The Problem of the Quality of the Predecessor Activity on the Time and Cost of the Successor Activity in the Project Schedule - Project Schedule with Resource Constraints - (프로젝트 일정에서 선행활동 품질이 후행활동의 시간과 비용에 미치는 문제 - 자원제약이 존재하는 프로젝트 일정문제 -)

  • Kim, Gab Sik;Bae, Byeong Man;Ahn, Tae Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.2
    • /
    • pp.265-286
    • /
    • 2022
  • Purpose: The time and cost of a project activity exists in a selected mode and there is a quality level for the selected mode, and the time and cost of the current activity is determined by the quality level of the preceding activity. When an activity is a predecessor activity of an activity, it is characterized as a trade-off problem in which the time and cost of the activity are determined according to the quality level of the activity. Methods: A neighbor search heuristic algorithm obtains a solution by (1) randomly determining the mode, quality level, and assignment order for each activity. (2) get a solution by improving the solution by changing the possible modes and quality levels; (3) to find a solution by improving the solution from the point where it is feasible to advance the start time. Here, Case[1] is a method to find the optimal solution value after repeating (1). Case [2] is a method for finding a solution including (1) and (2). Case [3] refers to a method for finding solutions including (1), (2), and (3). Results: It can be seen that the value of the objective function presented by the algorithm changes depending on how the model of the heuristic algorithm is designed and applied. In other words, it suggests the importance of algorithm design and proves the importance of the quality problem of activities in the project schedule. Conclusion: A study significance of the optimization algorithm and the heuristic algorithm was applied to the effect of the quality of the preceding activity on the duration and cost of itself and the succeeding activity, which was not addressed in the project schedule problem.

FUZZY GOAL PROGRAMMING FOR CRASHING ACTIVITIES IN CONSTRUCTION INDUSTRY

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.642-652
    • /
    • 2007
  • Many contracting firms and project managers in the construction industry have started to utilize multi objective optimization methods to handle multiple conflicting goals for completing the project within the stipulated time and budget with required quality and safety. These optimization methods have increased the pressure on decision makers to search for an optimal resources utilization plan that optimizes simultaneously the total project cost, completion time, and crashing cost by considering indirect cost, contractual penalty cost etc., practically charging them in terms of direct cost of the project which is fuzzy in nature. This paper presents a multiple fuzzy goal programming model (MFGP) that supports decision makers in performing the challenging task. The model incorporates the fuzziness which stems from the imprecise aspiration levels attained by the decision maker to these objectives that are quantified through fuzzy linear membership function. The membership values of these objectives are then maximized which forms the fuzzy decision. The problem is solved using LINGO 8 optimization solver and the best compromise solution is identified. Comparison between solutions of MFGP, fuzzy multi objective linear programming (FMOLP) and multiple goal programming (MGP) are also presented. Additionally, an interactive decision making process is developed to enable the decision maker to interact with the system in modifying the fuzzy data and model parameters until a satisfactory solution is obtained. A case study is considered to demonstrate the feasibility of the proposed model for optimization of project network parameters in the construction industry.

  • PDF

Evaluation of the Effect of Project Delay on Future Benefits in the Nepal Highway Infrastructure Construction Sector

  • Chhabi Lal PAUDEL;Michael HENRY
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.137-144
    • /
    • 2024
  • Public infrastructure projects are implemented to achieve targeted economic development of nations. However, due to the delayed execution of projects, the investment cost of the project increases in proportion to time overrun. The increased investment cost for the defined scope of project may have an effect on the achievement of planned future benefits, but the effect of delay on the loss of estimated benefits is not well explored. The primary objective of this research is to assess the effect of delayed execution of road and bridge construction projects on the estimated future benefits. Furthermore, the relationship between delay and the percentage loss of future benefits is modeled using the linear regression analysis. The data consists of 395 road and 248 bridge construction contracts under the Department of Roads, Nepal. The statistical analysis of road and bridge construction contracts showed that there is a reduction in estimated benefits in future years due to the effect of delay. The relationship between the percentage loss of estimated benefit and delay period in months was found to be significant for both road and bridge contracts. The results show that delay not only affects the short-term cost overrun but also the achievement of estimated future benefits. This research thus contributes valuable insights into the understanding of the impact of project delays on both cost overruns and the loss of estimated future benefits. Furthermore, this research has practical implications for policymakers, private sector investors, and financing agencies involved in infrastructure development projects.

Economic Evaluation of Eastern, Western and Collaborative Treatments for Patients with Frozen Shoulder Pain (견비통의 한${\cdot}$양방 진료 및 협진의 경제성 평가)

  • Jang, Hye-Jung;Hong, Sang-Min;Park, You-Seon;Nam, Dong-Woo;Lim, Doo-Ik;Lee, Jae-Dong;Lee, Yun-Ho;Lim, Sabina
    • The Journal of Korean Medicine
    • /
    • v.28 no.1 s.69
    • /
    • pp.72-86
    • /
    • 2007
  • Objectives : The purpose of this study was to evaluate and compare the cost-effectiveness of Eastern, Western, and collaborative treatments and suggest a cost-effective approach for patients with frozen shoulder pain. Methods : Using the data of fifty-two patients, treatment effectiveness was measured by CSA, SPABI, and ROM scales and changes from the baseline score were evaluated. Data source for cost estimation was based on the national health insurance (NHI) payment system. Because the price in NHI was differentiated by health care institutions, five collaborative types were considered in assessing costs. Cost-effective ratios were computed for economic evaluation. Results : Compared with Eastern treatment, collaborative and Western treatments showed better effects on CSA scale after 4 weeks' treatment. The collaborative approach was also the most effective treatment on SPADI and ROM scales. The direct cost per patient receiving Eastern treatment was less than other treatments. In general, collaborative treatment dominated Eastern and Western treatments in cost-effectiveness an analysis. However, the cost-effectiveness ratio of Eastern treatment resulted in \9,000 compared to \29,000 of collaborative treatment on SPADI. Four different indicators of ROM scales resulted in different approaches as the cost-effective treatment. Conclusions : Considering cost-effectiveness ratios, collaborative treatment was the best treatment on CSh and SPADI scales after 4 weeks' treatment. As for ROM scales, the recommended alternatives were Eastern treatment for patients with abduction and adduction disabilities, Western treatment for those with flexion disability, and collaborative approach fir those with extension disabiliry.

  • PDF

Assessment of Appropriate Period and Cost(P&C) of Repair and Improvement for Irrigational Structures (논문 - 수리시설물의 적정개보수 주기 및 비용 산정)

  • Lee, Joon-Gu;Kim, Myong-Won;Shin, Tae-Ho
    • KCID journal
    • /
    • v.18 no.2
    • /
    • pp.142-160
    • /
    • 2011
  • This study was performed to apply the preventive management technique that is known for more economic and preventive for disaster than corrective technique to Repair & Improvement(R&I) Project policy of irrigational facilities. The appropriate periods of R&I Project had been driven to 40yrs, 24yrs, 27yrs, and 29yrs for reservoir, Pumping and drainage pumping station, Diversion weir and Irrigation & drainage canal respectively. The cost of R&I Project for 10 years had been estimated as 616.9 billion won per year including the 85 billion won for the project of 'Disaster prevention and Function continuity'. After the period of 'Improvement all at once', about 30yrs, 421.8 billion won was requested for 'Function continuity'.

  • PDF

Knowledge-Based Model for Forecasting Percentage Progress Costs

  • Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.5
    • /
    • pp.518-527
    • /
    • 2012
  • This study uses a hybrid estimation tool for effective cost data management of building projects, and develops a realistic cost estimation model. The method makes use of newly available information as the project progresses, and project cost and percentage progress are analyzed and used as inputs for the developed system. For model development, case-based reasoning (CBR) is proposed, as it enables complex nonlinear mapping. This study also investigates analytic hierarchy process (AHP) for weight generation and applies them to a real project case. Real case studies are used to demonstrate and validate the benefits of the proposed approach. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs.

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

Assessment of Project Cost Reduction Potential Adopting Cases-Synthetic Approach - Focused on the Apartment Building Construction Project - (시공방법 개선사례 조합에 의한 원가절감 가능성 평가)

  • Choi, Jong-Soo;Choi, Young-Jun;Chae, Seong-Tae;Yoo, Sung-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.135-144
    • /
    • 2009
  • The primary focus of this study has been directed towards assessing the potential impact of construction method improvement on a reduction in project cost. A total of 90 actual application cases were collected from a public organization and private construction firms, and 32 cases were used in analysis by adopting a synthetic approach. The level of cost reduction was measured in terms of material and labor cost by comparing the existing method and the improved method. An analysis of the results indicates that project cost can be reduced by up to 5.26 percent compared to a normal project by adopting a synthetic approach. Additional benefits include the assurance of uniform quality, savings in terms of labor and/or materials, and improved productivity. The potential of the applicability of this approach to other types of buildings and the implications of research findings were discussed in detail.

Cost-Benefit Analysis of Maternal and Child Health Program - Focusing on Lao People's Democratic Republic - (모자보건 증진사업에 대한 비용편익 분석 - 라오스 국가를 중심으로 -)

  • Lee, Myung-Sun
    • The Journal of Korean Society for School & Community Health Education
    • /
    • v.15 no.2
    • /
    • pp.115-125
    • /
    • 2014
  • Objectives: The purpose of this analysis was to assess the maternal and child health program in Lao PDR, which was implemented to reduce maternal and child mortality in Laos. Target areas for the project included 2 provinces (Xiengkhuang, Houaphan) with all 18 districts within them. The beneficiaries of this project included 121,000 childbearing women and 62,000 children under 5 years old (LSIS, 2012). Methods: In this study, it was done for efficiency evaluation of the assistance projects of the health sector of maternal and child health promotion program in Laos that took place from 2010 to 2013. We conducted a cost-benefit analysis for the evaluation of the effectiveness of that program was being carried out effectively. Results: This evaluation adopted the Cost-Benefit analysis approach. Key findings of the Cost-Benefit analysis are the following: The Benefit-Cost Ratio of 1.012, Net Present Value of 84,250,000 Korean Won, an estimated Internal Rate of Return of 10.12%. These findings suggest that project activities were efficiently implemented. Conclusion: As a result, maternal and child health project in Laos has been analyzed that there was economic efficiency. Therefore, It is considered necessary and continued support expansion of program in the future. The direction of maternal and child health project in Laos, approach and community policy support must be included. Integrated approach between the program approach and overall health should be performed for healthy life habit.

  • PDF