PROJECT MANAGEMENT FOR ENERGY MANAGEMENT SYSTEMS (에너지 관리(管理)시스템의 사업관리(事業管理))

  • Lee, Kyu-Sun;Yoon, Kap-Koo
    • Proceedings of the KIEE Conference
    • /
    • 1983.07a
    • /
    • pp.174-176
    • /
    • 1983
  • This paper explains about general considerations and project management for a modern electric utility EMS/SCADA system. This paper also attempts to help engineers in the following situation: They are given the task of specifying, buying and installing a EMS/SCADA system. When do they start? What tools/texts/guidelines are available to help them out? If it is a large system, methodical project management is necessary. What are the critical tasks to be undertaken? When should they been done and how does their timing impact the whole project.

  • PDF

Design and Application of PMO-Based Project Management Systems (PMO 기반 프로젝트 관리 시스템의 설계 및 적용)

  • Jeong, Cheon-Su;Kim, Seung-Ryeol;Kim, Nam-Gyu
    • The Journal of Information Systems
    • /
    • v.20 no.4
    • /
    • pp.119-143
    • /
    • 2011
  • Recently, Information System (IS) development projects such as the next generation IS project of the financial business domain have shown tendency to become large and complex. Accordingly, a large number of enterprises have introduced a Project Management Office (PMO) to successfully manage multiple complex large-scaled projects. Many researches and empirical studies have proved the positive results of PMO-based projects. For example, most PMO-based projects have been accomplished successfully without exceeding the planned deadline and budget. However, even in the case of PMO-based projects, participants are still supported by legacy Project Management Systems (PMS) developed without considering the PMO. It implies that recent large projects are hardly performed efficiently because of the large gap between the legacy PMS tools developed only for single small projects and the real process of PMO-based project management. Therefore, we attempt to design and develop a PMO-based PMS in which the role and responsibility of PMO are completely implemented. To demonstrate our systems practicality, we applied the devised system to the real project management cases of "K" bank in The Republic of Korea. According to the results of case analysis, all of the four projects supported by our PMO-based PMS have been completed without exceeding planned deadline and budget, and the quality of their final outcome is appraised to be superior.

A Study on Maintenance Actual Condition and Revitalization of Rural Development Project (일반농산어촌개발사업 완료지구 시설물 실태분석 및 활성화 방안 연구)

  • Choi, Young-Wan;Kim, Keun-Ho;Eun, Hee-Chang;Lee, Young-Kyu;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.1-8
    • /
    • 2016
  • This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.

Design of a Sanction System for Six Sigma Project (식스 시그마 프로젝트를 위한 결재 시스템 설계)

  • Kang, Dae-Ki;Chang, Won-Tae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.4
    • /
    • pp.868-874
    • /
    • 2010
  • In this paper, we propose a design of automated electronic sanction system for management of six sigma projects. The proposed system performs diverse operations such as registering and choosing enterprise-wide enhancement project, managing schedules of the project, verifying the validity of the project, and thus managing the whole life cycle of the project. Each six sigma project is stored in the database repository for facilitation of its later use. The proposed system has been effectively applied in a Korean company, and thus, through the proposed system, we expect the effects of innovation-related and enhancement-related activities which six sigma is fundamentally pursuing.

Defining Functions for Integrated Information Management System of University Financial Support Project

  • Lee, Hae-Gun;Shin, Seong-Yoon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.10
    • /
    • pp.251-256
    • /
    • 2019
  • In this paper, we analyzed the business process and management characteristics of the university financial support project to define the function for the integrated information management system of the university financial support project. To this end, we reviewed the characteristic and business process of university financial support project and defined six common functions. In order to establish an integrated system applying the derived functions, the first things to be done need to standardize the business management system considering integration and to arrange the accounting regulations. Based on the functions and implications defined from this paper, we think that it will be helpful to design an integrated information management system for university financial support project.

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

Development of An Evaluation Index for Intermediate Outcomes from Rural Village Development Project (농촌마을종합개발사업의 중간결과 평가지표 설정)

  • Kim, Hyeon-Soo;Kim, Kyung-Ryang;Choi, Youn-Sang;Jung, Hae-Dong;Jun, Taek-Ki;Hong, Chan-Sun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.429-435
    • /
    • 2005
  • This study attempts to develop indices in order to make an objective and effective evaluation of achievements in the first stage of operation of the Rural Village Development Project(RVDP) (the first 3 years of its operation). The results are as follows 1. Evaluation purposes are expansion of income-generating bases, improvement of living environments, strengthening of village's competence and establishment of an effective project's management system. 2. Evaluation items for the first three evaluation purposes, which are income-generating bases, improvement of living environments and strengthening of village's competence, are record of performance and substantiality in project's operation, results from operation, and capability in managing the project. Those for establishment of an effective project's management system are participation of habitants and the projects's management system. 3. As this study aims to develop the indices which can evaluate the state of operation in the interim of the project's operation and outcomes generated by then, the evaluation indices are selected by considering those criterions of representativeness, accessibility, usefulness and reliability. 4. As the indices developed in this study efficiency evaluate the process of project's operation and thus evaluate basically the project's operation on the basis of its efficiency. But, considering the purposes of the RVDP, it is included for the overall project's management system and plans for managing activities of the project to be evaluated on the basis of effectiveness.

  • PDF

Developing Measurement System for Key Performance Indicators on Building Construction Projects (건설 프로젝트 효율적 성과관리를 위한 핵심 지표 체계 구축)

  • Cha, Hee-Sung;Kim, Tae-Kyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.120-130
    • /
    • 2008
  • In construction industry, project performance should be evaluated in terms of project value objectives, i.e., cost, time, quality, safety, and environment. However, there have been few, if any, systematic approaches in assessing comprehensive performance level which encompasses the whole spectrum of project value objectives. It is non trivial to establish the standardized performance metric system due to the project individualities. This study provides a new approach in assessing the wide variety of project performance types by collecting the real industry project data. In addition, the proposed system has been validated through industry survey on project practitioners. It is concluded that the developed quantitative project performance measurement system would be effectively useful in indicating the level of current status of a particular project and furthermore, to provide a meaningful strategy for the future project in a more sustainable way.