• Title/Summary/Keyword: Project delivery system

Search Result 226, Processing Time 0.028 seconds

Trends in Disaster Prediction Technology Development and Service Delivery (재난예측 기술 개발 및 서비스 제공 동향)

  • Park, Soyoung;Hong, Sanggi;Lee, Kangbok
    • Electronics and Telecommunications Trends
    • /
    • v.35 no.1
    • /
    • pp.80-88
    • /
    • 2020
  • This paper describes the development trends and service provision examples of disaster occurrence and spread prediction technology for various disasters such as tsunamis, floods, and fires. In terms of fires, we introduce the WIFIRE system, which predicts the spread of large forest fires in the United States, and the Metro21: Smart Cities Institute project, which predicts the risk of building fires. This paper describes the development trends in tsunami prediction technology in the United States and Japan using artificial intelligence (AI) to predict the occurrence and size of tsunamis that cause great damage to coastal cities in Japan, Indonesia, and the United States. In addition, it introduces the NOAA big data platform built for natural disaster prediction, considering that the use of big data is very important for AI-based disaster prediction. In addition, Google's flood forecasting system, domestic and overseas earthquake early warning system development, and service delivery cases will be introduced.

Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.

A Study of BIM Delivery Model for Railway Construction Project using BIM Function Breakdown Structure (BIM 기능요소 분류체계 도출에 의한 철도시설공사 BIM 기능발주 구성 방안)

  • Kim, Young-Hwan;Kim, Hyeon-Seung;Kang, Leen-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.344-353
    • /
    • 2015
  • Recently, the utilization of the BIM system has been extended to cost and resource simulation, visualized management of construction site information and application of augmented reality including basic 3D modeling. Therefore, various BIM functions are being developed for practical applications. However, since clear classification criteria and knowledge information of BIM functions are not sufficient for field engineers, it is difficult to identify the necessary BIM functions for a construction project. This study suggests a BIM function breakdown structure considering the individual functional properties and a process model that can be ordered by applying BIM in a railway construction project. The proposed delivery model is used to obtain a practical utilization of BIM by analyzing features applicable to railway construction projects; model is verified using a case project.

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

A Study on the Scale Effort Estimation Model based on Industry Characteristics (산업별 특성에 따른 소요공수 규모 산정 모델 연구)

  • Kwoak, Song-Hae;Park, Koo-Rack;Kim, Dong-Hyun
    • Journal of Digital Convergence
    • /
    • v.14 no.11
    • /
    • pp.233-240
    • /
    • 2016
  • Information system development projects, have a mechanism for many of the costs generated by a variety of risk factors. In general, the probability that the software project of the information system is carried out successfully in the delivery time is very low. This prediction of a formal cost is needed as the most important factor since it can prevent the project from being failed. However, objectivity of most of the project scale calculation during the calculation criteria is insufficient. Further, it is the actual situation that the management of the base line is not properly made during the project. Therefore, in this paper, we propose a model to calculate the number of steps it takes to develop on the basis of a methodology in an attempt to overcome the limitation of being unpractical in the early stage of the information system development project. It is expected to be a tool to estimate the effort and cost required by the information system development business through these convergence proposals model.

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project (공공토목사업 CM 발주를 위한 단계별 업무지원 시스템 구축)

  • Chae, Yeong-Seok;Park, Seo-Young;Moon, Hyoun-Seok;Kim, Seon-Yeong;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.81-92
    • /
    • 2011
  • Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.

A Review of Routing Plan for Unmanned Aerial Vehicle : Focused on In-Country Researches (국내 무인항공기의 경로계획 연구)

  • Kim, Jinwoo;Kim, Jinwook;Chae, Junjae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.212-225
    • /
    • 2015
  • UAV (Unmanned Aerial Vehicle), the pilotless plane or drone, draws researchers' attention at these days for its extended use to various area. The research was initiated for military use of the UAV, but the area of applicable field is extended to surveillance, communication, and even delivery for commercial use. As increasing the interest in UAV, the needs of research for operating the flying object which is not directly visible when it conducts a certain mission to remote place is obviously grown as much as developing high performance pilotless plane is required. One of the project supported by government is related to the use of UAV for logistics fields and controlling UAV to deliver the certain items to isolated or not-easy-to-access place is one of the important issues. At the initial stage of the project, the previous researches for controlling UAV need to be organized to understand current state of art in local researches. Thus, this study is one of the steps to develop the unmanned system for using in military or commercial. Specifically, we focused on reviewing the approaches of controlling UAV from origination to destination in previous in-country researches because the delivery involves the routing planning and the efficient and effective routing plan is critical to success to delivery mission using UAV. This routing plan includes the method to avoid the obstacles and reach the final destination without a crash. This research also present the classification and categorization of the papers and it could guide the researchers, who conduct researches and explore in comparable fields, to catch the current address of the research.

Improving Maintenance Management Practices for Building Facility

  • Ismail, Zul-Atfi
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.21-32
    • /
    • 2014
  • The practiced conventional methods for maintenance management in Malaysian Polytechnic faced many issues due to poor service delivery, inadequate finance, poor maintenance plan and maintenance backlogs. The purpose of this study is to improve the conventional method practices which tend to be ineffective in Malaysian Polytechnic. The case studies were conducted with eight Polytechnics and are selected based on conventional method practices and its major problems. There are around 32 Polytechnics in Malaysia and almost are using conventional methods. The number is considered very big indicating that the use of modern Information and Communication Technology (ICT) is still very limited compared to other institutions of higher learning in Malaysia. The overall findings of this research indicated; poor service delivery, inadequate financial, poor maintenance planning and maintenance backlogs. There is also need to overcome less man power competencies of maintenance management practices which existed with all eight Polytechnics. The proposed system is intended to be used for maintenance management practices at Malaysian Polytechnics in order to provide high-quality of building facility with safe and healthy environments.

A Study on the Estimate DSS for Bidding and Negotiation in the Paper Plant Construction Engineering (제지공장건설 수주를 위한 견적 의사결정지원시스템에 관한 연구)

  • 이규식;성기호;이성용
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1999.04a
    • /
    • pp.209-210
    • /
    • 1999
  • In the case of paper plant engineering company, one of the most important critical problems is to accurately estimate the cost and the delivery time of the project. This is necessary for the company to win a bidding and to have some room for negotiation. Moreover, the company needs to have time to process all the relevant informations to make timely response to, and deal with the changing conditions of the bidding environments as quickly as possible. One of the popular methodology dealing with this kind of situation is an effective "decision support system," and may researches are currently been done on this subject. In this article, and effective decision support system is developed which can provide automatic delivery time and cost estimates from which plant engineering company may be benefited.

  • PDF

A Study on Way to Revitalize the Service Delivery System in the Hinterland Villages in Non-Urbanized Area (비도시지역 배후마을 서비스전달체계 활성화방안 연구)

  • Haechun Jung;Heeseung Yang
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.6
    • /
    • pp.533-544
    • /
    • 2023
  • The Ministry of Agriculture, Food and Rural Affairs has been promoting policies to strengthen the functions of rural centers (culture, welfare, economy, education, etc.) and to ensure that services from the centers are delivered to and connected to hinterland villages. For this policy purpose, the rural center revitalization project and the basic living base creation project within the rural development projects are being promoted. However, in the process of carrying out the actual project, as the focus is on strengthening the functions of rural centers, service delivery and connection with hinterland villages are not being actively promoted. therefore, in this study, we analyze the projects previously carried out in Jeoksang-myeon, Muju-gun and the regional status, analyze the reasons why hinterland village services were not connected and activated, and propose a direction for the second phase of the basic living base creation project to be carried out in the future. As a result of analyzing the reasons for the failure of hinterland village services to be activated, problems such as disadvantages in accessing services due to dispersed residence in rural areas and limitations in topographical structure, and the lack of a service delivery system to develop demand in hinterland areas were found to be problems. Improvement measures were derived as follows. First, it is a stepping stone construction plan proposed to overcome topographical limitations. Establish a stepping base that will function as a service intermediate terminal to ensure efficient service delivery. Second, for a rational decision-making structure, we proposed a plan for deploying communication channels that could closely collect local opinions by operating various small-scale communities along with the efficient composition of a resident committee that includes residents of the central and hinterland villages and various classes. Third, it is a virtuous cycle of local manpower training plans that train local residents into professional instructors. We aim to complete a sustainable, resident-led service supply system by nurturing the most important service deliverers, that is, activists, in service delivery.