• Title/Summary/Keyword: Project cost

Search Result 2,467, Processing Time 0.028 seconds

Design Value Analysis and LCC Analysis Model of Water Supply System Project (수도시설의 설계VA 및 LCC 분석모델)

  • Lim Jong-Kwon;Jung Pyung-Ki;Seo Jong-Won;Lee Jae-Sun;Cho Kook-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.469-472
    • /
    • 2003
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a life cycle cost analysis model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

  • PDF

Roadway Preliminary Cost Estimation Prototype based on BIM and GIS (BIM/GIS 기반 도로 개략공사비 산정 프로토타입 연구)

  • Park, Wonyoung;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.14-21
    • /
    • 2013
  • While a detailed cost estimation utilizes the comprehensive quantity information obtained from a complete drawing and specification, an approximate cost estimation heavily relies on the subjective decisions. This phenomenon is because the approximate estimation is usually conducted in early stage of the construction phase where the drawing and specification are not available. This study developed a roadway construction cost estimation system which enables users to estimate the approximated cost of the project in early stage. The system identifies the variation of the construction costs due to the road route change using a cased based reasoning(CBR) method. Overall the system is expected to improves the accuracy and effectiveness of the estimation process, because it would provide users with increased accessability and consistent results in early stage of the project which leaded to the increased work transparency.

Economical and Environmental Feasibility of Cultivation under Structure Due to the Introduction of Bio-energy -Comparative Analysis of Wood Pellets and Diesel- (목재펠릿 도입에 따른 시설재배의 경제적.환경적 타당성 분석 -목재펠릿과 경유의 비교분석을 중심으로-)

  • Yang, Jeong-Soo;Yoon, Sung-Yee
    • Korean Journal of Organic Agriculture
    • /
    • v.21 no.3
    • /
    • pp.335-350
    • /
    • 2013
  • With the efforts to development of renewable energy technologies, and increasing awareness to environmental issues, the usage of wood pallets has been increasing every year since the introduction of wood pallet technology to the domestic market. until 2009, majority usage of pellet boiler was in the residential houses. In an effort to increase the distribution of wood pellet boiler to cultivation facilities with high usage of fuels, The Ministry of Agriculture and Forestry has launched a distribution project of wood pellet boiler for fuel usage as a part of the agricultural and fishery energy efficiency projects. Although only small number of farms with a heat-culturing facility have replaced from conventional boiler to pellet boiler. Although part of reason for low usage of pallet boiler is lack of understanding and information of it, the main reasons are high initial cost and uncertainty of its cost efficiency. Also, most people from agricultural industry don't realize it's significance in terms of environmental benefit due to lack of understanding in 'resource circulation' and 'adopting to climate change'. In this study, first, we did a cost-efficiency analysis of the farm which uses a diesel boiler to grow cucumber, tomato, paprika. Then we replaced the diesel boiler to a pallet boiler and measured its cost-efficiency again. By comparing the cost-efficiency of the diesel boiler with the pellet boiler, we analyzed the economic viability of pellet boiler. Then we analyzed viability of pallet boiler usage in terms of 'resource circulation' and 'adopting to climate change'. As a result of our analysis, we have found out that under the current system of government support, the energy usage varies depends of the types crops grown and the higher the energy use, the more cost efficient it is to use the pallet boiler. Also, it is economically viable to use the pallet boiler in terms of 'resource circulation' and 'adopting to climate change'.

Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project - (갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 -)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.87-94
    • /
    • 2012
  • The apartment reconstruction projects have the proper functions such as residential environment improvement and the new housing allocation system; however, intention of the projects are distorted by the combination of factors, like failure of relocation of the original occupants and income redistribution, speculation in real estate, sharp rise in housing price, disputation between various interested parties, inadequate system and etc and it makes the projects unable to go well. Disputations and litigations are due to spread of the small conflict. As a result of the problems, it could not going smoothly and that lead to increase or stop the period and cost. This study is to estimate the period and cost using the conflict index so as to prevent and solve the problem which is among the conflict in the reverse functions. The conflict index has estimated focus on the conflict impact and the period and cost has been estimated using an variable independent including the conflict index. Also, estimated the conflict index and estimate of the period and cost are able to succeed with a minimum of disputation and money.

Neural Network Model for Construction Cost Prediction of Apartment Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.139-147
    • /
    • 2009
  • Accurate construction cost estimation in the initial stage of building project plays a key role for project success and for mitigation of disputes. Total construction cost(TCC) estimation of apartment projects in Vietnam has become more important because those projects increasingly rise in quantity with the urbanization and population growth. This paper presents the application of artificial neural networks(ANNs) in estimating TCC of apartment projects. Ninety-one questionnaires were collected to identify input variables. Fourteen data sets of completed apartment projects were obtained and processed for training and generalizing the neural network(NN). MATLAB software was used to train the NN. A program was constructed using Visual C++ in order to apply the neural network to realistic projects. The results suggest that this model is reasonable in predicting TCCs for apartment projects and reinforce the reliability of using neural networks to cost models. Although the proposed model is not validated in a rigorous way, the ANN-based model may be useful for both practitioners and researchers. It facilitates systematic predictions in early phases of construction projects. Practitioners are more proactive in estimating construction costs and making consistent decisions in initial phases of apartment projects. Researchers should benefit from exploring insights into its implementation in the real world. The findings are useful not only to researchers and practitioners in the Vietnam Construction Industry(VCI) but also to participants in other developing countries in South East Asia. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be also useful to participants in Korea.

A Study on the Design Value Analysis Model Using Probabilistic LCC Analysis of Water Supply System Project (확률적 LCC분석기법을 활용한 수도시설물의 설계VA모델에 관한 연구)

  • Jung Pyung-Ki;Seo Jong-Won;Lim Jong-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.181-193
    • /
    • 2004
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a probabilistic life cycle cost analysis (PLCCA) model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented probabilistic life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

Development of Cost-Benefit Analysis Model for GIS Projects (GIS사업의 비용편익분석 모형개발)

  • Kim, Jung-Ok;Heo, Yong;Yu, Ki-Yun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.1 s.28
    • /
    • pp.79-85
    • /
    • 2004
  • The GIS(Geographic Information System) projects require big initial investment and cost of maintenance. Decision makers would not launch GIS projects unless they are convinced of the benefits of the projects. Therefore the purpose of this paper is to develop an appropriate model for GIS project evaluation. We proposed a GIS project evaluation model and summarize the steps involved in Cost-Benefit Analysis(CBA). The costs of a GIS implementation include hardware and software cost, costs of database development, training expenses, annual maintenance expenses, and other annual expenses. The benefit by using GIS has been assessed into Type I(direct benefits), Type II(indirect benefits), Type III(benefits that result from the sale of information services), Type IV(intangible benefits).

  • PDF

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

A Study on the Scope of the Recognized Equity Capital of Developer in Real Estate Project Finance Loan Screening (부동산 PF를 위한 시행사의 자본금 인정범위에 관한 연구)

  • Lim, Suhong;Jang, Hokwan;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.75-83
    • /
    • 2020
  • This study intends to explore the scope of the recognized equity capital of developer in real estate project finance loan screening. The factors which can be recognized as equity capital are categorized into 24 factors with 3 upper categories and 6 mid categories. In order to develop the importance weight of factors, AHP and Fuzzy methodologies are implemented based on survey analysis by experts in financial institutions. Research findings indicate that the land cost, evacuation cost, and real estate acquisition tax as land-related direct costs, and the design cost, traffic impact assessment cost, underground safety impact assessment cost, boundary surveying cost, and geological survey cost as the construction permit-related costs are higher than any others. On the other hand, the supplementary costs related to the operation of the developer show very low importance weight. Accordingly, the hierarchy of factors for equity capital should be clearly developed in order to minimize any dispute and prevent non-performing loans to real estate project finance.

Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method (DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석)

  • Lee, A-Yeon;Chang, Mi-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.