Utilizing the heat of cooling water discharge of coal-fired power plant, pipeline investment costs for businesses that supply heat to agricultural facilities near power plants increase in proportion to installation distance. On one hand, the distance from the power plant is a factor that brings difficulties to secure economic efficiency. On the other, if the installation distance is short, there is a problem of securing the heating demands, facility houses, which causes economical efficiency to suffer. In this study, the economic efficiency of 1km length of standard heat pipeline was evaluated. The sensitivity of the heat pipe to the new length variation was analyzed at the level of government subsidy, amount of heating demand and the incremental rate of pipeline with additional government subsidy. As a result of the analysis, it was estimated that NPV 131 million won and IRR 15.73%. The sensitivity analysis showed that NPV was negative when the length of heat pipe facility exceeded 2.6 km. If the government supports 50% of the initial investment, the efficiency is secured within the estimated length of 5.3 km, and if it supports 80%, the length increases within 11.4 km. If the heat demand is reduced to less than 62% at the new length of the standard heat pipe, it is expected economic efficiency is not obtained. If the ratio of government subsidies to initial investment increases, the elasticity of the new bloc will increase, and the fixed investment, which is the cost of capital investment for one unit of heating demand, will decrease. This would result in a reduction in the cost of production per unit, and it would be possible to supply heat at a cheaper price level to the facility farming. Government subsidies will result in the increased economic availability of hot plumbing facilities and additional efficiencies due to increased demand. The greater government subsidies to initial investment, the less farms cost due to the decrease in the price per unit. The results of the study are significant in terms of the economic evaluation of the effectiveness of the government subsidy for the thermal power plant heat utilization project. The implication can be applied to any related pilot to come.
This study was carried out to examine how solid the production foundation of rice in Chung-Nam Province is, and, if not, to probe alternative measures through the size of farms specializing in rice, of which direction would be a pivot of rice industry-oriented policy. The results obtained can be summarized as follows : 1. The amount of rice production in Chung-Nam Province is highest in Korea and the size of paddy field area is the second largest : This implying that the probability that rice production in Chung-Nam Province would be severely influenced by a global trend of market conditions. The number of farms specializing in rice becoming the core group of rice farming account for 7.7 percent of the total number of farm household in Korea. Average field area financial support which had been input to farm household by Government had a noticeable effect on the improvement of the policy of farm-size program. 2. Farm-size program in Chung-Nam Province established from 1980 to 2002 in creased the cultivation size of paddy field to 19,484 hectares, and this program enhanced the buying and selling of farmland and the number of farmland bargain reached 6,431 household and 16,517 hectares, respectively, in 1995-2002. Meanwhile, long-term letting and hiring of farmland appeared so active that the bargain acreage reached 6,970 hectares, and farm involved was 7,059 households, however, the farm-exchange-and-unity program did not satisfy our expectation, because the retirement farm operators reluctantly participated to sell their farms. Another reason that had delayed the bargain of farms rested on the general category of social complication attendant upon the exchange and unity operation for scattered farm. Such difficulties would work negative effects out to carry on the target of farm-size work in general. 3. The following measures were presented to propel the farm-size promotion program : a. Occupation shift project, followed by the social security program for retirement and elderly farm operators, should be promptly established and also a number of types of incentives for promoting the letting and hiring work and farm-exchange-and-unity program would also be set up. b. To establish the effective key system of rice production, all the farm operators should increase the unit area yield of rice and lower the production cost. To do so, a great deal of production teams of rice equipped with managerial techniques and capabilities need to be organized. And, also, there should be appropriate arrays of facilities including information system. This plan is desirable to be in line with a diversity of the structural implement of regional integration based on farm system building. c. To extend the size of farm and to improve farm management, we have to devise the enlargement of individual size of farm for maximized management and the utilization of farm-size grouping method. In conclusion, it can be said that the farm-size project in Chung-Nam Province which has continued since the 1980s was satisfactorily achieved. However, we still have a lot of problems to be solved to break down the barrier for attainment of the desirable farm-size operation work.. Farm-size project has fairly close relation with farm specialization in rice and, thus, the positive support for farm household including the integrated program for both retirement farmers and off-farm operators should be considered to pursue the progressive development of the farm-size program, which is key means to successful achievement of rice farming enforcement in Chung-Nam Province.
The tropical peatlands have been deforested and converted to agricultural and plantation areas in Indonesia. To manage water levels and increase the overall productivity of crops, canals have been constructed in tropical peatlands. The canals destructed the structure of the tropical peatlands, and increased the subsidence and fire hazard risks in the region. The Indonesian government enacted regulations and a moratorium on tropical peatlands, in order to reduce degradation. A practical method under the regulations of rewetting tropical peatlands was to permit a canal blocking. In this study, four canal blocking projects were investigated regarding their planning, construction priority, design, building material, construction, monitoring, time and costs associated with the canal blockings. In the protected areas, regulations restricted the development of the tropical peatlands areas that were noted as deeper than 3 m, and the administration stopped issuing new concessions for future work projects for this noted criteria of land use. A noted purpose of canal blockings in these areas was to effectuate the restoration of the lands in the region. The main considerations of the restoration efforts were to maintain a durability of the blockings, and to encourage the participation of the area stakeholders. In the case of a concession area, regulations were set into place to restrict clear-cutting and shifting cultivation, and to maintain groundwater level in the tropical peatland. The most significant priorities identified in the canal blocking project were the efficiency and cost-effectiveness of the project. Nevertheless, the drainage of tropical peatlands has been continued. On the basis of a literature review on regulations and rewetting methods in tropical peatlands of Indonesia, we discussed the improvements of the regulations, and adequate canal blockings to serve the function to rewet the tropical peatlands in Indonesia. Our results would help establishing an adequate direction and recommended guideline on viable rewetting methods for the restoration of drained tropical peatlands in Southeast Asia.
This study was carried out to the actual conditions and improvement of the eco-forests master plan in South Korea, and suggested its problems and improvement direction. Results from survey and analysis of limiting factors or constraints in the construction plans of eco-forests in Korea revealed that there were highly frequent problems involving site feasibility, topographic aspect, and existing vegetation. The results of survey on the status of land use indicated that the average ratio of the use of private estate was 29.7%, so then it was estimated that a great amount of investment in purchase of eco-forest site would be required. Results from survey on major introduced facilities showed that there was high frequency of introduction of infrastructure, building facility, recreational facility, convenience facility, and information facility, and that there was low frequency of introduction of plant culture system, ecological facility, structural symbol and sculpture, and the likes. There was just one eco-forest park where more than 500 species of plants grew, and the result of investigation indicated that the diversity of plant species in 11 eco-forest parks was lower than the standards for construction of eco-forest. Results from analysis of the projects costs revealed that investment cost in facilities was higher than planting costs, and that a large amount of investment was made in the initial stage of the project. There was no planned budget for the purpose of cultivating and maintaining the plants and vegetation after construction of eco-forest. The basic concepts in construction of eco-forests were established according to the guidelines presented by the Korea Forest Service; however, the detailed work of the project was planned with its user-oriented approach. Then the construction of eco-forest was being planned following the directions, which would lead to development of a plant garden similar to arboretum or botanical garden. Therefore, it is required that the architect who designs eco-forest as well as the public officer concerned firmly establish the concepts of eco-forest, and that, through close analysis of development conditions, a candidate site to fit the purpose of constructing eco-forest be selected, and also a substantive management plan be established upon completion of construction of eco-forest.
This study is going to contribute the activation of ecosystem services written in the 3rd National Basic Plan for Nature Conservation(2016~2025) in Korea. Meanwhile we considered the benefits that the nature has given to the humankind as free goods or services which we may consume traditionally without due payment therefore. But on account of the expansion of cities and expedition of development, as the carrying capacity of the nature has been breached, people have come to try to restore and enhance artificially such vulnerable capacity. It is necessary to compensate the opportunity cost which the land owners or occupiers have to pay for conservation and maintenance of natural capitals which yield the ecosystem services. Therefore the institutionalization of ecosystem services should be established that the consumers who enjoy such services should share the interest from enjoying services with the land owners or occupiers who produce the ecosystem services, under the legal system which will make it possible to connect the benefit sharing with the conservation of environment. However it is the first task that the present legal system could not realize the fair and equitable benefit sharing between the producers and consumers of ecosystem services. And the second task in such legal system is that the value of ecosystem services could not be fully considered in the process of development planning. According to the analysis of this study, the institutionalization of ecosystem services in the government side and the civilian side could be realized to somewhat extent, although not sufficient. Especially the transactions of ecosystem services through the private contract among stakeholder are possible in the course of development planning or without any relevancy to a development project. The final task in the institutionalization of ecosystem services is how to assess the ecosystem services and to value the economic benefits therefrom on the basis of what kinds of procedures relating to some development processes. To overcome such difficulties, it is necessary that the state, trend and change of ecosystem services confronting with a developing project should be assessed concretely at the threshold of development. It is possible to integrate the ecosystem services into the environmental impact assessment(IEA), not by way of the Act of IEA, but by way of the Decree thereof.
In the estuary where the structure such as river-mouth weir has been installed, the flow is developed very complicatedly due to river water from upstream, tide of the sea and floodgate operation. Especially, if basin outlets more than one exists in one estuary, the boundary conditions will be significantly more complex form. Saemangeum(SMG) project area in Korea is the most typical example. There are Mankyung river and Dongjin river in upstream. The water of them inflows into SMG project area. In the downstream, river flow was drained from inland to sea over the SMG sea dike through the sluice. The connecting channel was located between Mankyung and Dongjin basins. It functions not only as transportation by ship in ordinary period but also as flood sharing by sending flood flow to each other in flood period. Therefore, in order to secure the safety against flood, it is very important to understand the flood sharing capacity for connecting channel. In this study, the flood control effect was analyzed using numerical simulation. Delft3D was used to numerical simulation and simulated period was set up with neap tide, in which the maximum flood stage occurred due to poor drainage. Actually, three connecting channels were designed in land use plan of the SMG Master Plan, but they were simplified to a single channel for conciseness of analysis in this study. According to the results of numerical analysis, the water level difference between two basins was increased and the maximum flood stage at dike sluice was also upraised depending on decrease of conveyance. And the velocity induced by same water level difference was decreased when the conveyance became smaller. In certain conveyance above, there was almost no flood control effect. Therefore, if the results of this study are considered for design of connecting channel, it will be expected to draw the optimal conveyance for minimizing dredging construction cost while maximizing the flood control effect.
Transportation project appraisal should be precise in order to increase the social welfare and efficiency, and it has been evaluated by only a single criterion analysis such as benefit/cost analysis. However, this method cannot assess some qualitative items, and cannot get a proper solution for the clash of interests among various groups. Therefore, the multi-criteria analysis, which can control these problems, is needed, and then Saaty has developed one of these methods, AHP(Analytic Hierarchy Process) method. In AHP, the project is evaluated through weighted score of the criteria and the alternatives, which is surveyed by a questionnaire of specialists. It is based on some strict suppositions such as reciprocal comparison, homogeneity, expectation, independence relationship between multi-criteria, but supposing that each criterion has independence relation with others is too difficult in two reasons. First, in real situation, there cannot be perfect independence relationship between standards. Second, individuals, even though they are specialists of that area, do not feel the degree of independence relation as same as others. This paper develops a modified AHP method for solving this dependence relationship between multi-criteria. First of all. in this method, the degree of dependence relationship between multi-criteria that the specialist feels is surveyed and included to the weighted score of multi-criteria This study supposes three methods to implement this idea. The first model products the degree of dependence relationship in the first step for calculating the weighted score, and the others adjust the result of weighted score from the basic AHP method to the dependence relationship. One of the second methods distributes the cross weighted score to each standard by constant ratio, and the other splits them using Fuzzy measure such as Bel and Pl. Finally, in order to validate these methods, this paper applies them to evaluate the alternatives which can control public resentments against Korean rail path in a city area.
Three Inter-Korea summits and a North Korea-USA summit that were previously unexpected provide a basis for an optimistic outlook for the future development of Korean archaeology. While Korean archaeology has witnessed a great advance since the mid-20th century, it also exhibits significant weaknesses in explaining cultural changes in prehistory and the early historical period in the Korean Peninsula due to the paucity of information on archaeological evidence of North Korea. Recent development of favorable conditions for research and excavations of North Korean cultural heritage could be a valuable opportunity for Korean archaeology to overcome the current adversity. Especially, given the expected large-scale SOC industrial project in North Korea, we need to prepare for the systematic research and excavation of archaeological materials. The present essay attempts to provide a suggestion for the joint archaeological expeditions to excavate and manage cultural resources in North Korea based on a critical review of previous salvage excavations in South Korea, such as those conducted before the construction of the Korean rapid transit railway system (KTX). We suggest that professional archaeologists should be included in the project and oversee the planning and design of road and railway constructions and other SOC projects in order to minimize the cost of trial and error processes that were well exemplified by the KTX salvage excavations. The Korean Archaeological Society and North Korean Archaeological Society may organize a common association that will supervise joint archaeological expeditions. Importantly, The Korean Archaeological Society and other related institutions should prepare to build an organization that conducts impending archaeological excavation in North Korea. While we likely face challenges and difficulties during the various stages of archaeological research and excavations in North Korea, only through thorough and systematic preparation can we avoid the destruction of valuable cultural heritage and find an opportunity for the further development of Korean archaeology.
Park, Jae Hong;Ryu, Jichul;Shin, Dong Seok;Lee, Jae Kwan
Journal of Wetlands Research
/
v.21
no.2
/
pp.140-146
/
2019
In order to manage non-point sources, the paradigm of the system should be changed so that the management of non-point sources will be systematized from the beginning of the use and development of the land. It is necessary to change the method of national subsidy support and poeration plan for the non-point source management area. In order to increase the effectiveness of the non-point source reduction project, it is necessary to provide a minimum support ratio and to provide additional support according to the performance of the local government. A new system should be established to evaluate the performance of non-point source reduction projects and to monitor the operational effectiveness. It is necessary to establish the related rules that can lead the local government to take responsible administration so that the local governments faithfully carry out the non-point source reduction project and achieve the planned achievement and become the sustainable maintenance. Alternative solutions are needed, such as problems with the use of $100{\mu}m$ filter in automatic sampling and analysis, timely acquisition of water sampling and analysis during rainfall, and effective management of non-point sources network operation management. As an alternative, it is necessary to consider improving the performance of sampling and analysis equipment, and operate the base station. In addition, countermeasures are needed if the amount of pollutant reduction according to the non-point source reduction facility promoted by the national subsidy is required to be used as the development load of the TMDLs. As an alternative, it is possible to consider supporting incentive type of part of the maintenance cost of the non-point source reduction facility depending on the amount of pollutants reduction.
The Development Assistance Committee of the Organization for Economic Cooperation and Development discusses the reorganization of the five evaluation criteria of the Public Development Assistance Committee, which are used internationally, and the five evaluation criteria including adequacy, efficiency, effectiveness, impact, and sustainability when assessing public development assistance in 1991. This study is to derive alternatives by applying the evaluation criteria of the Development Assistance Committee of the Organization for Economic Cooperation and Development in the evaluation of the inclusive business program being implemented in Nepal since 2019. As a result of the study, the adequacy of Nepal's inclusive business program was consistent with continuous employment and job creation for vulnerable groups such as disabled and orphan women. Efficiency can be said to be efficient in that processes such as work order and work confirmation are made with an electronic management tool, and delivery of the result is transmitted online, saving time and cost compared to other industries. The effectiveness of this project can be said to be an effective program in that it provides high-quality jobs such as providing specialized computer graphics education for the vulnerable, such as disabled and orphan women in Nepal, and hiring graduates as employees. Sustainability is the point that KOICA's inclusive business program has enabled vulnerable groups in the existing fields of agriculture and manufacturing to engage in the computer graphics industry, and the scalability of movies, characters, education businesses, and role models in other countries.However, considering that the scale of public development assistance will continue to increase in the future, it is necessary to establish a systematic monitoring system and a recirculation system so that the project between the donor and recipient countries can continue.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.