• Title/Summary/Keyword: Project Size

Search Result 914, Processing Time 0.031 seconds

Damage Mechanism of Drift Ice Impact

  • Gong, Li;Wang, Zhonghui;Li, Yaxian;Jin, Chunling;Wang, Jing
    • Journal of Information Processing Systems
    • /
    • v.15 no.6
    • /
    • pp.1350-1364
    • /
    • 2019
  • The ice damage occurs frequently in cold and dry region of western China in winter ice period and spring thaw period. In the drift ice condition, it is easy to form different extrusion force or impact force to damage tunnel lining, causing project failure. The failure project could not arrive the original planning and construction goal, giving rise to the water allocation pressure which influences diversion irrigation and farming production in spring. This study conducts the theoretical study on contact-impact algorithm of drift ices crashing diversion tunnel based on the symmetric penalty function in finite element theory. ANSYS/LS-DYNA is adopted as the platform to establish tunnel model and drift ice model. LS-DYNA SOLVER is used as the solver and LS-PREPOST is used to do post-processing, analyzing the damage degrees of drift ices on tunnel. Constructing physical model in the experiment to verify and reveal the impact damage mechanism of drift ices on diversion tunnel. The software simulation results and the experiment results show that tunnel lining surface will form varying degree deformation and failure when drift ices crash tunnel lining on different velocity, different plan size and different thickness of drift ice. The researches also show that there are damages of drift ice impact force on tunnel lining in the thawing period in cold and dry region. By long time water scouring, the tunnel lining surfaces are broken and falling off which breaks the strength and stability of the structure.

Implementing Software Risk Management Process based on CMMI (CMMI기반의 소프트웨어 리스크 관리 프로세스 구축)

  • Do, Sung-Ryong;Han, Hyuk-Soo
    • Journal of Convergence Society for SMB
    • /
    • v.1 no.1
    • /
    • pp.45-53
    • /
    • 2011
  • There are always many kinds of risks in software development such as frequent changes of requirements. Especially those risks related to the software characteristic of non-visibility can be threat to the project success. That lead us to the need of process implementation to reduce and minimize those risks. Although, most of the organization recognizes the importance of risk management, actual implementation requires professional knowledge in this area. CMMI, the de facto standard in process reference model, also emphasizes on risk management process area but only provides goals and practices to be implemented, not detail procedure and methods. In this paper, we developed Risk management implementation model based on IDEAL, the process improvement model based on CMMI. The proposed model will help the organizations to implement risk management process which is proper to their situation in the factor of organization size and project characteristics.

  • PDF

The Derivation of a Model to Estimate Compensation for Damages in Chartered Fisheries by Using CVP Analysis (CVP 분석을 이용한 면허어업 손실보상액 평가 모형의 도출)

  • 정형찬
    • The Journal of Fisheries Business Administration
    • /
    • v.31 no.2
    • /
    • pp.133-153
    • /
    • 2000
  • During the last several decades, Korea has been regarded as one of the fastest growing economies in the world. However, the small size of national land has not met the vigorous demand for land necessary to develop economic infra-structures such as large-scale harbors airports and highways. In order to satisfy the growing demand for land, the Korean government and industry have implemented the national land development programs to reclaim land from the sea fur the several decades. It is certain that these land development programs have resulted in a lot of property disputes between fishermen and public project administrators. This paper is to develop a quantitative model to estimate compensation for damages or restriction of charted fisheries resulting from large-scale public projects. In this paper, the compensation model is derived by using cost-volume-profit analysis framework because the compensation for charted fisheries basically depends on the factors such as the costs, production volume, profit of charted fisheries damaged or restricted by public projects. The model shows that the compensation for damages or restriction of charted fisheries is determined by the average annual profit, damage duration period, and the degree of fishery damages. In addition, the degree of fishery damages measured by the ratio of lost profit to annual average profit turns out to be determined by the following factors: annul profit, unit variable cost, decrease in production volume, the rate of increase in variable cost, and a change in fixed cost. Furthermore, this parer discusses the nam issues related to practices and regulation of the compensation for fishery damages in the current Fishery Act of Korea and suggests some appraisal methods which will be able to lead to theoretically correct and fair compensation for fisheries damages resulting from large-scale public projects.

  • PDF

A Model for Improving Performance Structure of Build-Transfer-Lease in Small Public Educational Facilities (소규모 공공교육 시설 임대형 민자사업(BTL)의 수행구조 개선모델)

  • Kim, Seung-Sup;Jung, Sang-Min;Koo, Choong-Wan;Koo, Kyo-Jin;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.116-124
    • /
    • 2007
  • It is Increasing that requirements of social infrastructure which includes educational, welfare, cultural facilities for public. Government introduced BTI(Build-Transfer-Lease) as a PFI(Private Financial Initiative) system. This research is about BTL projects in small public educational facilities. Some problems when BTL system is applied to small public educational facilities are identified, and the reason of those problems are examined. This research proposes alternatives in a institutional way and it proposes improvements in contractual structure of consortium when BTL system is applied. Based on reasonable system, it promotes creativeness and effectiveness of a project, and it makes local minor construction companies participate in BTL project without difficulties as mentioned.

Improvement for Asset Management of Sewage Treatment Facilities (하수처리시설 대수선비 자산화 영향분석 및 제도개선 방안)

  • Park, Ha Jin;An, Man Sun;Cho, Nam Ho;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.285-293
    • /
    • 2011
  • Sewage treatment facilities are growing rapidly in quantitatively and qualitatively. However, privatization such as up-size and professionalism, etc. are insufficient, compared to global companies' cases. Infrastructure Asset management has not been applied widely despite of sewage treatment facilities are one of the most critical social infrastructure. Maintenance, repair, and rehabilitation (R&R) practices of sewage treatment facilities have been studied and infrastructures asset management techniques have been applied. Cost model which makes it possible to calculate managerial costs such as major cost, etc. needs to be developed only with project basic information when proceeding new sewage treatment facility construction and management and overseas sewage project. Effects to converse major repair cost into capital, application of sewage treatment facility's asset management, expected effects, etc. were analyzed and suggested an alternative on the improvements of legal system.

A Study for Quality Improvement of Three-dimensional Body Measurement Data (3차원 인체치수 조사 자료의 품질 개선을 위한 연구)

  • Park, Sun-Mi;Nam, Yun-Ja;Park, Jin-Woo
    • Journal of the Ergonomics Society of Korea
    • /
    • v.28 no.4
    • /
    • pp.117-124
    • /
    • 2009
  • To inspect the quality of data collected from a large-scale body measurement and investigation project, it is necessary to establish a proper data editing process. The three-dimensional body measurement may have measuring errors caused from measurer's proficiency or changes in the subject's posture. And it may also have errors caused in the process of algorithm expressing the information obtained from the three-dimensional scanner into numerical values, and in the course of data-processing dealing with numerous data for individuals. When those errors are found, the quality of the measured data is deteriorated, and they consequently reduce the quality of statistics which was conducted on the basis of it. Therefore this study intends to suggest a new way to improve the quality of the data collected from the three-dimensional body measurement by proposing a working procedure identifying data errors and correcting them from the whole data processing procedure-collecting, processing, and analyzing- of the 2004 Size Korea Three-dimensional Body Measurement Project. This study was carried out into three stages: Firstly, we detected erroneous data by examining of logical relations among variables under each edit rule. Secondly, we detected suspicious data through independent examination of individual variable value by sex and age. Finally, we examined scatter-plot matrix of many variables to consider the relationships among them. This simple graphical tool helps us to find out whether some suspicious data exist in the data set or not. As a result of this study, we detected some erroneous data included in the raw data. We figured out that the main errors are not because of the system errors that the three-dimensional body measurement system has but because of the subject's original three-dimensional shape data. Therefore by correcting some erroneous data, we have enhanced data quality.

Project management service for Kazakhstan Express Residence (카자흐스탄 익스프레스 레지던스 PM 프로젝트 사례 발표)

  • Jung, Jae-Ho;Park, Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.19-24
    • /
    • 2007
  • Due to the decreasing of Korean Construction market situation, recently a lot of medium & small size contractors, engineering firms and consulting firms are extending their business area to overseas market. To compare with 80${\sim}$90's situation at that time only Contractor provide service to overseas but in recent, there are number of Design, CM/PM and other consulting services which provide service to overseas. With this figures, the number of nation also increased from middle east and South east asian area to central asia and african nations and among them Kazakhstan has became as new market for the construction industry based on it oil money and up stream of real estimate market. Based on this fact, we will explain one of our recent project case for PM service in Almaty, Kazakhstan to show others who have interest to do business in their.

  • PDF

Design and Implementation of Version Control System for Meta Information Management of Source Codes (원시코드의 메타 정보 관리를 위한 버전 제어 시스템의 설계와 구현)

  • Oh, Sang-Yeob;Chang, Duk-Chul
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.3
    • /
    • pp.633-648
    • /
    • 1998
  • Rapid computing environment, change of the application structure, and various user demand will increase the demand of the software development. Version control is helpful to improve productivity using delta, and useful to establish component from existing data of source code. This paper presents the design and implementation of the version control system. which is composed of retrieval system and delta management system. In retrieval system, vanous retrieve methods arc proposed. This methods provides the process methodology with filename, content, size and date. Various retrieve methods arc important for the effective delta management. Meta data can be easily composed for the delta management by these methods. Compared with other systems, this implemented version control system has some advantage. First, for delta management, version maintenance for delta management becomes easier by integrating the forward and back-ward methods. Second, delta managent part of a project is to unite the forward and backward method. the effieiency of this system is to increased in management. Also, this system supports a thechnique of using the database and files for project repository and makes the version management more effective.

  • PDF

Problems and Guidelines for Improvements of Munhwa-Maul with Special Reference to Mueur Munhwa-Maul and Umo Munhwa-Maul(a modern village) in Kyeongbook (경상북도의 문화마을에 대한 문제점 및 개선방향 -어모지구와 무을지구를 중심으로-)

  • 이관희
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.3
    • /
    • pp.45-51
    • /
    • 1998
  • This research is concerned with environment problems related to Munhwa-Maul where Korean government are financially much supporting in developing housing sites and constructing houses. The purposes of this research are to find out the problems and to present the practical guidelines in order to improve an environmental quality of Munhwa-Maul in which will be under construction in the near future. The method for finding out the problems are based upon the most atisfaction and dissatisfaction of residents with opened interview. Both Mueur Munhwa-Maul and Umo Munhwa-Maul are considered for this research because Mueur Munhwa-Maul is characterized with a modern village where is located far from the city while Uo Munhwa-Maul, near the city. Also, these Munhwa-Mauls have been firstly constructed. The interview participants are 34 persons in all. They are confined to Mueur Munhwa-Maul and Umo Munhwa Maul that have been firstly constructed in Kyeongook. According to the interviews, each 60% of both Mueur Munhwa-Maul interview participants and Umo Munhwa-Maul ones have shown the their most positive satisfaction in a new housing and facility. It can be seen from that these figures that housing environment including facility of both Munhwa-Mauls is surely improved and successful. On the other hand, 43.8% of Mueur Munhwa-Maul participants and 14% of Umo Munhwa-Maul ones have particularly shown the most negative satisfaction in a size of housing lot. Also, 15.6% of Mueur Munhwa-Maul interview participant and 44% of Umo Munhwa-Maul ones have stated the most dissatisfaction in a traffic convenience. The reasons showing these differences are likely that 90% of Mueur Munhwa-Maul residents are farmer while 85% of Umo Munhwa-Maul ones are not farmer. With this results the purpose of munhwa-Maul project that government has been supporting and the reality of Umo Munhwa-Maul could be never coincident. Therefore, it can be inferred that housing layout should be reconsiderd to be appropriate for agriculture and that the government should carefully consider the contributions of new housing lot to real farmers. In addition, we can say that Munhwa-Maul project should be firstly accomplished in the district far from the city rather than near the city.

  • PDF

Decision of Available Soil Depth Based on Physical and Hydraulic Properties of Soils for Landscape Vegetation in Incheon International Airport

  • Jung, Yeong-Sang;Lee, Hyun-Il;Jung, Mun-Ho;Lee, Jeong-Ho;Kim, Jeong-Tae;Yang, Jae E
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.48 no.5
    • /
    • pp.522-527
    • /
    • 2015
  • Decision of available soil depth based on soil physical and hydraulic properties for the $3^{rd}$ Landscape Vegetation Project in the Incheon International Airport was attempted. The soil samples were collected from the 8 sites at different depths, 0-20 and 20-60cm, for the three project fields, A, B, and C area. Physical and chemical properties including particle size distribution, organic matter content and electrical conductivity were analyzed. Hydrological properties including bulk density and water holding capacity at different water potential, -6 kPa, -10 kPa, -33 kPa, and -1500 kPa were calculated by SPAW model of Saxton and Rawls (2006), and air entry value was calculated by Campbell model (1985). Based on physical and hydrological limitation, feasibility and design criteria of soil depth for vegetation and landfill were recommended. Since the soil salinity of the soil in area A area was $19.18dS\;m^{-1}$ in top soil and $22.27dS\;m^{-1}$ in deep soil, respectively, landscape vegetation without amendment would not be possible on this area. Available soil depth required for vegetation was 2.51 m that would secure root zone water holding capacity, capillary fringe, and porosity. Available soil depth required for landscape vegetation of the B area soil was 1.51 m including capillary fringe 0.14 m and available depth for 10% porosity 1.35 m. The soils in this area were feasible for landscape vegetation. The soil in area C was feasible for bottom fill purpose only due to low water holding capacity.