• Title/Summary/Keyword: Project cost

Search Result 2,467, Processing Time 0.035 seconds

A Study On The Cost Estimation Of The Depot Maintenance Elements Development Project (창정비 요소개발 비용산정 방안에 대한 연구)

  • Kim, Jeung-Ki;Choi, Gwang-Mook;Seo, Hyeok
    • Journal of the military operations research society of Korea
    • /
    • v.31 no.2
    • /
    • pp.45-59
    • /
    • 2005
  • As more advanced and complicated equipments are introduced, effective operation and maintenance, along with acquisition of the equipments, commands more significance lately. In order to perform effective depot maintenance, the Republic of Korea Army is continually developing the concept, cycle and method for operating the depot maintenance. Not only the high-cost testing and maintenance equipments but the highly developed maintenance technologies are required for the depot maintenance of the latest weapon system. In order to have the depot maintenance capability, this paper provides the standard and procedure for estimating the development cost of the depot maintenance elements to be utilized in the depot maintenance elements development project.

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

Web-based Daily Report for Data Repository of Standard Cost Data for Modernized Korean Housing (Hanok)

  • Kim, SuJi;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.595-596
    • /
    • 2015
  • Growing demand for traditional Korean housing, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. However, the standard cost data for Hanok has limitations, as it was developed based on single mock-up project actually constructed and verified by another mock-up Hanok. In order to meet these research objectives, daily report composition which is easy-to-use for on-site workers and managers and also easy-to-accumulate standard cost data was developed first. Secondly, access to the system was made easy through a web server. Finally, an automated calculation formula was inserted to allow the last inputted data to be automatically included for adjustment of standard costs. This system was designed from an industry perspective so that any unspecified and nonprofessional users can easily use. For the users, it has an advantage that on-site workers are provided with a daily report system through web server and also they are able to complete such reports through simple input and output without any additional forms.

  • PDF

A Study on the Introduction of the Work Breakdown Structure for Infrastructure Asset Management

  • Jeong, Seongyun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.691-692
    • /
    • 2015
  • Several scholars in South Korea have predicted that maintenance costs of social infrastructure will sharply increase from the mid-2020s, and cause budgetary deficits among facilities management agencies. Interest in infrastructure asset management (IAM) is rising as a solution to such problem. In this study, an information system for asset valuation that reflects the salvage value and deferred cost of social infrastructure based on WBS (work breakdown structure) was developed in consideration of IAM. To reuse the construction cost information such as the acquisition cost, the interconnection between CBS (cost breakdown structure) and WBS was considered. Furthermore, asset valuation information was developed with XML schema to facilitate the exchange and reuse of the information among project participants.

  • PDF

A Possibility for Multilateral CDM Projects in Northeast Asia - The reduction effect in transaction cost by Korean participation - (동북아시아지역의 다국 간 CDM프로젝트에 대한 검토 -한국 참가에 따른 거래비용 삭감효과-)

  • Jung, Woo-Jong;Nakano, Satoshi
    • Journal of Environmental Policy
    • /
    • v.2 no.2
    • /
    • pp.41-63
    • /
    • 2003
  • CDM(Clean Development Mechanism) project is said to be a mechanism, which profits both the investing country and the host country, while additionally contributing to the reduction of greenhouse gases of the earth as a whole. However in reality, most of the proposed projects do not end up in agreement because of the problems related to differences in recognition between the investing country and the host country of the CDM project. This outlines the background for this research which proposes a new design of institutional arrangements of CDM projects in the Northeast Asian region, mainly Japan, China and Korea. In addition, we investigate the feasibility of the proposed design. The research firstly focuses on the reduction in transaction costs that the participation of Korea will have on a Japan-China CDM project. This paper further emphasizes the potential gains that would materialize if a CDM project involved the whole Northeast Asian region, and not only one country. Our research suggests that an approximate reduction of 23% in transaction costs, and about 4% reduction in the total costs of a CDM project can be expected to follow the Korean participation. In addition to decreasing costs we find that a Korean involvement in a CDM project with Japan will lead to efficiency gains illustrated by a higher increase in the IRR(Internal rate of return) in a Japan-Korea project(11.45% to 12.21%) compared to an IRR incresement of 10.57% to 11.27% for a pure Japanese CDM project. Similar results of a rise in the IRR is found for the whole investment period of 20 years. We can hence conclude that Korean participation in a Japan-China CDM project would improve the implementation possibilities of CDM project in the Northeast Asia region.

  • PDF

Economic Effect of the Creation Project of Octopus Ochellatus Spawning and Habitat Ground: the Case of Taean County (주꾸미 산란·서식장 조성사업의 경제적 효과 : 태안군의 사례)

  • Kang, Seok-Kyu
    • The Journal of Fisheries Business Administration
    • /
    • v.49 no.4
    • /
    • pp.109-129
    • /
    • 2018
  • This study is to evaluate economic effect of the creation project of Octopus Ochellatu spawning and habitat ground in Taean County. The main results of this study are summarized as follows: first, the creation project cost of Octopus Ochellatus spawning and habitat ground invested in Taean from 2015 to 2017 was 3,400 million won. Second, The creation project of Octopus Ochellatus spawning and habitat ground directly provides fishing benefits, recreational boat fishing benefits, festival benefits, research and development benefits, and employment benefits. Third, on the basis of above benefits, the creation project of Octopus Ochellatus spawning and habitat ground has a net present value of 14,478 million won, internal rate of return 60.8%, and benefit-cost of 5.03 under a 4.5% social discount rate. Also, the creation project creates 47 jobs. This indicates that the creation project of Octopus Ochellatus spawning and habitat ground contributes not only to the increase in the income of coastal fishery, recreational boat fishing business and fishing villages but also to the job making. In conclusion, with all these results, a project for making spawning grounds and habitats in the specified region gives species more numerically abundant and this gives more profits to fishermen in the coastal area. In addition, this project helps to make attractions to visitors or people who came to those specified regions to participate in events or have recreation, which means it improves profits to that fishing village and improve a settlement condition.

A Market-Based Replacement Cost Approach to Technology Valuation (기술가치평가를 위한 시장대체원가 접근법)

  • Kang, Pilsung;Geum, Youngjung;Park, Hyun-Woo;Kim, Sang-Gook;Sung, Tae-Eung;Lee, Hakyeon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.2
    • /
    • pp.150-161
    • /
    • 2015
  • This paper proposes a new approach to technology valuation, the market-replacement cost approach which integrates the cost-based approach and market-based approach. The proposed approach estimates the market-replacement cost of a target technology using R&D costs of similar R&D projects previously conducted. Similar R&D projects are extracted from project database based on document similarity between project proposals and technology description of the target technology. R&D costs of similar R&D projects are adjusted by mirroring the rate of technological obsolescence and inflation. Market-replacement cost of the technology is then derived by calculating the weighted average of adjusted costs and similarity values of similar R&D projects. A case of "Prevention method and system for the diffusion of mobile malicious code" is presented to illustrate the proposed approach.

A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction - (정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 -)

  • Lee, Myoung-Hoon;Ham, Nam-Hyuk;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.

TRL Impact on Development Schedule and Cost in the Aerospace Project (항공우주개발 프로젝트에서 개발기간과 비용에 대한 TRL의 영향 분석)

  • Hwang, Hyung-Won;Kim, Hong-Rae;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.3
    • /
    • pp.264-272
    • /
    • 2012
  • TRL has a direct impact on development schedule and cost in the system or technology development projects. If TRL capability of development organization for specified CTEs can be accurately assessed and the impact of TRL on development schedule and cost are analyzed as detailed as possible, the risk of development schedule delay and cost increase can be minimized during the development process. This paper describes analysis results of TRL impact on development schedule and cost in the aerospace project. The development schedule and cost change are quantitatively estimated for the TRL improvement in the Unmanned Aerial Vehicle(UAV) system development program.

A Conceptual Investment Cost Estimation Using by Cost Indices for the Train Control Facility of High-speed Rail Project (원가지수를 이용한 고속철도 설비의 개략적 투자비 추정기법)

  • Lee, Young-Joo;Lee, Yong-Eok;Jang, Seong-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.2
    • /
    • pp.194-202
    • /
    • 2011
  • Most of Orders of Magnitude estimate are based on historical data. This data is converted to the current price using by the cost index method mainly. This method, however, is rarely utilized or only for one-time use due to the lack of data and the complex escalation calculation method. This paper present a typical process on the conceptual investment cost estimation using by Cost Indexes based on the actual case for the Train Control facility of High-speed rail project. The result is expected to serve as both an easy way for Order of Magnitude estimate and a standard guideline for computerized modeling.