• Title/Summary/Keyword: Project benefits

Search Result 536, Processing Time 0.027 seconds

Benefits of Early Stakeholder Involvement in Korean Railway Infrastructure Project

  • KANG, SungWook;KIM, DongHee;YU, JaeKyun;LEE, KyungChul;MOON, DaeSup
    • The Journal of Economics, Marketing and Management
    • /
    • v.9 no.5
    • /
    • pp.15-25
    • /
    • 2021
  • Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.

Sharing Innovation's Benefits

  • Oh, Deog-Seong;Phillips, Fred
    • World Technopolis Review
    • /
    • v.4 no.3
    • /
    • pp.126-131
    • /
    • 2015
  • WTR articles to date have addressed raising innovation capacity in lagging regions. We now move to the question of sharing the benefits of specific innovations, noting that one way to do this is to focus on a particular technology as a demonstration project within a capacity-building project. The word "sharing" implies mechanisms that go beyond simple buy-sell transactions. This paper catalogs a number of these mechanisms, which in fact include many well-known technology transfer techniques. The paper focuses in particular on two mechanisms, technology assessment and new institutions, the latter including three Korean institutions. A manager seeking to benefit from the several mechanisms currently must find them in as many different places. We therefore present the possible "roll-up" of sharing mechanisms as an opportunity in social entrepreneurship. We hope the paper will lead to an expanded list of sharing mechanisms, consideration of their feasibility in different regions, and ultimately a one-stop shop for managers seeking to benefit their own and other organizations by the sharing of innovations.

WORKFORCE INFORMATION DATABASE AND RFID TECHNOLOGY TO TRACK AND MANAGE WORKFORCE INFORMATION

  • Yong-Woo Kim;Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1094-1099
    • /
    • 2009
  • Workforce information is important in production planning because production planning requires matching a production unit's capacity to loads of assignments. However, tracking and managing workforce information such as skills and accident history is not an easy job. This paper describes a prototype database system for a workforce database system that employs RFID technology. This system tracks daily workforce production capacity on sites. A pilot project is described to explore the benefits and possibility of using radio-frequency identification (RFID) to track and manage workforce information, and is followed by the results of a survey to identify benefits. In addition to the survey identifying the benefits of the database system, the paper also presents a list of challenges through a series of interviews.

  • PDF

Ensuring Economic Benefits of Mitigation Projects for Improving the Image of Construction Industry

  • Son, Chang-Baek;Shin, Won-Sang;Kim, Dae Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.3
    • /
    • pp.67-74
    • /
    • 2014
  • Over the last several decades, the United States has experienced a great number of natural disasters. To minimize the impact of the natural hazard events, the U.S. government spent a tremendous amount of money through federal assistant programs. To be eligible for the programs, a mitigation project must be cost effective (more benefits compared to project costs). However, the state and local communities suffering from the natural disasters generally have difficulty in collecting reliable evidence for their damages which can be converted later into benefits when a mitigation project is implemented. Therefore, this paper shows the process of conducting a benefit cost analysis with limited data. Besides, it also provides how to apply the limited data to the analysis through a case study. Consequently, this paper help state and local communities get funding from the federal government, which in turns will improve the image of construction industry by preventing people from natural disasters.

Indicators of Economic Evaluation and Case Studies on New & Renewable Energy (신재생에너지 경제성 평가 결과 분석 및 평가지표 연구)

  • Ahn Eun-Young;Kim Seong-Yong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.600-603
    • /
    • 2005
  • U.S. National Research Council proposed benefits framework for energy R&D project as economic benefits, environmental benefits, security benefits and knowledge benefits. Following this framework, U.S. National Renewable Energy Laboratory evaluated the projected benefits of Federal Energy Efficiency and Renewable Energy Programs in the indicators of energy-expenditure savings, energy system cost savings, $CO_2$ emissions reductions. oil savings, natural gas saving and avoided additions to central conventional power. As this result, geothermal energy have predominant position in the energy-expenditure savings, natural gas saving and avoided addi t ions to central conventional power to FY2050. The projected benefits, in monetary value, of the whole supply-potential of geothermal energy in Korea were evaluated as 480.2 billion Won, 43.1 billion Won and 135.8 billion Won for the private energy-cost savings, social environmental-cost savings, and import energy-cost saving, respectively.

  • PDF

Benefit-Cost Analysis for Developing Jeongja Port in Ulsan (울산지역 어항개발의 경제성 평가 - 정자항을중심으로 -)

  • Kim, Tae-Yong
    • The Journal of Fisheries Business Administration
    • /
    • v.39 no.1
    • /
    • pp.63-85
    • /
    • 2008
  • The objective of this study is to review the methodology of economic analysis of fishing ports by examining the economical feasibilities of a national fishing port (Jeongja Port) in Ulsan. This study utilized market value evaluation method to measure the benefits and costs related to the development of ports. The benefit variables are income effects resulting from the developments while the cost variables are sum of construction costs and maintenance costs. The income effects are measured in two ways: (1) income from individual project resulting from the developments, (2) the income effects by utilizing investment multipliers. The results shows that the BC ratio (Benefits/Costs) of Jeongja port by using (1) income from individual project resulting from the developments was 1.07 while the BC ratio by using (2) the income effects by utilizing investment multipliers was 1.10 due to a relative short period of useful life for investment multipliers. However, the income variable utilizing investment multipliers is more sensitive to the period of duration than the income variable from individual project.

  • PDF

Analysis of the BIM technology status and the development strategy in Korea

  • Yun, Seok-Heon;Kim, Sang-Chul;Lee, Namhun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.648-649
    • /
    • 2015
  • BIM could be used for integrating project information through life cycle of building facilities. Also it could improve the accuracy and work efficiency through data interoperability with other disciplines. However, these benefits from adopting BIM could not be attained easily in real project cases. In order to make the most use of BIM and get the maximum benefits from it, the environments such as standards, guidelines and the related technologies are also could be supported. Therefore many countries are developing or already developed the technology roadmap for BIM. In this study, we tried to analyze the BIM technology status and develop the strategy for improve usability of BIM in Korea.

  • PDF

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.3
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

Transportation Economic Analysis Method for a Maglav System (자기부상열차 도입의 교통경제학적 평가방법 연구)

  • Kim Hyun-Woong
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1276-1280
    • /
    • 2005
  • The Maglav system project affects communities and are usually funded by public agencies. Evaluation of this project that considerably impact whole communities requires public involvement. This specific requirement of transportation projects determines the method of their evaluation as the impacts are estimated from the transportation economic point of view. Especially evaluation criteria must reflect the needs of the interested parties and should consider all foreseeable benefits and losses caused by the Maglav project. To select evaluation criteria and evaluation method may help a decision--maker in making a best selection for a Maglav project.

  • PDF

Estimation of the Expected Socio-economic Benefits of the Largescale Comprehensive Agricultural Development Project and Jointcost Allocation -In the Case of Kumgang Project Area- (대단위 농업종합개발사업의 사회경제적 기대편익 추정과 결합비용의 배분 -금강지구를 중심으로-)

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.159-176
    • /
    • 1996
  • This study is aimed at reviewing the methods of joint cost allocation and allocating the joint cost of estuary dam with specially repect to Kumgang Large-scale Agricultural Comprehensive Development Project. Apart from the water resource development project propelled by Water Resource Development Corporation in connection with Law of Multipurpose Dam Development, the Largescale Comprehensive Agricultural Development Projects couldn't ins-titutionally be carried out cost allocation of common facilities, even though it were concerned with irrigation, municipal and industrical water supply, flood control, sightseeing and industrial zone development components. To decrease farmer's burden of the project costs and, operation and maintenance costs, the joint costs of common facilities like estuary dam included in agricultural development projects have to be allocated by suitable method as alternative cost-remaining benefit method and the analytical activity should be supported by revising the concerned laws as Rural Development and Promotion and, Rural Rearrangement conpatible with the law for multipurpose dam development. Kumgang Agricultural Comprehensive Development Project was selected as a case study for the estimation of socio-economic benefits by project components and joint cost allocation of the estuary dam. The main results of the study are as follows; Joint cost allocation and unit charges by components 1. The project area will be 25,554ha with total project cost of 624,860 million won including the estuary dam cost of 120,843 million won. The project costs were ex-pressed by 1994 constant price. 2. Total quantity of water was estimated 365 million tons which were consisted of 245 million tons for irrigation, 73 million tons for municipal water and 47 million tons for industrial water. 3. The rates of joint cost allocation were amounted to 34.2% for agriculture, 2.5% for sightseeing, 45.7% for transportation, 11.8% for M & I water supply and 5.8% for flood control respectively. 4. The unit financial charges by project components were estimated at 7.88 won per ton for irrigation, 16.11won for M & I water, 1,686won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The financial charges using straitline method for depreciation were estimated at 7.88won per ton for irrigation, 9.12won per ton for M & I water, 624won per vehicle one pass for transportation and 331won per Pyeong for sightseeing area. 5. The unit economic charges by project components were estimated at 21.1 won per ton for irrigation, 15.2won for M & I water, 977won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The economic charges using straitline method for depreciation were estimated at 11.72won per ton for irrigation, 8.61won per ton for M & I water, 331won per vehicle one pass for transportation. Policy recommendation 1. The unit operation and maintenance costs for irrigation water in the paddy field couldn't be imposed as the water resource cost untreated. 2. The dam costs including investment cost and O & M cost, as a joint cost, had to be allocated by each benefited components as transportation, M & I water supply, flood control, irrigation and drainage, and sightseeing. But the agricultural comprehensive project have been dealt as an irrigation project without any appraisal socio-economic benefits and any allocating the joint cost of estuary dam. 3. All the associated project benefits and costs must be evaluated based on accounting principle and rent recovery rate of the project costs and O & M costs should be regulated by the laws concerned. 4. The rural development and promotion law and rural rearrangement law have to be revised comprising joint cost allocation considering free rider problems. 5. The government subsidy for the agricultural base development project has to be covered all the project costs. In case of common facilities representing joint cost allocation problems, all the allocated casts for other purposes like transportation and M & I water supply etc. should be recovered for formation in investment fund for agricultural base development and to procure O & M costs for irrigation facilities.

  • PDF