본 연구는 문헌정보학 교육에서 프로젝트기반학습의 적용이 학습자의 협력적 자기효능감에 미치는 영향을 살펴보기 위한 연구이다. 이를 위하여 디지털도서관 시스템 평가 과목의 수강생 26명을 대상으로 협력적 자기효능감에 대한 사전설문과 사후설문을 실시하여 그 변화를 측정하였고, 대응표본 t-test를 통해 통계적 유의성을 분석하였고, 프로젝트 학습의 실제성이 협력적 자기효능감의 세부요인들과 상관관계가 있는지도 조사하였다. 분석 결과 프로젝트기반학습법은 학습자의 협력적 자기효능감의 세부하위요인들인 리더의 양상, 의견 교환, 의견 평가, 그리고 의견 통합에 대하여 모두 유의미한 효과가 있다는 것과, 학습의 실제성 중 자원의 실제성이 협력적 자기효능감과 부분적으로 상관관계가 있다는 것을 확인하였다.
The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.
The 3th International Conference on Construction Engineering and Project Management
/
pp.440-448
/
2009
Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.
본 연구에서는 농촌지역개발사업 지원과 농촌마을의 브랜드자산 및 농촌마을의 사회경제적 효과의 구조적 관계 간의 구조적 관계를 분석하는 것에 목적을 두었으며, 이를 위해 농촌지역개발사업 지원을 받고 있는 전라북도 농촌마을주민들을 대상으로 설문조사를 실시하였다. 수집된 설문자료는 구조방정식모형분석과 Sobel-test를 통해 구조적 관계를 분석하였다. 분석 결과, 생활환경 개선사업, 소득기반 조성사업, 농촌관광 시설사업, 지역역량교육사업 지원이 농촌마을의 브랜드자산에 유의한 정(+)의 영향을 나타내었다. 그리고 농촌마을의 브랜드자산은 농촌마을의 사회경제적 효과에 유의한 정(+)의 영향을 나타내었다. 또한, 생활환경 개선사업, 마을경관 개선사업, 소득기반 조성사업, 농촌관광 시설사업, 지역역량교육사업 지원 모두 농촌마을의 사회경제적 효과에는 유의한 영향을 미치지는 않았으나, 농촌마을의 브랜드자산을 매개로 하여 유의한 영향을 미치는 것으로 나타났다. 본 연구를 통해 농촌마을 지역개발전략에 있어서, 농촌마을의 브랜드자산 및 사회경제적 성과에 미치는 영향 요인을 도출하였고, 농촌지역개발사업의 적극적인 지원의 역할 및 중요성을 제시하였다는 점에서 본 연구의 의의를 찾을 수 있다.
최근 국내 기업의 해외 플랜트 수주는 꾸준히 증가하는 추세이며, 2014년 상반기의 수주액은 전년도 대비 93% 이상 크게 증가되었다. 또한, 2015년 3사분기가 지난 현재, 해외 플랜트 수주액은 이미 2,498억 달러를 넘어섰다고 조사된 만큼 플랜트 산업에 대한 관심이 증가되고 있다. 플랜트 프로젝트의 생애주기 중 시공 이전 단계의 건설 사업관리(CM)는 사업 초기 단계에 내재된 불확실성을 보완하고, 합리적인 의사결정을 지원한다는 측면에서 그 역할의 중요성이 대두되고 있다. 그 중에서도 사업 기획 단계의 사업 발굴 및 사업 참여방안 검토 업무는 향후 사업의 성공과 실패를 좌우할 수 있는 큰 영향력을 가진 중요한 업무이지만, 의사결정을 위한 각 분야 간의 빈번한 협의, 그리고 이에 따른 계속된 수정, 변경 등과 비효율적인 반복 작업이 문제가 되고 있다. 따라서 이를 효과적으로 수용할 수 있는 업무 프로세스의 변화가 필요하게 되었고, 본 논문에서는 플랜트 프로젝트 기획 단계의 '사업 발굴 및 사업 참여방안 검토'를 대상으로 주요 업무 항목을 도출하고 전문가 자문을 활용한 델파이 분석을 통해 표준화된 업무 프로세스를 정립하였다. 본 논문의 결과는 우리나라 EPC 기업이 해외시장에서 기획 분야의 기술 경쟁력을 확보하고 업무 효율성을 제고할 수 있는 기반을 마련하는 데에 활용될 수 있을 것으로 기대된다.
일반적으로 건설공사의 흙막이공사는 구조물의 건설을 가능하게 하고, 주변 지반의 변위를 최대한 억제하며, 주변 구조물이나 현장 작업자의 안전을 확보하는데 중요한 역할을 하고 있다. 지반 특성, 주변의 지형 특성, 수리학적 환경 등의 설계 조건에 따라 흙막이공법 및 시공방법이 달라진다. 그 결과 흙막이 공사비도 변동하게 된다. 특히 서울시의 경우 지역에 따라 다양한 환경과 지반조건이 있다. 본 연구의 목적은 주로 서울시내의 아파트 건설사업의 흙막이 공사비를 분석하고, 사업기획단계에서 대략적인 흙막이 공사비를 산출하는 것이다. 서울시의 특성에 맞는 흙막이 공사비를 예측하는 모델을 개발하고, 이를 이용하여 흙막이공사의 공사비를 예측한다. 본 연구에서는 10개(대지면적, 연면적, 동수, 건축면적, 지하층면적, 굴착깊이, 굴착량, 굴착면적, 흙막이둘레길이, 흙막이면적)의 사업개요를 독립변수로 이용한 다중회귀모델에 의한 흙막이 공사비의 예측치를 제시한다. 다중회귀모형을 이용한 서울시 아파트 건설사업의 흙막이 공사비 예측 결과 오차율은 10.75%였다. 이는 서울시내 아파트 건설사업의 기획단계에서 흙막이 공사비 산정업무에 적용될 가능성이 높고, 서울시내 아파트 건설사업의 흙막이 공사비 산정작업에 크게 기여할 것으로 사료된다.
현재 실적공사비 단가는 한국건설기술연구원에 의해 발표되고 있으며, 대규모 공사에서 수집된 공사비 자료를 분석하여 작성되고 있다. 따라서 소규모 공사의 경우 현행 실적공사비 단가를 적용함에 있어 불합리한 문제점이 발생하고 있다. 이러한 문제점을 분석하기 위해, 본 연구에서는 대 소규모 토목, 건축, 기계설비공사에 대한 실적공사비를 상호 비교하였다. 그 결과, 소규모 공사의 실적공사비는 대규모 공사에 비해 평균적으로 26.6%가 높음을 확인할 수 있었다. 한편, 노무비에 의한 대 소규모 공사의 실적공사비 차이는 18.4%이고, 재료비 경비에 의한 차이는 8.18%인 것으로 분석되었다. 또한 본 연구에서는 이를 시정하기 위한 소규모 공사의 실적공사비 보정방안을 제안하였다.
This study aimed to develop a parcel-unit soil loss estimation tool embedded in Excel worksheet, USLExls, required for the design of contaminated farmland restoration project and to analyze the impact of the project carried out soil-filling work on soil loss. USLE method was adopted for the estimation of average annual soil loss in a parcel unit, and each erosivity factor in the USLE equation was defined through the review of previous studies. USLExls was implemented to allow an engineer to try out different combinations just by selecting one among the popular formulas by each factor at a combo box and to simply update parameters by using look-up tables. This study applied it to the estimation of soil loss before and after soil-filling work at Dong-a project area. The average annual soil loss after the project increased by about 2.4 times than before on average, and about 60 % of 291 parcels shifted to worse classes under the classification criteria proposed by Kwak (2005). Although average farmland steepness was lower thanks to land grading work, the soil loss increased because the inappropriate texture of the cover soil induced the soil erosion factor K to increase from 0.33 before to 0.78 after the soil-filling work. The results showed that the selection of cover soil for soil-filling work should be carefully considered in terms soil loss control and the estimation of change in soil loss should be mandatory in planning a contaminated farmland restoration project.
The 8th International Conference on Construction Engineering and Project Management
/
pp.201-206
/
2020
Diversification of project delivery methods (PDM) under ever-changing construction business environment has significantly changed the role of project participants. Active efforts to effectively sharing the roles and responsibilities have been observed in the project management offices (PMOs) among owner/operator organizations as well as engineering, procurement, construction and maintenance (EPCM) firms. In order for being effective in a holistic way throughout the project life-cycle, a PMO needs to have 'adequate management skills' as well as 'essential technical capabilities' in cooperating with many different participants. One of the well-known examples of the PMO's tool to support these skills and capabilities is the effective 'work packaging (WP)' that serves as a common basis integrating all relevant information in a structured manner. In an attempt to enhance the construction productivity, the concept of 'advanced work packing (AWP)' has been introduced by Construction Industry Institute (CII). The AWP enables productivity to be improved by early planning of construction packages in the design phase "with the end in mind". The purpose of this study is to identify and evaluate the 'variables' of advanced work packing (AWP) for life-cycle information integration. Firstly, an extended concept of advanced WP based on the CII AWP was defined in order to comprehend many different issues of business functions (e.g. cost, schedule, quality, etc.). A structured list of major components and variables of AWP were then identified and examined for practical viability with real-world examples. Strategic fits and managerial effectiveness were stressed throughout the analyses. Findings, implications and lessons learned are briefly discussed as well.
The 6th International Conference on Construction Engineering and Project Management
/
pp.704-705
/
2015
Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.