Optimal Project Duration Estimation Through Enhanced Resource Leveling Technique

개선된 자원 평준화 기법을 활용한 적정 공기산정 방안

  • Published : 2004.10.01

Abstract

Since a construction project is a series of works that utilizes resources to accomplish the project goal for a given time period, efficient resource management is a prerequisite for the success of the project. Two major areas of resource management are resource constrained scheduling focusing on the limited resource availability and resource leveling focusing on smoothing resource usage pattern on the fixed project completion time. It is not available, however, to apply both techniques to a project at the same time. This paper proposes a model to enhance the minimum moment algorithm of resource leveling, aiming to find an efficient usage of resources and an appropriate project completion time. A survey was performed to evaluate the major five factors in the model. A case study demonstrates the value of the proposed resource leveling technique.

건설프로젝트는 일정한 기간 동안 주어진 목표를 수행하기 위한 작업들의 모임이라 정의할 수 있으며, 이를 위해서는 필요한 자원의 효율적 계획 및 관리가 필요하고, 이때 자원배당 및 자원평준화 기법이 활용된다. 하지만 자원제약이 있는 자원배당과 공기 제한이 있는 자원평준화 방법은 하나의 프로젝트에 개별적으로 적용되고 있어 전체 프로젝트의 공기와 효율적 자원이용 측면에서 적정화하기는 어렵다. 따라서 본 연구는 자원 평준화 방법의 Minimum Moment Algorithm 개념을 확대$\cdot$적용하여 적정 자원이용 및 공사기간을 산출하고자 한다. 이때 자원 활용의 상태를 나타내는 5가지 지표가 사용되며, 이들간의 중요도를 파악하기 위해 공정전문가를 대상으로 설문조사를 실시하였다. 마지막으로 가상 프로젝트의 적용을 통해 본 모형의 적용 가능성을 검증하고자 하였다.

Keywords

References

  1. 권춘안, '건설공사 일정계획의 시스템 개선에 관한 연구', 대한건축학회지, 대한건축학회, 제17권 제2호, 2000, pp.83-92
  2. 김경래, '최신 공정관리학', 기문당, 2003, p.33
  3. 김경환, ‘RCPM기법을 이용한 일정관리와 공기연장 분석 방법', 대한건축학회지, 대한건축학회, 제20권 제1호, 2004, pp. 157-164
  4. 김석봉, 'PERT/CPM에 의한 건축공사의 공정관리합리화 방안에 관한 연구', 서울대학교 대학원 석사학위논문, 1984
  5. 김정진, 'PERT/CPM을 활용한 건축공사의 적정인력 배당에 관한 연구', 연세대학교 대학원 박사학위논문, 1983
  6. 변상봉, 'Heuristic Resource Leveling Method 에 의한 Unlimited Resource 의 Leveling 에 관한 연구', 중앙대학교 대학원 석사학위논문, 1987
  7. 조근태 외 2명, '앞서가는 리더들의 계층분석적 의사결정', 동현출판사, 2003
  8. Karshens, 'Economic Optimization of construction project scheduling', J. Constr. Mang, and Economics, E&FN Spon, Vol. 8, No.2, 1990, p.135
  9. Kim, K, 'Phantom Float', J. Constr. Eng. and Manag., ASCE, Vol. 129, No.5, 2003, p.51
  10. Donals S. Barrie, Professional Construction Management 건설관리의 개념과 실제, 한국건설관리학회 역, 2000
  11. F. Laworence Benett, 'Critical Path Scheduling Algorithm', J. of Constr. Div., Vol. 94, No.2, 1968, p.161
  12. Moselhi, 'Least impact algorithm for resource allocation', Can. J. Civ. Eng., CSCE, Vol. 20, No.2, 1993, p.180
  13. Martinez J., and Loannou P., J. Constr. Eng. and Manag. Program, Dep. of Civil Eng., G. G. Brown Building, The Univ. of Michigan, Ann Arbor, MI 48109-2125, tel. (313) 764-8495
  14. Wickwire, J. M., Driscoll, T. J., and Hurlbut, S. B., Construction Scheduling : Preparation, liability, and claim, 2001 cumulative supplement, Aspen Law & Business, NewYork, 1999
  15. William J., and Martin A, O'Brien, 'Importance of Capacity Constraint to Construction Cost and Schedule', J. Constr. Eng. and Manag., ASCE, Vol. 126, No. 5, 2000, p.371
  16. Thomas. L. Satty, The Analytic Hierarchy Process, McGraw-Hill, 1980