• Title/Summary/Keyword: Project cost

Search Result 2,467, Processing Time 0.034 seconds

Cost Estimating method for the Public Office building at the early stage (공공건축물의 초기공사비 산정방법 연구)

  • Koo, Won-Yong;Kim, Jung-Gon;Lee, Jun-Seok;Park, Hyeong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.261-266
    • /
    • 2007
  • In this research, we studied an estimating method in client's sight to estimate the total construction cost which is based on the historical cost data at the early stage of the office buildings as a public phase. It is very difficult to analyze the estimation accurately and logically. When a client estimates a project, he/she has to consider there are many issues at the planning step, according as office buildings become gradually diversified as well as their roles continuously extended. Therefore, those are usually make problems for wasting the budget in accordance with the cost estimation errors. Moreover, many kinds of public construction projects, especially such as school, office, sports complex, and the others, have been invested the private finances defined as BTL(Build Transfer Lease) method that are required to manage the detailed process more strictly from initial planning. In order to make an effective planning, the long-term users amount and the building life cycle at the beginning of project should be considered previously and then it may enable to achieve an appropriate project plan. But actually considering overall variables in a building planning is impossible. Accordingly, suggesting a regression model based on the historical cost data from many similar types of office building to support client's role known as estimating the total cost at the early stage. And then performing the test against the proposed model to research the reasonability as using the historical cost data of Japan office buildings.

  • PDF

Analysis of defense procurement agency Study on the appropriate brokerage fee and effectiveness (군수품 무역대리점의 효과성과 적정 중개수수료에 관한 연구)

  • Jeong, Suk-Jae;Kim, Jun Han
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.184-190
    • /
    • 2020
  • In this study, two analyses were conducted in relation to the defense procurement agency. The first was a questionnaire survey conducted by defense business personnel to quantitatively measure the effectiveness of the defense procurement agency's utilization. In the second, the appropriate standard for brokerage fees was developed, the actual work of the defense procurement agency in overseas sales was surveyed, and the brokerage profit of the general product was applied to the defense procurement agency's brokerage profit data. Using the defense procurement agency was 1.07 times more effective than not using it, and the appropriate brokerage fee varied according to the project size. For medium / small projects, 5.1 ~ 8.7% of the total project cost is an appropriate brokerage fee, compared to 1.2 ~ 1.8% for big-scale projects. The government's appropriate brokerage fee is not fixed, but is elastically applied according to the size of the total project cost, and it is appropriate to analyze the characteristics of the project and identify and adjust the required activity cost in advance.

Economic Analysis of the Fuel Forests Established by I.B.R.D. Saemaeul Project Loan (I.B.R.D. 새마을사업차관(事業借款)에 의한 연료림조성(燃料林造成)의 경제분석(經濟分析)에 관한 연구(硏究))

  • Song, Byong Min;Park, Tai Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.59 no.1
    • /
    • pp.9-14
    • /
    • 1983
  • The study was performed to decide the returns or investment efficiency of the fuel forest established project and to examine its economic value as compared the benefit with the cost occurring from that established by I.B.R.D loan. The data got from the surveying plot and other things connected with the project were applied to the measures of benefit-cost ratio and internal rate of return (IRR). The following are the results from the economic analysis of the fuel forest created by the loan per hectare 1) In case of converting the fuelwood value from the fuel forest into briquet price, the benefit-cost ratio is 1.18 at the 6 percent discount rate and the IRR is appraised to 12.2 percent 2) In the sensitivity analysis estimated by the rising rate of rural wages 27% the yearly mean, the B/C ratio is 1.07 at the 6 percent discount rate and the IRR 9.2 percent. 3) In the sensitivity analysis estimated by the rising rate of briquet price, 26% the yearly mean, the B/C ratio is 1.34 at the 6 percent discount rate and the IRR is appraised high to 15.7 percent 4) In the event of including indirect effects to the direct in the project, the economic effect could be increased just a little more.

  • PDF

THE INFLUENCE OF THE PROJECT MANAGER ON THE SUCCESS OF THE CONSTRUCTION PROJECTS

  • Mahdi M Abdulsamad Ali;Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.345-353
    • /
    • 2009
  • The success and failure of any project depends upon many factors, the Project Manager is considered to be the key contributor to the success of any project, as well as a guide to the team members to achieve the client satisfaction (Cost, Time and Quality). Therefore the main aim of this paper is to provide a practical approach for understanding the importance of the Project Manager and his effectiveness to the success of the construction projects. In addition, the Project Manager's roles, responsibilities and duties have direct impact to the success of the construction projects. In order to identify the thoughts and opinion of the construction industry on this particular assertion, a quantitative study was carried out within the UK construction industry. The result of the study shows that there is an extremely strong correlation between the Project Manager and the success of the construction projects. In construction projects the Project Manager is considered to be one of the most important people who can lead and drive the projects in the right direction and conclude construction projects successfully. Moreover, these can play the most important role regarding the improvement of the organization's performance, the organization's profitability and the client's satisfaction. The research confirmed that the Project Manager is a very essential element to the success of the construction project and have an impact at every stage of the construction project. So it concluded that selection of a Project Manager should be carefully done with regard to experience, knowledge, power/authority and good understanding to the kind of the project.

  • PDF

Development of the Model for Total Quality Management and Cost of Quality using Activity Based Costing in the Hospital (병원의 활동기준원가를 이용한 총체적 질관리 모형 및 질비용 산출 모형 개발)

  • 조우현;전기홍;이해종;박은철;김병조;김보경;이상규
    • Health Policy and Management
    • /
    • v.11 no.2
    • /
    • pp.141-168
    • /
    • 2001
  • Healthcare service organizations can apply the cost of quality(COQ) model as a method to evaluate a service quality improvement project such as Total Quality Management (TQM). COQ model has been used to quantify and evaluate the efficiency and effectiveness of TQM project through estimation between cost and benefit in intervention for a quality Improvement to provide satisfied services for a customer, and to identify a non value added process. For estimating cost of quality, We used activities and activity costs based on Activity Based Costing(ABC) system. These procedures let the researchers know whether the process is value-added by each activity, and identify a process to require improvement in TQM project. Through the series of procedures, health care organizations are service organizations can identify a problem in their quality improvement programs, solve the problem, and improve their quality of care for their costumers with optimized cost. The study subject was a quality improvement program of the department of radiology department in a hospital with n bed sizes in Metropolitan Statistical Area (MSA). The principal source of data for developing the COQ model was total cases of retaking shots for diagnoses during five months period from December of the 1998 to April of the 1999 in the department. First of the procedures, for estimating activity based cost of the department of diagnostic radiology, the researchers analyzed total department health insurance claims to identify activities and activity costs using one year period health insurance claims from September of the 1998 to August of the 1999. COQ model in this study applied Simpson & Multher's COQ(SM's COQ) model, and SM's COQ model divided cost of quality into failure cost with external and internal failure cost, and evaluation/prevention cost. The researchers identified contents for cost of quality, defined activities and activity costs for each content with the SM's COQ model, and finally made the formula for estimating activity costs relating to implementing service quality improvement program. The results from the formula for estimating cost of quality were following: 1. The reasons for retaking shots were largely classified into technique, appliances, patients, quality management, non-appliances, doctors, and unclassified. These classifications by reasons were allocated into each office doing re-taking shots. Therefore, total retaking shots categorized by reasons and offices, the researchers identified internal and external failure costs based on these categories. 2. The researchers have developed cost of quality (COQ) model, identified activities by content for cost of quality, assessed activity driving factors and activity contribution rate, and calculated total cost by each content for cost for quality, except for activity cost. 3. According to estimation of cost of quality for retaking shots in department of diagnostic radiology, the failure cost was ₩35,880, evaluation/preventive cost was ₩72,521, two times as much as failure cost. The proportion between internal failure cost and external failure cost in failure cost is similar. The study cannot identify trends on input cost and quality improving in cost of qualify over the time, because the study employs cross-sectional design. Even with this limitation, results of this study are much meaningful. This study shows possibility to evaluate value on the process of TQM subjects using activities and activity costs by ABC system, and this study can objectively evaluate quality improvement program through quantitative comparing input costs with marginal benefits in quality improvement.

  • PDF

Investigating the Impacts of the Quality of Project Management Information System on Project Performance and User Satisfaction (프로젝트 관리 정보시스템 품질이 프로젝트 성과와 사용자 만족도에 미치는 영향)

  • Park, So-Hyun;Lee, Taewon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.50-60
    • /
    • 2018
  • The use of Project Management Information System (PMIS) is increasing in project management industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project performance. However, how much and which parts of project management performance are affected by PMIS still need to be studied further. The purpose of this study is to investigate the impact of PMIS quality on project management performance. We collected data from various project based industries such as construction, defense, manufacturing, software development and telecommunication by using survey questionnaire. PMIS quality was measured in three dimensions. They are system quality, information quality and service quality. Project management performance was measured in nine variables such as time reduction, work accuracy, cost management, etc. Statistical analyses such as multiple regression were used to analyze the data. The results showed that PMIS quality had significant impacts on the project management performance and user satisfaction. It was notable that only two dimensions out of the three PMIS quality dimensions, system quality and information quality, affected the project management performance. Also, it was found that PM performance played a mediating role between PMIS and user satisfaction, and between PMIS and reuse intention. The contribution of this research is that it helps to clarify what aspects of PMIS affect the project management performance and user satisfaction.

Construction Cost Analysis of HPC Method by PC Construction Project Cases (사례분석에 의한 HPC공법의 공사비 분석)

  • Noh, ju-seong;Kim, Jae-yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.101-102
    • /
    • 2017
  • This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

  • PDF

A Cost Optimization Model of IT Operation Service by Improving Service Request Management Process (서비스 요청 관리 프로세스 개선을 통한 IT 운영비용 최적화 방안)

  • Kang, Un-Sik;Bae, Kyoung-Han;Kim, Hyun-Soo
    • Journal of Information Technology Services
    • /
    • v.6 no.3
    • /
    • pp.87-110
    • /
    • 2007
  • Recently, researches on IT Service Management (ITSM) for improving information system operation service and information system outsourcing cost estimation model are proliferating. This study suggests a new cost model of IT operation service and optimizing method based upon the characteristics of operation service as a long-term and continuous business service for both user's and service provider's point of view. This study explains the cost optimization model of IT operation service by improving service request management process, such as adequate reception and control, proper valuation, process management using project management methodology, effective organization and time management of service personnel. Especially in this study, service ability improvement effect and fixed operation cost reduction effect are defined to prove the proposed new cost model.

Probability- based Life Cycle Cost Analysis of Railroad Structures (확률적 방법에 의한 철도시설물의 LCC 분석)

  • Sho Byung-Choon;Choi Young-Min;Cho Sun-Kyu;Shin Kyung-Chul;Jung Jae-Dong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.971-976
    • /
    • 2004
  • The management of railroad structures is more difficult and complicate because there are many structures such as rail, bridge, tunnel, station, and so on. Therefore, LCC(Life Cycle Cost) analysis of railroad structures as public infrastructure must contain a maintenance cost as well as an initial cost in order to make a more effective management during the life cycle on the design phase. This paper presents a cost classification scheme considering user costs such as value of delayed time of passenger and freight. Also, in this study it is developed a probabilistic life cycle cost(PLCC) analysis model of railroad structures taking into account uncertainties and variations of input variables in order to analyze LCC. It may be stated that the model proposed in this study can greatly contribute to the making optimal decision, the estimate of the maintenance cost and the allocate of budget in the project of railroad structures.

  • PDF

Application of Quality Cost Model ln Quality Improvement Area (품질개선분야에서의 품질코스트모델의 적용)

  • Chung, Young-Bae;Kim, Yon-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.71-78
    • /
    • 2011
  • This parer proposes application of quality costing system in quality improvement area. Cost of quality in quality improvement area provides a valuable of both providing the need for improvement and giving a starting point for project. WQCMS(Web-based Q-Cost Management System) have ability to collect and analyze quality data generated from various different departments in the inside or outside of the enterprise without any limitations, if end-users are able to access wide area network. It provides the capability to integrate quality information from database and to generate various easy analysis reports to management's needs using built-in analysis tool modules with real-time. Web-based quality cost management system to measure the performance of quality improvement activities in the business firms. This paper proposes standard model for quality cost process in quality improvement area.