• 제목/요약/키워드: Project Size

검색결과 931건 처리시간 0.036초

Risk Analysis on Offshore Windfarm Industry in South Korea: Based on the Jeonnam Offshore Windfarm Project

  • Kim, Tae Hyun;Kim, Yea-Sang;Chin, Sangyoon;Pallesen, Kristian
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.204-212
    • /
    • 2022
  • Recently, the Korean government has been actively promoting the smart city as their strategic agenda. However, to build smart cities that are greener, the authors believe it is essential to rapidly transit conventional energy sources such as fossil fuels to renewable energy. Although there is a big potential for Offshore wind in Korea, there has not been a full-scale commercial offshore wind farm until today. Since Korea is relatively a new market compared to the EU, it can be risky for developers. The authors will introduce risk management best practices in the offshore wind industry applicable to the Korean environment. This paper will mainly introduce an offshore wind project size of 99 MW. The project is expecting a Finance Close (FC) in Q3 2022, so the project team has prepared a risk register with over 150 risks and levers throughout the project lifecycle. Overall risks include risks with Development Expenditure (DEVEX) impact, a Capital Expenditure (CAPEX) impact, and an Operating Expenditure (OPEX) impact. Based on the identified risks, a more qualitative assessment of Cost and Schedule Impact was conducted. In conclusion, a Monte Carlo simulation was performed to propose a quantitative risk assessment to evaluate a benchmark contingency of the project cost.

  • PDF

소프트웨어 개발기간 추정 모델 (A Software Estimating Model for Development Period)

  • 이상운
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제31권1호
    • /
    • pp.20-28
    • /
    • 2004
  • 소프트웨어 개발 초기에 개발비용, 소묘인력과 기간을 추정하는 것은 소프트웨어공학 분야의 중요하면서도 어려운 문제이다. 기존 모델은 개발업체의 생산성 수준을 고려하지 않고 단순히 기능점수와 노력, 노력과 개발기간 관계에 대한 회귀분석을 통해 개발노력과 기간을 추정하는 모델을 제시하였다. 그러나 동일한 규모의 소프트웨어라도 개발업체의 생산성 수준에 따라 다른 노력의 양이 투입되며, 동일한 노력이 투입되더라도 생산성에 따라 개발기간이 달라진다. 생산성 수준을 고려하지 않은 제안된 모델들은 실제 개발될 프로젝트 적용에 제한점을 갖고 있다. 본 논문은 기존 모텔의 단점을 보완하기 위해 생산성을 고려하여 개발기간을 추정할 수 있는 모델들을 제안한다. 생산성에 기반 하여 다양한 방법으로 개발기간을 추정할 수 있는 모델을 제안하고 모델들의 성능을 비교하였다. 모델 성능 비교 결과 생산성에 기반 하여 소프트웨어 규모로부터 개발기간을 추정하는 모델이 단순하면서도 가장 좋은 결과를 얻었다. 본 모델은 사업 초기에 프로젝트 관리자에게 소프트웨어 개발 기간 의사결정 정보를 제공한다.

DEMATEL 기법을 활용한 프로젝트 관리 성공을 저해하는 장애요인 간의 영향 관계 분석 (Analyzing the Influence Relationship between Barriers to Success of Project Management Using DEMATEL Method)

  • 이아연;장미경
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.214-229
    • /
    • 2021
  • There is an increasing need for complex and large projects to be carried out quickly. As the duration, size, and cost of the project increase, concerns about project failure are also rising. Finding factors that hinder the performance of an effective project and eliminating them in advance or controlling and managing them more effectively can be a more direct way to secure the success of the project. Previous studies have identified compositional dimensions that are classified according to attributes, covering the various obstacles that affect the success of the project through existing literature. It is a follow-up to previous research. Using DEMATEL techniques, we would like to propose to explore the appropriate measures that an entity and organization can take by identifying the causality between factors through cross-impact analysis of project disabilities and even presenting factors that may arise when they are identified. As a result of the analysis, according to the indicators to evaluate the importance, 8 factors were found to be relatively important factors, excluding the factors that Failure of project feasibility analysis and Technical environment change. In addition, 5 factors were found to be causative factors; Technical environment change, Unclarity project plan, Strategic consistency error, Inaccuracy of requirement definition, and Failure of project feasibility analysis. In contrast, the remaining 5 factors were found to be the result factors; Lack of benefits realization, Negative attitude of top management, Stakeholder conflict, Difficulty of process management, and Disturbance of communication.

건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 - (The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim-)

  • 윤준선
    • 한국중재학회지:중재연구
    • /
    • 제15권3호
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

농촌지역개발정책을 위한 새마을사업의 현대적 함의 (Present Implications of Saemaul Project for Rural Development Policy)

  • 양원식;정남수
    • 농촌계획
    • /
    • 제22권2호
    • /
    • pp.9-18
    • /
    • 2016
  • In this research, we reappraise saemaul project which is a leading role of rural development in a present perspectives and deduct social and political implications for rural development. For deducting problems and implications, related documents and previous researches are reviewed. Administration statistics are also gathered and analyzed for monitoring detailed projects propulsion progress and results. Samaul project is reappraised based on previous researches such as rural development, regional agricultural production system improvement, agricultural distribution system improvement, leader breeding, income improvement, and governance. Saemaul project has basically positive characteristics because of decreasing growth gap of urban and rural area by empowering cooperation of rural residents, instilling leadership, making village fund, constricting networks of government and urban area for administrative and financial assistant. In conclusion, there are implications that continues interests of most powerful sovereignty and comprehensive assistant of government are needed for overcome agricultural and rural crisis. Saemaulundong is a united and systematic approach in village level. In south korea where most of farms are small size, village or regional level assistants started in saemaulundong are still needed. In regional development, we can infer that will and ability development of participated residents are most basic and important factors for successful project propulsion in saemaul project.

해군에서 수행하는 국방 실험사업 발전방안을 위한 탐색적 연구 (An Exploratory Study for the Development Plan of the National Defense Experiment Project Conducted by the Navy)

  • 우동성;이보람;류재학;김동호
    • 한국IT서비스학회지
    • /
    • 제20권6호
    • /
    • pp.151-162
    • /
    • 2021
  • Since 2012, the Navy has been conducting a defense experiment project to evaluate the possibility of military application by introducing new technologies related to excellent private informatization in the defense field. There are many projects that have spread because they are suitable for military use, but some have ended as experimental projects themselves because they do not meet the military's required performance. Continuous development is required as increasing the spread rate by successfully carrying out defense experiment projects is the basis for defense reform. This study analyzed the performance of major projects carried out by the Navy and presented considerations for the development of defense experiment projects to be carried out by the Navy in the future. The main achievements were derived in various ways in terms of project performance and system operation, and the considerations can be summarized in the field of raising business requirements, securing resources for system operation, determining the size of companies for project execution, and security measures. The research results can be used as data to determine the required defense experiment project and efficiently carry out the project.

과원 규모화 사업이 농가 수익성에 미치는 영향 - 사과를 중심으로 - (Effect of the Orchard Scale Improvement Project on Farm Profitability - Focusing on Apple -)

  • 김세혁;임청룡;김태균
    • 농촌계획
    • /
    • 제30권1호
    • /
    • pp.99-106
    • /
    • 2024
  • The purpose of this study is to analyze how the orchard scale improvement project affects the profits of apple farmers. For this purpose, the variable profit function of Apple was estimated using seemingly unrelated regression analysis. For the analysis, raw data from the Rural Development Administration's Agricultural Income Survey from 2015 to 2021 were used. Of the 1,009 apple farms, 95 farms participated in the orchard scale improvement project and 914 farms did not participate. The results show that the profits of farms participating in the project were found to be higher than those of non-participating farms, and as the cultivation area increased, profits tended to increase and then decrease. The results also indicated that below a certain size (19,462m2), the profits from project participation appear to be lower. The results of this study can provide useful information to the establishment of government policies and apple farmers who want to participate in the orchard scale improvement project.

Productive and Reproductive Performance of Kajli and Lohi Ewes

  • Nawaz, M.;Khan, M.A.;Qureshi, M.A.;Rasool, E.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제12권1호
    • /
    • pp.61-67
    • /
    • 1999
  • Data from 22837 lambings of Lohi and Kajli ewes from 1962 through 1994 were used to analyse productive and reproductive traits and wool production, Overall litter size at birth averaged 1.33 being 1.45 for Lohi and 1.21 for Kajli ewes. The corresponding values at weaning were 1.23, 1.32 and 1.14, respectively. Litter size was consistently lowest for one year old, with a substantial increase at two, three and four years of ewe age and marginal increase thereafter, Ewes lambing in spring weaned 0.08 more lambs per parturition than ewes lambed in Autumn (p<0,01). Lamb birth weights were affected by ewe breed (p<0.01) and increased with ewe age. Overall lamb weaning weight (120 d) of 17993 lambs was 20.3 kg. Weaning weight was affected by breed, sire, year of birth, sex, rearing rank and weaning age (p<0.01). The highest mean weaning weight was 21.9 kg for Lohi lambs followed by Kajli lambs (18.8 kg), Lambs from Kajli ewes were 9% heavier at birth but 14% lighter at weaning. Twin born lambs were 18% lighter at birth and 13% at weaning than single born lambs. Male lambs were 3% heavier at birth and 4.5% heavier at weaning than female lambs. Overall annual mean wool production was 2,64 kg, Kajli ewes were heavier at breeding than Lohi ewes (i.e. 46.2 vs 44.8 kg). Lohi ewes being 3% less body weight produced 38% more wool and 18% more litter weaning weight than Kajli ewes, When average weight of lamb weaned per ewe weaning lambs was adjusted for ewe average metabolic body size, Lohi ewes were most efficient (i.e. arbitrary assigned value of 100) compared to Kajli ewes achieving only 83% of Lohi level.

공공도서관 공간규모계획기준에 관한 기초적 연구 - 공공도서관건립 컨설팅지원사업 결과를 중심으로 - (A Basic Study on the Planning Standard of Space Size for Public Library - Focus on the result of the consulting support project for construction of public library -)

  • 고흥권;임채진;임호균
    • 한국실내디자인학회논문집
    • /
    • 제21권4호
    • /
    • pp.190-199
    • /
    • 2012
  • In this era of information, the public library takes a important role in the local community. In several years, public libraries have been proliferated in our society. However, there have not been specific planning standards of space size for construction of public library. The situation has lead the local governments to the need of consulting for the construction and management of library in search of appropriate guideline. The research paper focuses on the result of consulting support project for construction and management of public library. It examines total 11 libraries which were consulted from 2009 to 2011. It examines the configurational differences between the first scheme from the local government and the final scheme after the consulting, and the percentages of gross areas of each parts of library, reference and reading area, office area, education and cultural area, and public common use area. The analysis concludes that reference and reading area increased by 6.4% from 34.1% to 40.5%, and public common use area reduced by 6.1% from 30.2% to 24.1%, which represents a certain tendency of the configuration ratio of the each parts. Thus, the paper could be a starting point of establishing planning standard of space size for public library.

  • PDF

Design Procedure for System in Package (SIP) Business

  • Kwon, Heung-Kyu
    • 한국마이크로전자및패키징학회:학술대회논문집
    • /
    • 한국마이크로전자및패키징학회 2003년도 International Symposium
    • /
    • pp.109-119
    • /
    • 2003
  • o In order to start SIP Project .Marketing (& ASIC team) should present biz planning, schedule, device/SIP specs., in SIP TFT prior to request SIP development for package development project. .In order to prevent (PCB) revision, test, burn-in, & quality strategy should be fixed by SIP TFT (PE/Test, QA) prior to request for PKG development. .Target product price/cost, package/ test cost should be delivered and reviewed. o Minimum Information for PCB Design, Package Size, and Cost .(Required) package form factor: size, height, type (BGA, QFP), Pin count/pitch .(Estimated) each die size including scribe lane .(Estimated) pad inform. : count, pitch, configuration(in-line/staggered), (open) size .(Estimated) each device (I/O & Core) power (especially for DRAM embedded SIP) .SIP Block diagram, and net-list using excel sheet format o Why is the initial evaluation important\ulcorner .The higher logic power resulted in spec. over of DRAM Tjmax. This caused business drop longrightarrow Thermal simulation of some SIP product is essential in the beginning stage of SIP business planning (or design) stage. (i.e., DRAM embedded SIP) .When SIP is developed using discrete packages, the I/O driver Capa. of each device may be so high for SIP. Since I/O driver capa. was optimized to discrete package and set board environment, this resulted in severe noise problem in SIP. longrightarrow In this case, the electrical performance of product (including PKG) should have been considered (simulated) in the beginning stage of business planning (or design).

  • PDF