The ice damage occurs frequently in cold and dry region of western China in winter ice period and spring thaw period. In the drift ice condition, it is easy to form different extrusion force or impact force to damage tunnel lining, causing project failure. The failure project could not arrive the original planning and construction goal, giving rise to the water allocation pressure which influences diversion irrigation and farming production in spring. This study conducts the theoretical study on contact-impact algorithm of drift ices crashing diversion tunnel based on the symmetric penalty function in finite element theory. ANSYS/LS-DYNA is adopted as the platform to establish tunnel model and drift ice model. LS-DYNA SOLVER is used as the solver and LS-PREPOST is used to do post-processing, analyzing the damage degrees of drift ices on tunnel. Constructing physical model in the experiment to verify and reveal the impact damage mechanism of drift ices on diversion tunnel. The software simulation results and the experiment results show that tunnel lining surface will form varying degree deformation and failure when drift ices crash tunnel lining on different velocity, different plan size and different thickness of drift ice. The researches also show that there are damages of drift ice impact force on tunnel lining in the thawing period in cold and dry region. By long time water scouring, the tunnel lining surfaces are broken and falling off which breaks the strength and stability of the structure.
There are always many kinds of risks in software development such as frequent changes of requirements. Especially those risks related to the software characteristic of non-visibility can be threat to the project success. That lead us to the need of process implementation to reduce and minimize those risks. Although, most of the organization recognizes the importance of risk management, actual implementation requires professional knowledge in this area. CMMI, the de facto standard in process reference model, also emphasizes on risk management process area but only provides goals and practices to be implemented, not detail procedure and methods. In this paper, we developed Risk management implementation model based on IDEAL, the process improvement model based on CMMI. The proposed model will help the organizations to implement risk management process which is proper to their situation in the factor of organization size and project characteristics.
During the last several decades, Korea has been regarded as one of the fastest growing economies in the world. However, the small size of national land has not met the vigorous demand for land necessary to develop economic infra-structures such as large-scale harbors airports and highways. In order to satisfy the growing demand for land, the Korean government and industry have implemented the national land development programs to reclaim land from the sea fur the several decades. It is certain that these land development programs have resulted in a lot of property disputes between fishermen and public project administrators. This paper is to develop a quantitative model to estimate compensation for damages or restriction of charted fisheries resulting from large-scale public projects. In this paper, the compensation model is derived by using cost-volume-profit analysis framework because the compensation for charted fisheries basically depends on the factors such as the costs, production volume, profit of charted fisheries damaged or restricted by public projects. The model shows that the compensation for damages or restriction of charted fisheries is determined by the average annual profit, damage duration period, and the degree of fishery damages. In addition, the degree of fishery damages measured by the ratio of lost profit to annual average profit turns out to be determined by the following factors: annul profit, unit variable cost, decrease in production volume, the rate of increase in variable cost, and a change in fixed cost. Furthermore, this parer discusses the nam issues related to practices and regulation of the compensation for fishery damages in the current Fishery Act of Korea and suggests some appraisal methods which will be able to lead to theoretically correct and fair compensation for fisheries damages resulting from large-scale public projects.
Kim, Seung-Sup;Jung, Sang-Min;Koo, Choong-Wan;Koo, Kyo-Jin;Hyun, Chang-Taek;Hong, Tae-Hoon
Korean Journal of Construction Engineering and Management
/
v.8
no.3
/
pp.116-124
/
2007
It is Increasing that requirements of social infrastructure which includes educational, welfare, cultural facilities for public. Government introduced BTI(Build-Transfer-Lease) as a PFI(Private Financial Initiative) system. This research is about BTL projects in small public educational facilities. Some problems when BTL system is applied to small public educational facilities are identified, and the reason of those problems are examined. This research proposes alternatives in a institutional way and it proposes improvements in contractual structure of consortium when BTL system is applied. Based on reasonable system, it promotes creativeness and effectiveness of a project, and it makes local minor construction companies participate in BTL project without difficulties as mentioned.
Park, Ha Jin;An, Man Sun;Cho, Nam Ho;Kim, Kyong Ju
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.2D
/
pp.285-293
/
2011
Sewage treatment facilities are growing rapidly in quantitatively and qualitatively. However, privatization such as up-size and professionalism, etc. are insufficient, compared to global companies' cases. Infrastructure Asset management has not been applied widely despite of sewage treatment facilities are one of the most critical social infrastructure. Maintenance, repair, and rehabilitation (R&R) practices of sewage treatment facilities have been studied and infrastructures asset management techniques have been applied. Cost model which makes it possible to calculate managerial costs such as major cost, etc. needs to be developed only with project basic information when proceeding new sewage treatment facility construction and management and overseas sewage project. Effects to converse major repair cost into capital, application of sewage treatment facility's asset management, expected effects, etc. were analyzed and suggested an alternative on the improvements of legal system.
To inspect the quality of data collected from a large-scale body measurement and investigation project, it is necessary to establish a proper data editing process. The three-dimensional body measurement may have measuring errors caused from measurer's proficiency or changes in the subject's posture. And it may also have errors caused in the process of algorithm expressing the information obtained from the three-dimensional scanner into numerical values, and in the course of data-processing dealing with numerous data for individuals. When those errors are found, the quality of the measured data is deteriorated, and they consequently reduce the quality of statistics which was conducted on the basis of it. Therefore this study intends to suggest a new way to improve the quality of the data collected from the three-dimensional body measurement by proposing a working procedure identifying data errors and correcting them from the whole data processing procedure-collecting, processing, and analyzing- of the 2004 Size Korea Three-dimensional Body Measurement Project. This study was carried out into three stages: Firstly, we detected erroneous data by examining of logical relations among variables under each edit rule. Secondly, we detected suspicious data through independent examination of individual variable value by sex and age. Finally, we examined scatter-plot matrix of many variables to consider the relationships among them. This simple graphical tool helps us to find out whether some suspicious data exist in the data set or not. As a result of this study, we detected some erroneous data included in the raw data. We figured out that the main errors are not because of the system errors that the three-dimensional body measurement system has but because of the subject's original three-dimensional shape data. Therefore by correcting some erroneous data, we have enhanced data quality.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.19-24
/
2007
Due to the decreasing of Korean Construction market situation, recently a lot of medium & small size contractors, engineering firms and consulting firms are extending their business area to overseas market. To compare with 80${\sim}$90's situation at that time only Contractor provide service to overseas but in recent, there are number of Design, CM/PM and other consulting services which provide service to overseas. With this figures, the number of nation also increased from middle east and South east asian area to central asia and african nations and among them Kazakhstan has became as new market for the construction industry based on it oil money and up stream of real estimate market. Based on this fact, we will explain one of our recent project case for PM service in Almaty, Kazakhstan to show others who have interest to do business in their.
The Transactions of the Korea Information Processing Society
/
v.5
no.3
/
pp.633-648
/
1998
Rapid computing environment, change of the application structure, and various user demand will increase the demand of the software development. Version control is helpful to improve productivity using delta, and useful to establish component from existing data of source code. This paper presents the design and implementation of the version control system. which is composed of retrieval system and delta management system. In retrieval system, vanous retrieve methods arc proposed. This methods provides the process methodology with filename, content, size and date. Various retrieve methods arc important for the effective delta management. Meta data can be easily composed for the delta management by these methods. Compared with other systems, this implemented version control system has some advantage. First, for delta management, version maintenance for delta management becomes easier by integrating the forward and back-ward methods. Second, delta managent part of a project is to unite the forward and backward method. the effieiency of this system is to increased in management. Also, this system supports a thechnique of using the database and files for project repository and makes the version management more effective.
Journal of the Korean Institute of Landscape Architecture
/
v.26
no.3
/
pp.45-51
/
1998
This research is concerned with environment problems related to Munhwa-Maul where Korean government are financially much supporting in developing housing sites and constructing houses. The purposes of this research are to find out the problems and to present the practical guidelines in order to improve an environmental quality of Munhwa-Maul in which will be under construction in the near future. The method for finding out the problems are based upon the most atisfaction and dissatisfaction of residents with opened interview. Both Mueur Munhwa-Maul and Umo Munhwa-Maul are considered for this research because Mueur Munhwa-Maul is characterized with a modern village where is located far from the city while Uo Munhwa-Maul, near the city. Also, these Munhwa-Mauls have been firstly constructed. The interview participants are 34 persons in all. They are confined to Mueur Munhwa-Maul and Umo Munhwa Maul that have been firstly constructed in Kyeongook. According to the interviews, each 60% of both Mueur Munhwa-Maul interview participants and Umo Munhwa-Maul ones have shown the their most positive satisfaction in a new housing and facility. It can be seen from that these figures that housing environment including facility of both Munhwa-Mauls is surely improved and successful. On the other hand, 43.8% of Mueur Munhwa-Maul participants and 14% of Umo Munhwa-Maul ones have particularly shown the most negative satisfaction in a size of housing lot. Also, 15.6% of Mueur Munhwa-Maul interview participant and 44% of Umo Munhwa-Maul ones have stated the most dissatisfaction in a traffic convenience. The reasons showing these differences are likely that 90% of Mueur Munhwa-Maul residents are farmer while 85% of Umo Munhwa-Maul ones are not farmer. With this results the purpose of munhwa-Maul project that government has been supporting and the reality of Umo Munhwa-Maul could be never coincident. Therefore, it can be inferred that housing layout should be reconsiderd to be appropriate for agriculture and that the government should carefully consider the contributions of new housing lot to real farmers. In addition, we can say that Munhwa-Maul project should be firstly accomplished in the district far from the city rather than near the city.
Jung, Yeong-Sang;Lee, Hyun-Il;Jung, Mun-Ho;Lee, Jeong-Ho;Kim, Jeong-Tae;Yang, Jae E
Korean Journal of Soil Science and Fertilizer
/
v.48
no.5
/
pp.522-527
/
2015
Decision of available soil depth based on soil physical and hydraulic properties for the $3^{rd}$ Landscape Vegetation Project in the Incheon International Airport was attempted. The soil samples were collected from the 8 sites at different depths, 0-20 and 20-60cm, for the three project fields, A, B, and C area. Physical and chemical properties including particle size distribution, organic matter content and electrical conductivity were analyzed. Hydrological properties including bulk density and water holding capacity at different water potential, -6 kPa, -10 kPa, -33 kPa, and -1500 kPa were calculated by SPAW model of Saxton and Rawls (2006), and air entry value was calculated by Campbell model (1985). Based on physical and hydrological limitation, feasibility and design criteria of soil depth for vegetation and landfill were recommended. Since the soil salinity of the soil in area A area was $19.18dS\;m^{-1}$ in top soil and $22.27dS\;m^{-1}$ in deep soil, respectively, landscape vegetation without amendment would not be possible on this area. Available soil depth required for vegetation was 2.51 m that would secure root zone water holding capacity, capillary fringe, and porosity. Available soil depth required for landscape vegetation of the B area soil was 1.51 m including capillary fringe 0.14 m and available depth for 10% porosity 1.35 m. The soils in this area were feasible for landscape vegetation. The soil in area C was feasible for bottom fill purpose only due to low water holding capacity.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.