하고자 하였다. 이를 위해 서울 전권역의 2005년 이후 사업구역으로 지정되어 관리처분계획인가까지 완료한 사업구역 중 데이터 구성이 가능한 75개 사업구역을 대상으로 설정하였다. 구역지정부터 관리처분계획인가까지 소요된 기간을 종속변수로 하여, 재개발사업구역의 특성과 경제적 특성, 입지적 특성을 독립변수로 설정하여 헤도닉가격모형으로 분석하였다. 분석결과, 사업구역 규모가 작을수록, 조합원 1인당 차지하는 구역면적이 클수록, 지가변동률이 클수록, KOSPI 지수가 작을수록 소요기간이 단축되는 것으로 나타났다. 본 연구는 사업구역의 규모를 고려한 특성 변수와 사업 진행 시기의 경제적 특성, 입지적 특성을 모형으로 하여 사업의 소요기간에 미치는 영향을 실증분석하였다는 점에서 기존 연구와 차별점을 가진다. 연구결과를 통해 본 연구는 도시정비형 재개발사업의 사업구역 설정 시 사업구역 면적과 조합원수, 경제적 상황 등이 고려되어야 한다는 시사점을 제공하며 이를 통해 재개발사업을 추진하는 시행자와 시공자, 금융기관 등의 사업참여자와 이를 관리하는 지자체 관계자들의 합리적인 의사결정에 도움이 되고자 한다.

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

절충교역 계약 소요기간 영향요인 (Influencing Factors on the Duration of Offset Agreement)

  • 홍석수;정태윤;서재현;홍문희
    • 기술혁신연구
    • /
    • 제20권1호
    • /
    • pp.1-15
    • /
    • 2012
  • 우리나라는 1983년에 절충교역 제도를 도입하여 국방 전력증강의 효율적 수단으로 활용하여 왔다. 그런데 절충교역은 계약체결이 획득기술에 대한 가치평가 결과를 근거로 이루어지기 때문에 국외업체와의 협상 등 업무과정상 지연될 가능성이 존재한다. 절충교역 계약체결이 지연되면 무기체계 구매사업이 늦어져 국방 전력증강에 심각한 악영향을 주게 된다. 따라서 본 연구에서는 절충교역 계약 과정, 특히 계약 소요기간에 영향을 미치는 요인들을 통계적으로 분석하여 소요기간을 결정하는 요인을 규명하고자 하였다. 영향 요인으로는 국외업체 국적, 사업진행 형태 (경쟁/단독 입찰), 사업 특성 (최초/계속 사업), 최초 제안기술의 수, 국내 무기체계 분야별 국방과학기술수준, 기본사업 규모 등 6개를 고려하였다. 가설 검증은 절충교역 계약이 체결된 25개 사업을 대상으로, 상관분석 및 다중회귀분석을 통하여 이루어졌다. 상관분석 결과에 의하면, 기본사업 규모, 최초 제안기술의 수, 사업 특성 등이 종속변수인 절충교역 계약 기간과 양의 상관관계를 갖고 있음을 알 수 있었다. 다중회귀분석 결과에서는 기본사업 규모와 사업진행 형태가 절충교역 계약 소요기간에 유의한 영향을 미치는 것으로 나타났다.

  • PDF

Prioritization of Price Volatility Management Strategies in Construction Projects

  • Joukar, Alireza;Nahmens, Isabelina;Harvey, Craig
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.15-25
    • /
    • 2017
  • The existence of material price volatility in construction projects puts forward substantial risks for all parties involved. Depending on the parties involved in the project, type of contracts, and state of the market various risk management strategies are practiced by contracting parties to manage project risks related to price volatility. Unfortunately, in many cases companies fail to select an adequate approach to better manage volatilities of material prices due to the lack of a decision support system to aid in the selection of an appropriate strategy based on the project characteristics. The aim of this study is to identify critical project factors and align them to documented strategies to manage price volatility based on an extensive literature review and industry interviews. This study found Integrated Project Delivery (IPD) as the ideal strategy with respect to project duration; quantitative risk management methods with respect to the cost; and Price Adjustment Clauses (PAC) with respect to the risk allocation, as the top price volatility management strategies.

재정비촉진사업에서 조합원의 부동산 보유기간에 따른 재정착 결정요인 분석 (The Determinants Influencing Residential Resettlement of Union Members by Real Estate Ownership Duration in Redevelopment Promotion Project)

  • 윤방현;김홍배
    • 한국콘텐츠학회논문지
    • /
    • 제18권3호
    • /
    • pp.286-298
    • /
    • 2018
  • 본 연구는 재정비촉진사업의 조합원을 대상으로 인구, 경제적, 주거환경, 정책적 특성을 고려하여 재정착 결정요인을 도출하고, 조합원 재정착을 제고하기 위해 정책적 시사점을 제언하였다. 연구의 방법은 조합원의 부동산보유기간을 조합설립인가를 기준으로 10년 이상과 10년 미만으로 구분하고, 로지스틱 회귀분석을 사용하여 각 그룹별 조합원 재정착 결정요인을 도출하였다. 연구결과, 부동산 보유기간 10년 이상인 조합원은 가구주 연령, 이웃과의 관계, 분양가격, 사업지역 내 거주, 부동산 가격상승에 대한 만족도가 높을수록 재정착 결정 확률이 높은 것으로 나타났다. 부동산 보유기간 10년 미만인 조합원은 부동산 가격상승, 분양가격, 용적률 인센티브에 대한 만족도가 높을수록 재정착 결정 확률이 높은 것으로 나타났다. 정책적 시사점은 부동산 보유기간에 따른 자산 가치 상승을 고려하고, 경제적 상황을 반영하여 맞춤형 금융지원을 해야 한다.

시뮬레이션을 이용한 도로포장 공정계획의 수립방안 (An Application of Simulation Method to Planning of Road Pavement Operation)

  • 온성원;김옥기;우성권
    • 한국건설관리학회논문집
    • /
    • 제8권1호
    • /
    • pp.124-131
    • /
    • 2007
  • 공정관리는 일정 계획에 따라 공사의 진도를 관리하는 것뿐만 아니라 프로젝트를 주어진 공기 내에 완성하기 위하여 시공 방법 및 계획을 마련하고 이에 따른 장비, 자재, 인원 등에 대한 계획을 수립하는 것을 포함한다. 본 연구는 실제 고속도로 건설공사 중 포장공정의 계획 수립에 있어서 린 콘크리트 포장작업과 콘크리트 슬래브 포장작업을 대상으로 시뮬레이션 모델을 개발하고 이를 이용하여 공정계획을 수립하는 방안을 제시하고 있다. 또한, 시뮬레이션 모델을 이용하여 수립된 계획과 해당 현장의 기존 포장공정 계획을 비교함으로서 비용과 공기 측면에서 보다 생산적이고 효율적인 대안의 수립에 시뮬레이션 기법이 효과적인 방법론이 될 수 있음을 보여 준다. 결국, 본 연구를 통해 건설공사의 시공 계획을 수립하는 초기단계에서 시뮬레이션 모델을 구축하여 체계적이고 과학적인 분석을 수행하게 되면 보다 효율적이고 생산적인 건설공정 계획 및 관리가 가능하다는 사실을 확인하고 있다.

개선된 자원 평준화 기법을 활용한 적정 공기산정 방안 (Optimal Project Duration Estimation Through Enhanced Resource Leveling Technique)

  • 김경환;윤영상;김재준
    • 한국건설관리학회논문집
    • /
    • 제5권5호
    • /
    • pp.126-134
    • /
    • 2004
  • 건설프로젝트는 일정한 기간 동안 주어진 목표를 수행하기 위한 작업들의 모임이라 정의할 수 있으며, 이를 위해서는 필요한 자원의 효율적 계획 및 관리가 필요하고, 이때 자원배당 및 자원평준화 기법이 활용된다. 하지만 자원제약이 있는 자원배당과 공기 제한이 있는 자원평준화 방법은 하나의 프로젝트에 개별적으로 적용되고 있어 전체 프로젝트의 공기와 효율적 자원이용 측면에서 적정화하기는 어렵다. 따라서 본 연구는 자원 평준화 방법의 Minimum Moment Algorithm 개념을 확대$\cdot$적용하여 적정 자원이용 및 공사기간을 산출하고자 한다. 이때 자원 활용의 상태를 나타내는 5가지 지표가 사용되며, 이들간의 중요도를 파악하기 위해 공정전문가를 대상으로 설문조사를 실시하였다. 마지막으로 가상 프로젝트의 적용을 통해 본 모형의 적용 가능성을 검증하고자 하였다.

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.