Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.

Analysis of the Work and Cost of Supervisor in the Public Construction Corporation (공공발주처의 공사감독 업무영역과 비용 분석)

  • Cho Seong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.146-152
    • /
    • 2003
  • In the construction project, construction supervisor influences greatly the construction managements such as process management, quality management, safety management, and cost management. Therefore, from the first stage of the project, the managing activities of the supervisor are consistently needed. But the assesment of supervisor's work and cost has not been made enough in the public construction project. And there have been doubts as to whether a supervisor can take a consistent managing activity from the early stage of the project. Accordingly, the works between Korean supervisor and foreign supervisor in their public corporations are analyzed and compared in this paper. And the evaluation is made each of the cost for supervisor and the cost for engineer as a substitute of supervisor in construction project. This study is believed to contribute to improving the supervisor's work and reducing the personnel expenses and construction indirect cost.

On-Site Manpower Increasing Impact on Labor Productivity

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.139-147
    • /
    • 2005
  • During a typical construction project, a contractor nay often find that the time originally available or normally expected to perform its work has been severely reduced. To finish the project by the completion date, the contractor is forced to find a way to speed up the progress of its work to compensate for the reduction in available time. The most frequent initial reaction of contractors to this situation is to increase on-site manpower by working longer time (overtime), adding more workers (overmanning), or implementing shift work (shift work) to increase the rate of progress. The goals of this study were to investigate how these three methods affect labor productivity and to quantify their impact on labor productivity by analyzing real project data collected from sheet metal contractors and mechanical contractors in the US.

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

On the Plans of Kyongju's Sokkuram Restoration Project (1961) by Pai Ki Hyung (배기형의 「경주 석굴암 보수공사 설계도」(1961)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.53-64
    • /
    • 2019
  • This study examines the restoration project of Sokkuram, and introduces its preliminary plans by the architect Pai Ki Hyung. The restoration project started in 1958 with an inquiry committee of the restoration project, and was completed in 1964. Despite having undergone extensive repair work under Japanese supervision from 1913 and 1923, the repair work caused water leakages inside Sokkuram, and regular cleaning work that began in 1933 caused a lot of damage to the sculpture. In result of the surveys, the top priority of this project was to protect the sculptures inside Sokkuram by improving the environment of the cave. At that time, the architect Mr. Pai participated as a head of the fourth field surveyors to plan the restoration project and to design the preliminary plans. He proposed the installation of a double dome structure to prevent further water leakages on the concrete addition that was built up around the grotto by the Japanese. However, in 1961, the Cultural Heritage Committee of Korea examined the plans of Mr. Pai and immediately rejected them. The factors of the rejection were the omitting of entrance design, system of new double dome structure that presses the existing structure, and these changes that had to be made outside of the drainage plans. The repair work of Sokkuram began in 1961, and the main construction was building double dome structure and entrance installation. In this we realize that Mr. Pai's double dome structure plans were very important key concept of this project. This study attempts to demonstrate the double dome installations that Mr. Pai initially proposed, which ultimately remains as emblematic factors of Sokkuram's legacy.

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

Making Formular to calculate Reasonable Unit Cost for Asbestos Removal (석면해체공사의 적정 단가 산정)

  • Son, Ki-Sang;Park, Jong-Tae;Gal, Won-Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.3
    • /
    • pp.55-61
    • /
    • 2011
  • Unit cost for asbestos removal work which have been made out at government contract award for recent three years has been reviewed and shown with table. And the cost have been compared with ones made out by two agencies, American asbestos removal specialists, government ministry for making out comparison tables. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there in introduction possibility of separate contract-awarding system, it is found out. In interior removal work case, it is thought that 50% by owner, 60% unit work cost by the expert of which removal specialist think as reasonable unit cost. the results for exterior and spray work method are shown with almost same context. Impact factors for determining unit work cost such as project mount, project kind, contract-awarding method, subcontract method have been compared with parties. Removal specialist and expert group have almost same ideas for project amount which has been hightestly weighed but owner's recognition has partially lower than specialists idea. There are almost no difference of recognition between three(3) parties for project kind. Idea comparison of reasonable unit work cost for asbestos removal work between three concerned parties has been analyzed and found out that expert group do unit work cost, 65% of which removal specialists estimate, in interior tex removal. And there is almost no difference between them in exterior roof slate removal. But there is considerable difference between them that owner estimates 50% unit cost of specialist one while expert group estimate 50% of specialist idea of unit removal cost.

Factors Affecting the Work Motivation of the Construction Project Manager

  • PHAN, Phuong Thanh;PHAM, Cuong Phu;TRAN, Nhu Thi Quynh;LE, Hang Thi Thu;NGUYEN, Hanh Thi Hong;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.12
    • /
    • pp.1035-1043
    • /
    • 2020
  • Project manager plays a very important role in the success of any project. The primary duty of the project manager is to combine the outcomes or results of the various processes and activities of project management into a systematic project management strategy or plan for the project. In the construction industry, a lack of motivation is an urgent problem for many project managers in construction and engineering projects. Lack of motivation affects the quality and productivity of jobs, reducing profits and growth for companies, businesses, contractors or organizations that rely on human resources. The reasons for this lack of motivation are diverse ranging from salary to culture to life and working environment, among others. Through surveys and data analysis using Cronbach's Alpha reliability and EFA (Exploratory Factor Analysis), our research scaled the factors affecting work motivation of project managers in the construction industry in Vietnam. The research results identified six major groups of relevant factors including (i) salary and benefits, (ii) work environment, (iii) promotion opportunities, (iv) organizational culture, (v) interest in the job, and (vi) relationship with the organization. From there, this paper contributed useful information as well as measures for businesses, companies, contractors or organizations in the construction industry.

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.