Risk Analysis on Offshore Windfarm Industry in South Korea: Based on the Jeonnam Offshore Windfarm Project

  • Kim, Tae Hyun;Kim, Yea-Sang;Chin, Sangyoon;Pallesen, Kristian
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.204-212
    • /
    • 2022
  • Recently, the Korean government has been actively promoting the smart city as their strategic agenda. However, to build smart cities that are greener, the authors believe it is essential to rapidly transit conventional energy sources such as fossil fuels to renewable energy. Although there is a big potential for Offshore wind in Korea, there has not been a full-scale commercial offshore wind farm until today. Since Korea is relatively a new market compared to the EU, it can be risky for developers. The authors will introduce risk management best practices in the offshore wind industry applicable to the Korean environment. This paper will mainly introduce an offshore wind project size of 99 MW. The project is expecting a Finance Close (FC) in Q3 2022, so the project team has prepared a risk register with over 150 risks and levers throughout the project lifecycle. Overall risks include risks with Development Expenditure (DEVEX) impact, a Capital Expenditure (CAPEX) impact, and an Operating Expenditure (OPEX) impact. Based on the identified risks, a more qualitative assessment of Cost and Schedule Impact was conducted. In conclusion, a Monte Carlo simulation was performed to propose a quantitative risk assessment to evaluate a benchmark contingency of the project cost.

  • PDF

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

Changes in the Economic Feasibility of a Floating Photovoltaics Project due to the Social Cost of Carbon (탄소의 사회적 비용에 따른 수상 태양광 사업의 경제성 변화)

  • Jaejune Lim;Jinsoo Kim
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.26-37
    • /
    • 2024
  • Renewable energy sources play a key role in achieving carbon neutrality and zero net emissions in the power generation sector. Various efforts have been made to support the deployment of renewable energy, particularly solar photovoltaic and wind power, including policies to internalize the external cost of carbon emissions. In this study, we conducted a financial analysis of a 800 MW floating photovoltaic system and compared it with ground solar power generation. Additionally, we conducted a cost-benefit analysis that included the social cost of carbon. The findings showed that the floating photovoltaic project can meet the profitability target through an appropriately designed internalization of the social cost of carbon.

Analysis of Socio-economic Effects of Land Consolidation and On-farm Development Project (경지정리사업(耕地整理事業)의 사회경제적효과분석(社會經濟的效果分析))

  • Lim, Jae Hwan;Kim, Jae Hong;Yeo, Soon Duck
    • Korean Journal of Agricultural Science
    • /
    • v.27 no.2
    • /
    • pp.158-175
    • /
    • 2000
  • Up to date, the economic feasibility analysis on land consolidation and on-farm development projects were mainly depended upon the direct benefits from market value of project outputs. Therefore the projects were neglected in allocation of the government's financial funds and loans on account of undervaluation of the project benefits including socio-economic and environmental values of the projects. Accordingly the Extended Benefit Cost Analysis Method should be adapted to cover not only the benefits such as non-market values of environmental functions of the projects and but also the economic market values of the project outputs. The main objectives of this study is (1) to provision of the guideline for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits such as Productivity increase effect, labor saving effect, off-farm income increase effect during off-farm season, saving of O&M cost of farm mechanization, enhance of farmer's public health, increase of environmental public function of paddy fields, effect of food security and establishment of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible the analysis of non-market goods such as the food security value and the environmental public value of paddy fields. To carry out the study, the publication on the guideline for economic analysis of agricultural projects were reviewed and consulted and for the post evaluation of the land consolidation and on-farm development project, field survey in Jeongja area were made for the feasibility study of the project by new method. According to the initial project plan, Jeongja land consolidation and on-farm development project has 96ha of benefit area and the project was started in 1989 and completed in the spring, 1990. The total project costs were amounted to 1,052 million won and the annual project benefits were estimated at 135.4 million in 1989 constant market prices. On the other hand, the newly estimated project benefits as a part of post evaluation of the project were amounted to 602.1 million won including all the benefits from the market and non-market commodities of the project as mentioned above column. The original IRP(Internal rate of return) of the project was estimated at 15.81%. On the other hand, the IRR of the post evaluation of the project was amounted to 16.83%. In case of including the benefit from the environment public function of paddy field, the SRR(Social Rate of Return) was reached to 38.81% and when we added the benefit from food security of the project, the SRR showed very high rate as 46.41%. In conclusion, the project were verified socio-economically feasible and environmentally sustainable considering the above decision making criteria.

  • PDF

Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction (전력구 설치 공사의 안전관리비 계상 기준에 관한 연구 )

  • Min Ho, Kim;Sung Woo, Shin
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.50-59
    • /
    • 2022
  • In the Construction Technology Promotion Act (CTPA) of the Republic of Korea, safety management cost is enforced as a statutory cost that must be included in the budget of construction projects. However, the construction of underground electric power transmission facilities (UEPTFs) is not included in the category of construction works defined in the CTPA. Consequently, the statutory safety management cost does not apply to the construction of UEPTFs. To overcome this limitation, the clients of UEPTF construction projects generally provide internal guidelines enabling the addition of the safety management cost in the project budget. Nevertheless, even after the execution of the internal guidelines, some important cost items are omitted from the budget owing to the incompleteness of the guidelines. In this context, this paper proposes a complete set of accounting items and their calculation methods for appropriate budgeting of the safety management cost of UEPTF construction projects. To this end, the current budgeting method of the safety management cost of UEPTF construction projects is analyzed, and a questionnaire study is performed to confirm the necessary cost items and their appropriate calculation methods. Based on the results of the questionnaire study, a set of accounting items and their calculation criteria for the budgeting of the safety management cost of UEPTF construction projects are proposed.

Cost-Benefit Analysis of the Farmer's Health Center Project (FHCP) in Rural Korea (농업인건강관리실 사업의 비용편익 분석)

  • Hwang, Dae-Yong;Kang, Kyeong-Ha;Lee, Soon-Sung;Ko, Jeong-Sook;Oh, Seung-Young
    • Journal of Agricultural Extension & Community Development
    • /
    • v.13 no.2
    • /
    • pp.313-327
    • /
    • 2006
  • This study aims to examine the operating status of the Farmer's Health Center Project and the validity of its business using the benefit-cost analysis. As the pilot project of the Rural Development Adminstration from 1996, a total of 884 Farmer's Health Centers were established until 2004. Internal information of the RDA management unit was used for the analysis. A questionnaire with an interview was also performed with 70 over 468 Centers that had been established from 2001 to 2004. Results were as follows. 1) The Center was mainly used by elderly over 60 years, which took 71.4%. Winter was the most popular season for visiting. 2) Approximately 71% of the manager of the Center pointed out the deficiency of fuel cost as the most difficulty in operating the Center. 3) Users were moderately satisfied with facility and the effect of its use, which took 3.5 point over 5 scale. 4) For the cost-benefit analysis on the Centers, both 5% of social discount rate and 15 years of use term were assumed. Subsequently, the Net Present Value was 3,134 million won, which certified the validity of the business.

  • PDF

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

A Study on the Effects of ICT Infrastructure Cost on Information System Life Cycle (정보시스템 수명주기에 인프라가 미치는 영향관계에 대한 연구)

  • Moon, Heoungkeun;Kim, Jeongho;Lee, Seogjun;Park, Sungsik
    • Journal of Information Technology and Architecture
    • /
    • v.10 no.3
    • /
    • pp.323-334
    • /
    • 2013
  • There are many studies on the project planning, project management and quality management. The cost of the new project takes only 20% of system's lifetime resource and the costs of the maintenance and infrastructure take more than 80%, so the study on the maintenance is much more important than the study on the new project. There has been many studies on the economic life cycle of the system using it's maintenance cost, but no studies on it's infrastructure cost. This paper provides how we can adapt infrastructure cost, which takes more than 40% of system's life cycle cost, to the economic life cycle of the system and its effects on the system's economic life cycle.